Inspections for the day of: Wednesday, January 9, 2019.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-00025 Aging Inspection1/9/20191/9/20191/9/2019 2:59:39 PM PASS
Site idle, demo completed. Some stockpiles, people are parking in dirt along road.
ESC18-00003 General Inspection1/9/20191/9/20191/9/2019 2:46:13 PM CANC
ESC18-00003 DOC - Permit Finaled1/9/20191/9/20191/9/2019 2:46:08 PMPPASS
Expired. No activity on building permit for over 9 months, no signs of activity.
ESC13-00193 General Inspection1/9/20191/9/20191/9/2019 2:43:31 PM PASS
Sand dune circle only remaining area.
ESC18-00899 General Inspection1/9/20191/9/20191/9/2019 12:57:20 PMPPASS
No home building activity. All perimeter fences installed, road and sidewalk complete, new drains have inlet protection. No equipment or materials staged on site.
ESC18-00023 General Inspection1/9/20191/9/20191/9/2019 12:47:32 PM PASS
Site is graded and inactive. No job trailer or equipment on site. Silt fence installed along path, lots of unused wattle on site, few stockpiles. Rock entrance on site.
ESC18-01130 Tracking Control1/9/20191/9/20191/9/2019 12:33:24 PMPPASS
Rock entrances installed at both access points off Franklin. No trackout onto road, looks like sweeper was just through area. Crane on site raising concrete walls. ITD/ACHD project of canal crossing and new I-84 bridge starts along site on Cloverdale.
ESC16-01027 General Inspection1/9/20191/9/20191/9/2019 12:22:16 PMPPASS
Interior work on last unit. Lots of material and trash stored on lot to the north of buildings, will need to be cleaned before completion.
ESC17-00510 General Inspection1/9/20191/9/20191/9/2019 12:09:53 PMPPASS
Grounds work complete. Crew on site prepping parking lot for completion.
ESC18-00476 General Inspection1/9/20191/9/20191/9/2019 12:01:06 PMPPASS
Site is contained and clean. Two stabalized entrances, areas are blocked off to force people to park in correct areas.
ESC18-01466 General Inspection1/9/20191/9/20191/9/2019 11:43:54 AMPPASS
Stockpile is surrounded by wattle. Rock entrance installed, DI on street protected. Site is graded and surveyed, no heavy equipment on site.
ESC18-00079 General Inspection1/9/20191/9/20191/9/2019 11:00:55 AM PASS
Few small disturbed areas, nothing leaving site.
ESC18-01333 General Inspection1/9/20191/9/20191/9/2019 10:57:21 AMPPASS
Foundation walls poured, outpak washout on site. Perimeter BMPs still in place. Some large piles of backfill on site. No ESC issues.
ESC16-01457 General Inspection1/9/20191/9/20191/9/2019 10:53:00 AM PASS
Hydroseeded and stable.
ESC18-00488 General Inspection1/8/20191/9/20191/9/2019 10:05:18 AMAPEND
Met with Dahle project manager on site. Work on water lines has begun, have not hit any ground water.
Lots of trackout, sweeper truck is ordered and scheduled. Will install entrance when work is done by entrance, currently there is no room.
ESC17-00774 General Inspection1/9/20191/9/20191/9/2019 9:43:45 AM PASS
Creek banks are stable.
ESC17-01656 Aging Inspection1/9/20191/9/20191/9/2019 9:38:51 AM PASS
Foundation has been poured, no work has begun on home.
ESC18-00652 General Inspection1/9/20191/9/20191/9/2019 9:29:26 AMPPASS
New lined entrance installed, no trackout. Mini excavator on site.
ESC17-01693 BMP Violation1/9/20191/9/20191/9/2019 9:25:46 AMPFAIL
Trackout onto street and bike lane, sent message to listed RP.
ESC18-00023 General Inspection1/9/20191/9/20191/9/2019 8:36:17 AMPCANC
ESC17-01386 Site Final1/4/20191/9/20191/9/2019 8:34:39 AMPPASS