Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-00190 Aging Inspection10/24/201710/24/201710/27/2017 1:37:24 PM PASS
Work completed on exterior. Landscaped and stabalized.
ESC17-00422 General Inspection10/23/201710/24/201710/26/2017 2:26:26 PMPPASS
see how Canal street entrance looks...
Canal and Vista free from trackout.
ESC17-01036 General Inspection10/24/201710/24/201710/24/2017 3:05:01 PMPCANC
ESC17-00100 DOC - Permit Finaled10/24/201710/24/201710/24/2017 2:37:06 PMPPASS
ESC16-00617 General Inspection10/24/201710/24/201710/24/2017 2:05:44 PM PASS
No construction activity.
ESC16-00353 General Inspection10/24/201710/24/201710/24/2017 2:01:23 PM PASS
Controls in place, Dis at bottom of hill full of debris, called RP and asked for them to be cleaned.
ESC17-01360 Site Preparation10/24/201710/24/201710/24/2017 12:12:15 PMPPASS
Clearing and grubbing in process. Water truck on site, contractor is hauling away trash dumped on site. Entrance constructed. Asked GC to make sure traffic flows correct way to avoid using exit without a rock pad.
ESC16-01076 DOC - Permit Finaled10/24/201710/24/201710/24/2017 10:42:56 AMPPASS
ESC15-00556 General Inspection10/24/201710/24/201710/24/2017 10:16:58 AMAPASS
WIP on multiple homes all in different stages of completion. All foundations have been poured. Area is clean and free of dirt and waste. Foothill perimeter in good shape with wattles on the grades.
ESC17-00774 General Inspection10/24/201710/24/201710/24/2017 9:50:39 AMAPASS
WIP. No geojute yet installed.
ESC16-00489 General Inspection10/24/201710/24/201710/24/2017 9:49:41 AMAPASS
Clean. Area above creek has been stabalized.
ESC17-00104 General Inspection10/24/201710/24/201710/24/2017 9:39:47 AM PASS
Clean. Syman addressed issues discussed last week.