ESC19-00994
| General Inspection | 10/17/2019 | 10/17/2019 | 10/22/2019 12:18:47 PM | P | PASS |
|
|
Crew starting to install wattle on lower area west of Bogus Basin Rd where grading completed. No construction activity today. No blowouts or failures from rain events.
|
ESC18-01458
| Aging Inspection | 10/17/2019 | 10/17/2019 | 10/21/2019 11:16:55 AM | | PASS |
|
|
Entire block is framed. Trash is clean, trash crane on site cleaning out boxes.
|
ESC19-00324
| General Inspection | 10/14/2019 | 10/17/2019 | 10/21/2019 10:16:16 AM | A | FAIL |
|
|
All current work is on seweer on Warem Springs and Teresa. Crew has hose coming from line, oily sheen running down Teresa. Graded lots on site have no berms. no water bars or checks on any of the roads.
|
ESC06-01306
| General Inspection | 10/17/2019 | 10/17/2019 | 10/18/2019 10:51:42 AM | | PASS |
|
|
Met with foreman on site. Currently doing concrete work on drive and sidewalks. Two ecopans on site, both are nearly full. Stucco crews are also using washout. Large dumpster on site, no loose or blowing trash. Gator guard on inside perimeter of fence.
|
ESC17-01488
| Site Final | 10/7/2019 | 10/17/2019 | 10/18/2019 9:52:43 AM | P | PASS |
|
|
|
ESC18-01578
| Site Final | 10/17/2019 | 10/17/2019 | 10/18/2019 9:39:27 AM | P | PASS |
|
|
|
ESC19-00542
| General Inspection | 10/17/2019 | 10/17/2019 | 10/17/2019 2:51:21 PM | P | PASS |
|
|
No current dewatering. Crews digging swales deeper, engineers were not happy with drainage of material. Looking for approvals to change sewer routing and be able to bore instead of trenching through street. Water truck will be back to site Monday, no dust issues. Diesel tank on site, is double walled, will get spec sheet on site.
|
ESC18-00844
| General Inspection | 10/17/2019 | 10/17/2019 | 10/17/2019 2:17:08 PM | P | PASS |
|
|
WIP, lot contained.
|
ESC18-00141
| General Inspection | 10/17/2019 | 10/17/2019 | 10/17/2019 2:16:44 PM | | PASS |
|
|
Home is completed and lot landscaped. Trash box still on neighboring lot.
|
ESC17-00640
| General Inspection | 10/17/2019 | 10/17/2019 | 10/17/2019 2:13:55 PM | | PASS |
|
|
Will final in spring when sure hillside is stable.
|
ESC19-00998
| General Inspection | 10/17/2019 | 10/17/2019 | 10/17/2019 12:35:50 PM | P | PASS |
|
|
No activity on site.
|
ESC19-00696
| General Inspection | 10/17/2019 | 10/17/2019 | 10/17/2019 12:35:22 PM | P | PASS |
|
|
Site clean and contained.
|
ESC19-00927
| General Inspection | 10/17/2019 | 10/17/2019 | 10/17/2019 12:32:32 PM | P | PASS |
|
|
Large excavation for seepage bed. Rocks for rockwall on site. Nothing leaving site.
|
ESC18-00311
| Site Final | 10/17/2019 | 10/17/2019 | 10/17/2019 12:29:11 PM | P | PASS |
|
|
Home is completed and landscaped. Will continue to monitor.
|
ESC18-00946
| General Inspection | 10/17/2019 | 10/17/2019 | 10/17/2019 12:25:16 PM | P | PASS |
|
|
No new activity, BMPs will need repair.
|
ESC18-00498
| General Inspection | 10/17/2019 | 10/17/2019 | 10/17/2019 12:24:47 PM | P | PASS |
|
|
No new construction in area. Some permits have been applied for. Job trailer is now in section.
|
ESC16-00406
| General Inspection | 10/17/2019 | 10/17/2019 | 10/17/2019 12:16:51 PM | | PASS |
|
|
Neighborhood common aras and empty lots stabalized. Lots with work are responsible for their own BMPs. Site rp is on site.
|
ESC19-00994
| General Inspection | 10/17/2019 | 10/17/2019 | 10/17/2019 12:04:30 PM | P | PASS |
|
|
Major earthwork expected to be done in two weeks. Syman has took samples to determine fertilizer mix to use in hydroseeder. Topsoil is being stockpiled. No issues at time of inspection.
|
ESC17-00190
| General Inspection | 10/17/2019 | 10/17/2019 | 10/17/2019 11:53:57 AM | | PASS |
|
|
No new building activity. Landscapers on site and storing material on road.
|
ESC18-01490
| Aging Inspection | 10/17/2019 | 10/17/2019 | 10/17/2019 10:59:05 AM | | CANC |
|
|
|
ESC18-01490
| DOC - Permit Finaled | 10/17/2019 | 10/17/2019 | 10/17/2019 10:58:59 AM | P | PASS |
|
|
|
ESC17-01287
| General Inspection | 10/17/2019 | 10/17/2019 | 10/17/2019 10:49:02 AM | | PASS |
|
|
Has been hydroseeded, will continue to monitor.
|
ESC18-01022
| General Inspection | 10/17/2019 | 10/17/2019 | 10/17/2019 10:35:10 AM | P | PASS |
|
|
Track Utilities on site. Material being stockpiled for road bed. Still plan on paving this year. Pond will need to be cleaned, plan is to add inlet and outlets when paved. RP wants to have a meeting on site to go over winter stabalization.
|
ESC15-00857
| General Inspection | 10/17/2019 | 10/17/2019 | 10/17/2019 10:10:59 AM | | PASS |
|
|
All lots that aren't being built are stable. Any issues with building lots are being directed to site RPs.
|
ESC18-01767
| General Inspection | 10/17/2019 | 10/17/2019 | 10/17/2019 10:10:02 AM | P | PASS |
|
|
Trash is starting to fill up, rest of site is clean.
|
ESC19-01100
| General Inspection | 10/17/2019 | 10/17/2019 | 10/17/2019 10:08:39 AM | P | FAIL |
|
|
Started on foundation. Looks like some washout or pump truck was leaking on site. Picture sent to RP, follow up scheduled.
|
ESC19-00396
| General Inspection | 10/17/2019 | 10/17/2019 | 10/17/2019 9:52:13 AM | P | PASS |
|
|
Site is clean, trash removed. Will need to watch silt fence and hillside on southwest. Roof will drain to area and is close to edge.
|
ESC18-01447
| General Inspection | 10/17/2019 | 10/17/2019 | 10/17/2019 9:35:31 AM | P | FAIL |
|
|
Form trailers now off site. Washout that was parked over not cleaned. New entrance needs to be installed. Hillside has no hydroseeding or stabalization.
|