Inspections for the day of: Monday, October 14, 2019.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-01350 Site Final10/11/201910/14/201910/16/2019 11:47:05 AMPPASS
ESC18-00900 General Inspection10/14/201910/14/201910/16/2019 11:06:48 AMPPASS
Work is getting near north east corner, water truck running on site. No dust in work area, truck kicked up cloud going towards exit, water truck sprayed area after dust cloud. Very little trackout.
ESC19-00303 General Inspection10/14/201910/14/201910/16/2019 10:58:13 AMPPART
Blowing dust from vehicles, trucks are causing more of an issue than heavy equipment.
No trackout to Lake Hazel. Trenching looks completed.
ESC19-00304 General Inspection10/14/201910/14/201910/16/2019 10:51:33 AMPPASS
No activity on site. Windy, no blowing dust. Curbing along Lake Hazel completed.
ESC18-00760 General Inspection10/14/201910/14/201910/15/2019 8:46:53 AM CANC
ESC18-00965 General Inspection10/14/201910/14/201910/14/2019 2:39:26 PMPPASS
Trenches along home have been filled. Exterior of both home and ADU look completed. Lot is contained, no esc issues.
ESC17-00791 General Inspection10/14/201910/14/201910/14/2019 2:38:38 PM CANC
ESC17-01346 General Inspection10/14/201910/14/201910/14/2019 2:30:12 PM CANC
ESC15-00944 General Inspection10/14/201910/14/201910/14/2019 2:19:55 PM PASS
Back of lot still be used for work on church. Site contained, no issues.
ESC18-00965 Aging Inspection10/14/201910/14/201910/14/2019 2:19:33 PM CANC
entry error
ESC14-00788 Aging Inspection10/14/201910/14/201910/14/2019 12:11:06 PM PASS
WIP on 2 homesites. Entire site is clean. Any issues will be brought to the individual builders attention.
ESC16-01560 General Inspection10/14/201910/14/201910/14/2019 11:58:56 AM PASS
Still has stockpiles being added to site. No ESC issues, everything is contained.
ESC18-01466 General Inspection10/11/201910/14/201910/14/2019 11:15:09 AMPPASS
Backfill being placed back in foundation. Water truck on site, washout on site. Benjamin is clean. No trash, some steel beams stored on site. Large backfill pile is stabalized.
ESC17-00470 Aging Inspection10/14/201910/14/201910/14/2019 10:57:48 AM PASS
Spoke with foreman of new townhomes. Will keep street clean and have everyone move when curb sweeper comes. Going to try andd get phase 2 poured before winter.
ESC19-01161 General Inspection10/14/201910/14/201910/14/2019 10:20:36 AMPPASS
WIP on foundation. No dumped washout at site, did not see a washout area, may be haulded off. Nothing leaving site. Vinyl fence installed along south perimeter isolationg site from canal. New sidewalk poured along Glenwood.
ESC19-00156 General Inspection10/14/201910/14/201910/14/2019 10:20:04 AMPPASS
WIP on foundation. No dumped washout at site, did not see a washout area, may be haulded off. Nothing leaving site. Vinyl fence installed along south perimeter isolationg site from canal. New sidewalk poured along Glenwood.