Inspections for the day of: Monday, January 6, 2020.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS20-00002 ESC-Conference1/3/20201/6/20201/7/2020 12:45:58 PMAFAIL
Dumped washout, trackout to victory.
ESC19-00086 General Inspection1/6/20201/6/20201/6/2020 2:10:48 PM CANC
ESC18-00513 Aging Inspection1/6/20201/6/20201/6/2020 1:52:14 PM PASS
No disturbance, all work in home.
ESC19-00091 General Inspection1/6/20201/6/20201/6/2020 12:25:01 PM PART
Sent message to Noah to make sure paint and drywall crews use a washout, some thrown right out door.
No major esc issues, no runoff down hill.
ESC18-01340 Aging Inspection1/6/20201/6/20201/6/2020 12:08:09 PM PASS
Basement completed and backfill back in place. Lot access is from alley, no trackout or issues.
ESC19-00083 General Inspection1/6/20201/6/20201/6/2020 11:54:02 AM PASS
Still needs landscaping.
ESC18-01692 General Inspection1/6/20201/6/20201/6/2020 11:22:23 AM PASS
Waiting for landscaping.
ESC17-00078 BMP Violation1/2/20201/6/20201/6/2020 11:07:43 AMAPASS
Strrets and sidewalk look cleaned. Trucks dropping of loads of clean rock.
ESC19-01386 General Inspection12/17/20191/6/20201/6/2020 10:53:32 AMPPASS
Lot has survey stakes, no building activity.
ESC19-01545 General Inspection1/6/20201/6/20201/6/2020 10:35:38 AMPPASS
WIP on foundation, no workers on site at time of inspection. Washouts at end of street and in use.
No esc issues.
ESC18-01286 DOC - Permit Finaled1/6/20201/6/20201/6/2020 10:34:49 AMPPASS
ESC19-01462 BMP Violation1/3/20201/6/20201/6/2020 10:20:45 AMAFAIL
Washout dumped. Talked to excavator and they will get it cleaned.
Fine levied on site, pictures and notice sent to RP.
ESC19-00134 General Inspection1/6/20201/6/20201/6/2020 9:52:45 AM DEFR
To be finaled by bld inspector.
ESC18-01289 General Inspection1/6/20201/6/20201/6/2020 9:51:28 AM PASS
Entrance is off fed way. Apron is paved to rock. Site recently swept. Working on pads, no ointention to pour until weather is better, next buildings aren't scheduled to arrive for 2 months. No blown trash behind site.