ESC18-00025
| Aging Inspection | 1/9/2019 | 1/9/2019 | 1/9/2019 2:59:39 PM | | PASS |
|
|
Site idle, demo completed. Some stockpiles, people are parking in dirt along road.
|
ESC18-00003
| General Inspection | 1/9/2019 | 1/9/2019 | 1/9/2019 2:46:13 PM | | CANC |
|
|
|
ESC18-00003
| DOC - Permit Finaled | 1/9/2019 | 1/9/2019 | 1/9/2019 2:46:08 PM | P | PASS |
|
|
Expired. No activity on building permit for over 9 months, no signs of activity.
|
ESC13-00193
| General Inspection | 1/9/2019 | 1/9/2019 | 1/9/2019 2:43:31 PM | | PASS |
|
|
Sand dune circle only remaining area.
|
ESC18-00899
| General Inspection | 1/9/2019 | 1/9/2019 | 1/9/2019 12:57:20 PM | P | PASS |
|
|
No home building activity. All perimeter fences installed, road and sidewalk complete, new drains have inlet protection. No equipment or materials staged on site.
|
ESC18-00023
| General Inspection | 1/9/2019 | 1/9/2019 | 1/9/2019 12:47:32 PM | | PASS |
|
|
Site is graded and inactive. No job trailer or equipment on site. Silt fence installed along path, lots of unused wattle on site, few stockpiles. Rock entrance on site.
|
ESC18-01130
| Tracking Control | 1/9/2019 | 1/9/2019 | 1/9/2019 12:33:24 PM | P | PASS |
|
|
Rock entrances installed at both access points off Franklin. No trackout onto road, looks like sweeper was just through area. Crane on site raising concrete walls. ITD/ACHD project of canal crossing and new I-84 bridge starts along site on Cloverdale.
|
ESC16-01027
| General Inspection | 1/9/2019 | 1/9/2019 | 1/9/2019 12:22:16 PM | P | PASS |
|
|
Interior work on last unit. Lots of material and trash stored on lot to the north of buildings, will need to be cleaned before completion.
|
ESC17-00510
| General Inspection | 1/9/2019 | 1/9/2019 | 1/9/2019 12:09:53 PM | P | PASS |
|
|
Grounds work complete. Crew on site prepping parking lot for completion.
|
ESC18-00476
| General Inspection | 1/9/2019 | 1/9/2019 | 1/9/2019 12:01:06 PM | P | PASS |
|
|
Site is contained and clean. Two stabalized entrances, areas are blocked off to force people to park in correct areas.
|
ESC18-01466
| General Inspection | 1/9/2019 | 1/9/2019 | 1/9/2019 11:43:54 AM | P | PASS |
|
|
Stockpile is surrounded by wattle. Rock entrance installed, DI on street protected. Site is graded and surveyed, no heavy equipment on site.
|
ESC18-00079
| General Inspection | 1/9/2019 | 1/9/2019 | 1/9/2019 11:00:55 AM | | PASS |
|
|
Few small disturbed areas, nothing leaving site.
|
ESC18-01333
| General Inspection | 1/9/2019 | 1/9/2019 | 1/9/2019 10:57:21 AM | P | PASS |
|
|
Foundation walls poured, outpak washout on site. Perimeter BMPs still in place. Some large piles of backfill on site. No ESC issues.
|
ESC16-01457
| General Inspection | 1/9/2019 | 1/9/2019 | 1/9/2019 10:53:00 AM | | PASS |
|
|
Hydroseeded and stable.
|
ESC18-00488
| General Inspection | 1/8/2019 | 1/9/2019 | 1/9/2019 10:05:18 AM | A | PEND |
|
|
Met with Dahle project manager on site. Work on water lines has begun, have not hit any ground water. Lots of trackout, sweeper truck is ordered and scheduled. Will install entrance when work is done by entrance, currently there is no room.
|
ESC17-00774
| General Inspection | 1/9/2019 | 1/9/2019 | 1/9/2019 9:43:45 AM | | PASS |
|
|
Creek banks are stable.
|
ESC17-01656
| Aging Inspection | 1/9/2019 | 1/9/2019 | 1/9/2019 9:38:51 AM | | PASS |
|
|
Foundation has been poured, no work has begun on home.
|
ESC18-00652
| General Inspection | 1/9/2019 | 1/9/2019 | 1/9/2019 9:29:26 AM | P | PASS |
|
|
New lined entrance installed, no trackout. Mini excavator on site.
|
ESC17-01693
| BMP Violation | 1/9/2019 | 1/9/2019 | 1/9/2019 9:25:46 AM | P | FAIL |
|
|
Trackout onto street and bike lane, sent message to listed RP.
|
ESC18-00023
| General Inspection | 1/9/2019 | 1/9/2019 | 1/9/2019 8:36:17 AM | P | CANC |
|
|
|
ESC17-01386
| Site Final | 1/4/2019 | 1/9/2019 | 1/9/2019 8:34:39 AM | P | PASS |
|
|
|