ESC19-00509
| Site Preparation | 10/22/2019 | 10/22/2019 | 10/23/2019 12:08:23 PM | A | PASS |
|
|
Series of connected ponds dug for dewatering. All water staying on lot, have permission to use neighboring parcel. No discharges. Plan on doing tap today and being done after one day.
|
ESC18-01682
| General Inspection | 10/22/2019 | 10/22/2019 | 10/23/2019 9:30:28 AM | | PASS |
|
|
Lot contained, no esc issues.
|
ESC19-00114
| General Inspection | 10/22/2019 | 10/22/2019 | 10/23/2019 8:39:38 AM | P | PASS |
|
|
Lot has been hydroseeded on south side. Home exterior looks completed, no issues at time of inspection.
|
ESC18-00999
| Aging Inspection | 10/22/2019 | 10/22/2019 | 10/22/2019 1:55:16 PM | | PASS |
|
|
All work done from front, large fence peventing full view.
|
ESC17-00985
| General Inspection | 10/22/2019 | 10/22/2019 | 10/22/2019 1:51:21 PM | | PASS |
|
|
Fence replaced and gate closed. Hillside is revegetating, no issues at site.
|
ESC19-00402
| General Inspection | 10/22/2019 | 10/22/2019 | 10/22/2019 12:02:05 PM | P | PEND |
|
|
No current issues, truck and trailer parked on dirt, is raining and will probably cause trackout. Allk materials on site, no blowing trash, trash box on site.
|
ESC19-00082
| General Inspection | 10/22/2019 | 10/22/2019 | 10/22/2019 11:53:59 AM | P | PASS |
|
|
Backfill is all stored uphill from home. Sidewalk and road are clean. Trenching in place for water and utilities. Silt fence in ok shape. No issues at site.
|
ESC18-01235
| General Inspection | 10/22/2019 | 10/22/2019 | 10/22/2019 11:31:27 AM | | PASS |
|
|
All workers parked on street, entire site bare. Giant piles of backfill are gone, looks like they have been graded out on site. Nothing leaving site, rain at time of inspection.
|
ESC18-01687
| General Inspection | 10/22/2019 | 10/22/2019 | 10/22/2019 11:22:38 AM | | PASS |
|
|
Working on final sprinklers and hydroseeded on site. Parking lot completed and paved. Area is clean, shoulde be done with everything in a few weeks.
|
ESC18-00947
| Aging Inspection | 10/22/2019 | 10/22/2019 | 10/22/2019 10:47:31 AM | | CANC |
|
|
|
ESC18-00947
| DOC - Permit Finaled | 10/22/2019 | 10/22/2019 | 10/22/2019 10:47:25 AM | P | PASS |
|
|
|
ESC18-00769
| Aging Inspection | 10/22/2019 | 10/22/2019 | 10/22/2019 10:46:52 AM | | PASS |
|
|
No disturbances, work looks completed.
|
ESC19-01100
| BMP Violation | 10/17/2019 | 10/22/2019 | 10/22/2019 10:35:47 AM | A | FAIL |
|
|
No corrections made
|
ESC18-01223
| Aging Inspection | 10/22/2019 | 10/22/2019 | 10/22/2019 9:52:36 AM | | PASS |
|
|
No disturbances, looks completed.
|
ESC18-00804
| General Inspection | 10/22/2019 | 10/22/2019 | 10/22/2019 9:41:48 AM | | PASS |
|
|
Curbing and sidewalks completed. Sewer work on Betherl and site, some trenching. Parking lot not paved yet.
|