ESC16-01610
| Site Final | 10/10/2017 | 10/12/2017 | 10/19/2017 2:37:50 PM | P | DONE |
|
|
|
ESC17-00799
| General Inspection | 10/2/2017 | 10/12/2017 | 10/16/2017 3:28:17 PM | P | PASS |
|
|
Clean site. Entrance used, washouts maintained and used, perimeter controls in place. Free from fugitive dust. DIs in place and clean.
|
ESC17-00270
| Site Final | 10/2/2017 | 10/12/2017 | 10/16/2017 3:13:22 PM | P | PEND |
|
|
WIP. Very clean, BMPs installed and used correctly.
|
ESC17-01088
| General Inspection | 10/2/2017 | 10/12/2017 | 10/16/2017 2:38:52 PM | P | PASS |
|
|
No WIP. Entire site has been tracked. Perimeter BMPs intact. Lots of trackout, called RP listed on permit to come get someone to clean up.
|
ESC15-01579
| General Inspection | 10/10/2017 | 10/12/2017 | 10/16/2017 11:09:23 AM | P | PASS |
|
|
Perimeter controls intact, no dirt going offsite. Large buffer between path and south side of project. Site maintained and free of trash. Most excavation is done, majority of work is building exterior & interior and landscaping.
|
ESC17-00860
| General Inspection | 10/12/2017 | 10/12/2017 | 10/16/2017 10:43:02 AM | P | PASS |
|
|
Check if piles of dirt are removed. Contractor took care of piles.
|
ESC17-00302
| General Inspection | 10/10/2017 | 10/12/2017 | 10/13/2017 3:28:04 PM | A | PASS |
|
|
Ran into Jason Jones on site. He will be hydro seeding for knife river. Work on tank and haul road complete.
|
ESC16-01682
| General Inspection | 10/12/2017 | 10/12/2017 | 10/13/2017 2:43:03 PM | | FAIL |
|
|
Someone removed and piled gator guard. Sediment runoff going down the hill. Light rain during inspection. Attempted to call RP but getting bust signal.
|
ESC16-01719
| General Inspection | 10/12/2017 | 10/12/2017 | 10/13/2017 2:32:21 PM | | PASS |
|
|
Gator guard intact. Washout dug and used.Trash being thrown away. Free of trackout.
|
ESC17-01200
| General Inspection | 10/12/2017 | 10/12/2017 | 10/12/2017 4:32:20 PM | P | PASS |
|
|
Syman handling erosion control. Perimeter controls installed. Contractor will be storing fuel on site, said they will have containment and keep spill kits in area. Graders have been taking care of dust, very clean site for size of exposed area. Exposed area may exceed 5 acres. Most stormwater will drain to low spots on site. Permit displayed at entrance, SWPPP book in job trailer. Road free from track out.
|
ESC17-00169
| General Inspection | 10/12/2017 | 10/12/2017 | 10/12/2017 4:08:44 PM | P | PASS |
|
|
Vertical construction only. No earth disturbing activities. Pads are poured, mixer has perimeter controls. No spilled concrete visible.
|
ESC16-01617
| General Inspection | 10/12/2017 | 10/12/2017 | 10/12/2017 4:06:56 PM | P | PASS |
|
|
Perimeter loop paved. Entrance and exit are now paved road. Steel buildings are being erected on all poured pads. Steep slopes are protected and are in process of being stabalized with rocks. Area clean and free of trash. Central area is compacted and no visible dust blowing.
|
ESC17-01360
| Site Preparation | 10/12/2017 | 10/12/2017 | 10/12/2017 3:42:08 PM | P | PEND |
|
|
This is on East side of road. Please note it has same address as project across the street. Hasn't begun.
|
ESC17-00519
| General Inspection | 10/12/2017 | 10/12/2017 | 10/12/2017 3:25:50 PM | P | PASS |
|
|
Syman is handling inspections, last did 10-9. There are issues with trackout and the entrance, looks like people are going around. I sent a message to RP to fix situation. All dirt is contained to site, no dust visible. Currently they are installing sewer lines.
|
ESC16-00439
| General Inspection | 10/12/2017 | 10/12/2017 | 10/12/2017 3:25:27 PM | P | PASS |
|
|
Syman is handling inspections, last did 10-9. There are issues with trackout and the entrance, looks like people are going around. I sent a message to RP to fix situation. All dirt is contained to site, no dust visible. Currently they are installing sewer lines.
|
ESC17-01360
| Site Preparation | 10/12/2017 | 10/12/2017 | 10/12/2017 3:19:53 PM | P | DONE |
|
|
Under progress.
|
ESC16-01281
| Aging Inspection | 10/12/2017 | 10/12/2017 | 10/12/2017 2:48:01 PM | | DONE |
|
|
House complete, final stabalization completed.
|
ESC16-01418
| Site Final | 10/12/2017 | 10/12/2017 | 10/12/2017 2:11:32 PM | P | DONE |
|
|
Final stabalization completed.
|
ESC17-00326
| Site Final | 10/12/2017 | 10/12/2017 | 10/12/2017 2:09:17 PM | P | PASS |
|
|
Currently acting as a storage yard. Some gravel on sidewalk and street, caused by current work on neighboring properties.
|
ESC17-01165
| General Inspection | 10/12/2017 | 10/12/2017 | 10/12/2017 2:07:26 PM | P | PASS |
|
|
Site clean. Worker running compactor. Some loose gravel and dirt on sidewalk, I asked him to sweep it up before he leaves.
|
ESC17-01238
| General Inspection | 10/12/2017 | 10/12/2017 | 10/12/2017 2:05:13 PM | P | PASS |
|
|
Area clean. Some trackout but bobcat currently operating. Foundation looks fresh.
|
ESC17-00327
| Site Final | 10/12/2017 | 10/12/2017 | 10/12/2017 2:02:27 PM | P | PEND |
|
|
Area ready for grass. Sod on site but not installed. Will check again.
|
ESC17-00687
| General Inspection | 10/12/2017 | 10/12/2017 | 10/12/2017 1:53:53 PM | P | FAIL |
|
|
Lots of loose trash and lumber scraps on site. Loose gravel on sidewalk and curb.
|
ESC16-01056
| Site Final | 10/12/2017 | 10/12/2017 | 10/12/2017 1:48:00 PM | P | PEND |
|
|
Prepping for installation of lawn. Lots of dirt on sidewalk and gutter. Will recheck in week to see progress.
|
ESC17-00422
| General Inspection | 10/10/2017 | 10/12/2017 | 10/12/2017 11:06:44 AM | A | PASS |
|
|
check for permit sign, DI bags on vista. Di bags and permit installed. Using entrance on Vista and exiting onto W Canal. Left note to please clean trackout at end of day.
|
ESC17-01085
| General Inspection | 10/11/2017 | 10/12/2017 | 10/12/2017 10:47:48 AM | P | PASS |
|
|
All material still in site. No dust, been keeping it wet. Asphalt still in use as haul roads. Advised to keep wet and keep an eye on dust.
|
ESC17-00860
| General Inspection | 10/12/2017 | 10/12/2017 | 10/12/2017 10:30:34 AM | A | PASS |
|
|
Area clean. Canal in back of property is free of dirt. A few big piles of dirt, contractor says excavator is coming to puish them back in as fill. Sidewalk and road clean. Painters are installing plastic sheeting as perimeter to keep it all on site. Will check week of 10\15 to see if dirt removed.
|
ESC17-00780
| Random Inspection | 10/12/2017 | 10/12/2017 | 10/12/2017 9:51:14 AM | P | PASS |
|
|
BMPs in place and site clean. Talked to contractor, they are planning on relocating driveway, adding some landscape rock, and reseeding in the next ten days.
|
ESC17-00825
| Random Inspection | 10/12/2017 | 10/12/2017 | 10/12/2017 8:57:02 AM | P | PASS |
|
|
Area has been tracked and hydroseeded. Final stabalization has been installed for demo. Silt fence was not properly installed. Fence is falling in places and hasn't been trenched in. Will advise RP to pay attention to site and make sure to maintain.
|