ESC16-01650
| General Inspection | 10/11/2017 | 10/11/2017 | 10/16/2017 8:18:18 AM | | PASS |
|
|
Inspected 10-10. Some wattle gaps on south perimeter. Site was clean and free of trash and stored materials.
|
ESC16-01649
| General Inspection | 10/11/2017 | 10/11/2017 | 10/13/2017 1:05:53 PM | | CANC |
|
|
|
ESC15-00556
| General Inspection | 10/11/2017 | 10/11/2017 | 10/13/2017 1:05:00 PM | | CANC |
|
|
|
ESC17-00246
| General Inspection | 10/11/2017 | 10/11/2017 | 10/12/2017 12:20:56 PM | A | PASS |
|
|
Site clean. Dirt is high on silt fence on back slope. Will advise contractor to clean up. Has cleaning crew come through, site free of trash.
|
ESC16-00938
| General Inspection | 10/11/2017 | 10/11/2017 | 10/12/2017 12:20:27 PM | A | PASS |
|
|
Revegetation ongoing. Wattle still installed at entrance. Work complete.
|
ESC16-01370
| Site Final | 10/5/2017 | 10/11/2017 | 10/12/2017 12:14:50 PM | P | PASS |
|
|
House is complete. Landscaping finished, used zero scape and shrubs. DIs removed from down hill storm drains.
|
ESC16-01612
| General Inspection | 10/11/2017 | 10/11/2017 | 10/12/2017 10:16:34 AM | | PASS |
|
|
Site clean. Disturbed area is contained. Some discoloration on road but no loose trackout. Curb and gutters clean, DIs clean. Dumpster in use, site free of loose trash. Plastic sheeting being used to keep dust inside building. Very little dirt on side entrance but visible broom marks.
|
ESC16-01189
| General Inspection | 10/11/2017 | 10/11/2017 | 10/11/2017 4:28:27 PM | P | FAIL |
|
|
Silt fence along Emerald damaged. Sidewalk along Preece covered in dirt. Lots of dirt in parking area, none yet tracked out. Dumpster on sitr but lots of loose garbage blowing around. DI is clean.
|
ESC16-01601
| General Inspection | 10/4/2017 | 10/11/2017 | 10/11/2017 4:28:06 PM | P | FAIL |
|
|
Silt fence along Emerald damaged. Sidewalk along Preece covered in dirt. Lots of dirt in parking area, none yet tracked out. Dumpster on sitr but lots of loose garbage blowing around. DI is clean.
|
ESC16-01621
| General Inspection | 10/11/2017 | 10/11/2017 | 10/11/2017 3:55:10 PM | | PASS |
|
|
Final stabalization complete. Talked to business in area, they said work was done last year. Recommend closing out permit.
|
ESC16-01327
| Aging Inspection | 10/11/2017 | 10/11/2017 | 10/11/2017 3:24:13 PM | | DONE |
|
|
Private residence. No sign of dirtwork or construction activities, no permit displayed. No one home @ 3:20 10-11-17
|
ESC15-00957
| General Inspection | 10/5/2017 | 10/11/2017 | 10/11/2017 2:55:59 PM | A | PASS |
|
|
Nearing final completion. No dirt or track out. Inlet protection is about half full, will probably need to be cleaned before end of fall.
|
ESC17-00426
| General Inspection | 10/11/2017 | 10/11/2017 | 10/11/2017 2:44:20 PM | P | PASS |
|
|
Site contained and free of loose dirt. Worker was cleaning sidewalk when I pulled up. Area well maintained and clean.
|
ESC16-01006
| General Inspection | 10/11/2017 | 10/11/2017 | 10/11/2017 2:43:07 PM | P | PASS |
|
|
All material contained to site. Lots of dried stucco on property. There was someone cleaning sidewalks when I pulled up. Majority of neighborhood complete, no loose dirt being tracked.
|
ESC17-00227
| General Inspection | 10/11/2017 | 10/11/2017 | 10/11/2017 2:31:27 PM | P | PEND |
|
|
Trackout down drive and to Pierce Park Rd. No stabalized entrance. No washout, concrete was washed onto hill and ran down lot. Large pile of loose dirt, dust may be issue in future. No perimeter controls but natural buffer exist.
|
ESC16-01008
| Aging Inspection | 10/11/2017 | 10/11/2017 | 10/11/2017 12:34:29 PM | | CANC |
|
|
|
ESC17-00842
| General Inspection | 10/11/2017 | 10/11/2017 | 10/11/2017 12:28:33 PM | P | CANC |
|
|
|
ESC16-01410
| General Inspection | 10/11/2017 | 10/11/2017 | 10/11/2017 12:06:01 PM | | CANC |
|
|
|
ESC17-00858
| Random Inspection | 10/11/2017 | 10/11/2017 | 10/11/2017 11:39:50 AM | P | PASS |
|
|
Work in progress. No noted violations.
|
ESC17-01085
| Site Preparation | 10/11/2017 | 10/11/2017 | 10/11/2017 11:30:37 AM | P | PASS |
|
|
Did site walk through with contractor. BMPs installed and in place. Perimeter wattles, DIs, will preserve paved area. Addressed dust from demolition, water truck will be used.
|