Inspections for the day of: Thursday, October 19, 2017.
Number of inspections: 24
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-01561 General Inspection10/19/201710/19/201710/24/2017 12:43:38 PM PASS
No new activities or disturbance.
ESC16-01056 Site Final10/12/201710/19/201710/24/2017 12:21:03 PMADONE
Check to see if landscaping installed and site cleaned.
ESC17-00327 Site Final10/12/201710/19/201710/24/2017 12:19:18 PMADONE
ESC16-01076 General Inspection10/19/201710/19/201710/24/2017 10:43:19 AM PASS
No WIP. Site is finished and stabalized.
ESC17-00013 General Inspection10/18/201710/19/201710/24/2017 9:51:59 AMPPASS
No discharge. Not much active ground disturbance at site.
ESC16-00489 Random Inspection10/19/201710/19/201710/19/2017 3:11:03 PMPPASS
Work area clean.
ESC16-01593 Random Inspection10/19/201710/19/201710/19/2017 3:05:04 PMPPASS
landscaping complete. Site clean, interior work in progress.
ESC16-01651 Random Inspection10/19/201710/19/201710/19/2017 1:01:29 PMPPEND
Doing sidewalk and curb along hill. Dumping washout onto empty lot. Called RP, said he would get it taken care of.
ESC17-00625 General Inspection10/19/201710/19/201710/19/2017 12:30:03 PMAPASS
Dewatering currently going on. Pumping into a seepage bed with no outlets, water filtering through ground. Syman is doing inspections. Site is in good condition.
ESC17-00111 General Inspection10/19/201710/19/201710/19/2017 12:08:10 PMAPASS
WIP on sidewalks, concrete washouts in use. Talke to RP, said they will pave soon and Syman is doing inspections, verified completed inspection in SWPPP. Perimeter control intact along canal and no sign of dust.
ESC16-00905 General Inspection10/19/201710/19/201710/19/2017 12:07:50 PMPPASS
WIP on sidewalks, concrete washouts in use. Talke to RP, said they will pave soon and Syman is doing inspections, verified completed inspection in SWPPP. Perimeter control intact along canal and no sign of dust.
ESC17-00443 General Inspection10/19/201710/19/201710/19/2017 11:47:54 AMPPASS
SIte and dirt work complete.
ESC17-00005 General Inspection10/19/201710/19/201710/19/2017 11:47:01 AMPPASS
Site work complete. Some storage out front for material.
ESC15-00504 General Inspection10/19/201710/19/201710/19/2017 11:42:09 AMPPASS
Mojority of apartments done and leased. Most remaining construction is for interior and landscape. Area is clean and free of trackout.
ESC15-01420 General Inspection10/19/201710/19/201710/19/2017 11:24:09 AM PASS
WIP on single family homes. Lots not being used are stabalized and self contained. Currently doing foundation on one lot. Some loose dirt but they are currently running excavator.
ESC16-00051 DOC - Permit Finaled10/19/201710/19/201710/19/2017 11:07:19 AMPPASS
ESC16-00051 DOC - Permit Finaled10/19/201710/19/201710/19/2017 11:06:59 AMPPASS
ESC16-00943 DOC - Permit Finaled10/19/201710/19/201710/19/2017 10:47:49 AMPPASS
ESC14-01063 General Inspection10/19/201710/19/201710/19/2017 10:35:32 AM PASS
WIP on SFH. Perimeter controls in place, DIs protected. Washout built and being used.
ESC15-00857 General Inspection10/19/201710/19/201710/19/2017 10:34:42 AM PASS
Only access road in place. Construction entrances on both ends of road. Homesites are still all vegetated.
ESC17-00140 Random Inspection10/19/201710/19/201710/19/2017 9:19:26 AMPCANC
clean
ESC17-00140 Site Preparation10/19/201710/19/201710/19/2017 9:14:54 AMPCANC
ESC15-01210 General Inspection10/19/201710/19/201710/19/2017 9:10:18 AM PASS
Neighborhood BMPs in place. Very little trash or trackout. May need some BMP on hills and sidewalk perimeters when weather moves in.
ESC13-00193 General Inspection10/19/201710/19/201710/19/2017 8:51:01 AM PASS
1 SFH under construction. Perimeter controls in place and dirt contained to site.