Inspections for the day of: Thursday, October 12, 2017.
Number of inspections: 29
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-01610 Site Final10/10/201710/12/201710/19/2017 2:37:50 PMPDONE
ESC17-00799 General Inspection10/2/201710/12/201710/16/2017 3:28:17 PMPPASS
Clean site. Entrance used, washouts maintained and used, perimeter controls in place. Free from fugitive dust. DIs in place and clean.
ESC17-00270 Site Final10/2/201710/12/201710/16/2017 3:13:22 PMPPEND
WIP. Very clean, BMPs installed and used correctly.
ESC17-01088 General Inspection10/2/201710/12/201710/16/2017 2:38:52 PMPPASS
No WIP. Entire site has been tracked. Perimeter BMPs intact. Lots of trackout, called RP listed on permit to come get someone to clean up.
ESC15-01579 General Inspection10/10/201710/12/201710/16/2017 11:09:23 AMPPASS
Perimeter controls intact, no dirt going offsite. Large buffer between path and south side of project. Site maintained and free of trash. Most excavation is done, majority of work is building exterior & interior and landscaping.
ESC17-00860 General Inspection10/12/201710/12/201710/16/2017 10:43:02 AMPPASS
Check if piles of dirt are removed.
Contractor took care of piles.
ESC17-00302 General Inspection10/10/201710/12/201710/13/2017 3:28:04 PMAPASS
Ran into Jason Jones on site. He will be hydro seeding for knife river. Work on tank and haul road complete.
ESC16-01682 General Inspection10/12/201710/12/201710/13/2017 2:43:03 PM FAIL
Someone removed and piled gator guard. Sediment runoff going down the hill. Light rain during inspection. Attempted to call RP but getting bust signal.
ESC16-01719 General Inspection10/12/201710/12/201710/13/2017 2:32:21 PM PASS
Gator guard intact. Washout dug and used.Trash being thrown away. Free of trackout.
ESC17-01200 General Inspection10/12/201710/12/201710/12/2017 4:32:20 PMPPASS
Syman handling erosion control. Perimeter controls installed. Contractor will be storing fuel on site, said they will have containment and keep spill kits in area. Graders have been taking care of dust, very clean site for size of exposed area. Exposed area may exceed 5 acres. Most stormwater will drain to low spots on site. Permit displayed at entrance, SWPPP book in job trailer. Road free from track out.
ESC17-00169 General Inspection10/12/201710/12/201710/12/2017 4:08:44 PMPPASS
Vertical construction only. No earth disturbing activities. Pads are poured, mixer has perimeter controls. No spilled concrete visible.
ESC16-01617 General Inspection10/12/201710/12/201710/12/2017 4:06:56 PMPPASS
Perimeter loop paved. Entrance and exit are now paved road. Steel buildings are being erected on all poured pads. Steep slopes are protected and are in process of being stabalized with rocks. Area clean and free of trash. Central area is compacted and no visible dust blowing.
ESC17-01360 Site Preparation10/12/201710/12/201710/12/2017 3:42:08 PMPPEND
This is on East side of road. Please note it has same address as project across the street. Hasn't begun.
ESC17-00519 General Inspection10/12/201710/12/201710/12/2017 3:25:50 PMPPASS
Syman is handling inspections, last did 10-9. There are issues with trackout and the entrance, looks like people are going around. I sent a message to RP to fix situation. All dirt is contained to site, no dust visible. Currently they are installing sewer lines.
ESC16-00439 General Inspection10/12/201710/12/201710/12/2017 3:25:27 PMPPASS
Syman is handling inspections, last did 10-9. There are issues with trackout and the entrance, looks like people are going around. I sent a message to RP to fix situation. All dirt is contained to site, no dust visible. Currently they are installing sewer lines.
ESC17-01360 Site Preparation10/12/201710/12/201710/12/2017 3:19:53 PMPDONE
Under progress.
ESC16-01281 Aging Inspection10/12/201710/12/201710/12/2017 2:48:01 PM DONE
House complete, final stabalization completed.
ESC16-01418 Site Final10/12/201710/12/201710/12/2017 2:11:32 PMPDONE
Final stabalization completed.
ESC17-00326 Site Final10/12/201710/12/201710/12/2017 2:09:17 PMPPASS
Currently acting as a storage yard. Some gravel on sidewalk and street, caused by current work on neighboring properties.
ESC17-01165 General Inspection10/12/201710/12/201710/12/2017 2:07:26 PMPPASS
Site clean. Worker running compactor. Some loose gravel and dirt on sidewalk, I asked him to sweep it up before he leaves.
ESC17-01238 General Inspection10/12/201710/12/201710/12/2017 2:05:13 PMPPASS
Area clean. Some trackout but bobcat currently operating. Foundation looks fresh.
ESC17-00327 Site Final10/12/201710/12/201710/12/2017 2:02:27 PMPPEND
Area ready for grass. Sod on site but not installed. Will check again.
ESC17-00687 General Inspection10/12/201710/12/201710/12/2017 1:53:53 PMPFAIL
Lots of loose trash and lumber scraps on site. Loose gravel on sidewalk and curb.
ESC16-01056 Site Final10/12/201710/12/201710/12/2017 1:48:00 PMPPEND
Prepping for installation of lawn. Lots of dirt on sidewalk and gutter. Will recheck in week to see progress.
ESC17-00422 General Inspection10/10/201710/12/201710/12/2017 11:06:44 AMAPASS
check for permit sign, DI bags on vista.
Di bags and permit installed. Using entrance on Vista and exiting onto W Canal. Left note to please clean trackout at end of day.
ESC17-01085 General Inspection10/11/201710/12/201710/12/2017 10:47:48 AMPPASS
All material still in site. No dust, been keeping it wet. Asphalt still in use as haul roads. Advised to keep wet and keep an eye on dust.
ESC17-00860 General Inspection10/12/201710/12/201710/12/2017 10:30:34 AMAPASS
Area clean. Canal in back of property is free of dirt. A few big piles of dirt, contractor says excavator is coming to puish them back in as fill. Sidewalk and road clean. Painters are installing plastic sheeting as perimeter to keep it all on site. Will check week of 10\15 to see if dirt removed.
ESC17-00780 Random Inspection10/12/201710/12/201710/12/2017 9:51:14 AMPPASS
BMPs in place and site clean. Talked to contractor, they are planning on relocating driveway, adding some landscape rock, and reseeding in the next ten days.
ESC17-00825 Random Inspection10/12/201710/12/201710/12/2017 8:57:02 AMPPASS
Area has been tracked and hydroseeded. Final stabalization has been installed for demo.
Silt fence was not properly installed. Fence is falling in places and hasn't been trenched in. Will advise RP to pay attention to site and make sure to maintain.