Inspections for the day of: Thursday, October 24, 2019.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-00774 General Inspection10/24/201910/24/201910/25/2019 10:13:14 AM PASS
Barber Valley HOA is taking care of watering and trash cleanup.
ESC17-01491 General Inspection10/24/201910/24/201910/25/2019 10:12:09 AM PASS
Need to do final walk throug and close permit.
ESC18-00476 Site Final10/17/201910/24/201910/25/2019 9:43:46 AMPPASS
ESC18-01171 General Inspection10/24/201910/24/201910/24/2019 12:32:54 PM PASS
Will need to talk to hillside engineering to see if road to back is permanent.
ESC18-01551 Aging Inspection10/24/201910/24/201910/24/2019 12:13:25 PM CANC
ESC18-01551 DOC - Permit Finaled10/24/201910/24/201910/24/2019 12:13:18 PMPPASS
ESC18-01599 Aging Inspection10/24/201910/24/201910/24/2019 12:10:31 PM CANC
ESC18-01599 DOC - Permit Finaled10/24/201910/24/201910/24/2019 12:10:24 PMPPASS
ESC18-01612 Aging Inspection10/24/201910/24/201910/24/2019 11:59:12 AM PASS
All work looks complete.
ESC18-00977 General Inspection10/24/201910/24/201910/24/2019 11:44:54 AM PASS
Nearly done, still some landscape materials in parking lot.
ESC18-01530 Aging Inspection10/24/201910/24/201910/24/2019 11:37:34 AM CANC
ESC18-01530 DOC - Permit Finaled10/24/201910/24/201910/24/2019 11:37:27 AMPPASS
ESC18-01600 Aging Inspection10/24/201910/24/201910/24/2019 10:28:07 AM CANC
ESC18-01600 DOC - Permit Finaled10/24/201910/24/201910/24/2019 10:28:01 AMPPASS
Expired. All work completed and area stable. No BLD inspections since 03/2019
ESC19-01125 General Inspection10/14/201910/24/201910/24/2019 9:50:55 AMPPASS
Silt fence along southern perimeter. Two stabalized entrances. Site has been bermed all the way around, all below grade of roads.
No activity at time of inspection, no ESC issues.
ESC18-01411 General Inspection10/24/201910/24/201910/24/2019 9:11:43 AM PASS
WIP on steel frame. All materials stored on site. No dust or trackout. No ESC issues.
ESC18-01636 General Inspection10/22/201910/24/201910/23/2019 10:59:15 AMAPASS
Engineer on site monitoring excavation and dewatering for contanimation. Pumps will go into lined pond, if needed decontanimation system will be broughjt to site to clean water before discharge from pond. Bad dirt is being seperated and will be hauled off site is past limits of contanimation set by DEQ.