ESC18-01292
| Tracking Control | 10/23/2018 | 10/25/2018 | 10/31/2018 10:14:50 AM | P | PART |
|
|
See if backfill spilloverr and trackout is cleaned up. Backfill cleaned and street swept up. Still some dirt in gutters, street mostly clean.
|
ESC17-01287
| General Inspection | 10/25/2018 | 10/25/2018 | 10/31/2018 9:39:23 AM | | PART |
|
|
BMPs in place, wattle needs to be maintained. Needs to be trenched in.
|
ESC17-00513
| Site Final | 10/25/2018 | 10/25/2018 | 10/26/2018 2:16:24 PM | P | PASS |
|
|
|
ESC17-01542
| Aging Inspection | 10/25/2018 | 10/25/2018 | 10/26/2018 11:42:09 AM | | PASS |
|
|
Exterior work complete, no landscaping installed. Both neighboring homes are under construction.
|
ESC17-01783
| General Inspection | 10/25/2018 | 10/25/2018 | 10/26/2018 11:13:37 AM | | FAIL |
|
|
Duplex. Stucco has been washed out onto sidewalk and gutter. Site is a mess. Correction sent to listed RP.
|
ESC17-01414
| General Inspection | 10/25/2018 | 10/25/2018 | 10/26/2018 11:00:46 AM | | FAIL |
|
|
All foundations poured. Two track steers on site moving backfill. Alley behind homes is dirt covered. Old washout has been removed and dumped over the edge behind homes. Lots of assorted lose trash on ground. Inlets are protected.
|
ESC18-00027
| General Inspection | 10/25/2018 | 10/25/2018 | 10/26/2018 10:51:23 AM | | PASS |
|
|
Work completed. Wattle has been installed along perimeter of creek. Lots of wind blown trash in creek, HOA or other group needs to over creek and work on keeping it clean.
|
ESC17-01519
| Site Final | 10/25/2018 | 10/25/2018 | 10/26/2018 10:17:49 AM | P | PASS |
|
|
|
ESC18-01178
| General Inspection | 10/17/2018 | 10/25/2018 | 10/26/2018 9:45:14 AM | P | PASS |
|
|
Foundation excavated. Wattles along front, silt fence on side, rock entrance installed. Broom and shovel on site, sidewalk and street swept.
|
ESC17-00513
| Site Final | 10/24/2018 | 10/25/2018 | 10/25/2018 3:42:17 PM | A | NR |
|
|
Rescheduled for 10/26. Need to see if public works wants witches hats removed from their project on fort st.
|
ESC18-00946
| General Inspection | 10/25/2018 | 10/25/2018 | 10/25/2018 12:54:33 PM | P | PASS |
|
|
Site is holding up, no ESC issues.
|
ESC18-01033
| General Inspection | 10/19/2018 | 10/25/2018 | 10/25/2018 12:07:16 PM | A | PASS |
|
|
Building is demoed, currently hauling rubble away. ater truck on site, workers spraying pile as it is being loaded to minimize dust. ESI plans on staging work and keeping parking lot in place as long as possible in order to minimize disturbed area.
|
ESC17-01651
| Aging Inspection | 10/25/2018 | 10/25/2018 | 10/25/2018 11:26:06 AM | | CANC |
|
|
|
ESC17-01651
| DOC - Permit Finaled | 10/25/2018 | 10/25/2018 | 10/25/2018 11:25:59 AM | P | PASS |
|
|
|
ESC16-00556
| General Inspection | 10/25/2018 | 10/25/2018 | 10/25/2018 10:53:11 AM | | PASS |
|
|
One homesite under construction, yard has been landscaped and is interior work only. Few poured foundations are sitting idle and overgrown. All vacant lots are week covered and stable.
|
ESC17-01671
| Aging Inspection | 10/25/2018 | 10/25/2018 | 10/25/2018 10:29:20 AM | | CANC |
|
|
|
ESC17-01671
| DOC - Permit Finaled | 10/25/2018 | 10/25/2018 | 10/25/2018 10:29:12 AM | P | PASS |
|
|
|