ESC19-00444
| General Inspection | 10/25/2019 | 10/28/2019 | 10/29/2019 12:57:54 PM | A | PASS |
|
|
No dumped washout, did not see concrete washout container at site. Trash is getting full, will need to empty and watch for wind blown.
|
ESC18-00020
| General Inspection | 10/28/2019 | 10/28/2019 | 10/29/2019 12:02:49 PM | | FAIL |
|
|
Washout dumped on lot 11 block 2. Some poor aim and spills at roll pans. Rest of block is clean. RP notified and follow up scheduled for next week.
|
ESC18-00809
| Aging Inspection | 10/28/2019 | 10/28/2019 | 10/29/2019 11:12:35 AM | | PASS |
|
|
WIP, garage still tyvek wrapped.
|
ESC18-01529
| General Inspection | 10/28/2019 | 10/28/2019 | 10/29/2019 10:31:17 AM | | PASS |
|
|
No outside disturbances. Materials for remodel stored on paved parking lot, all on pallets and clean.
|
ESC18-01430
| General Inspection | 10/28/2019 | 10/28/2019 | 10/28/2019 2:17:45 PM | | PASS |
|
|
Some work visible down on course, material stored on parking lot along 36th.
|
ESC15-00853
| General Inspection | 10/28/2019 | 10/28/2019 | 10/28/2019 2:12:34 PM | | PASS |
|
|
Dirtwork on western edge has begun, backfill still on site. Dumpster at site, pretty full, will need to watch for trash blowing away.
|
ESC18-00467
| General Inspection | 10/28/2019 | 10/28/2019 | 10/28/2019 2:04:58 PM | | CANC |
|
|
|
ESC19-00076
| General Inspection | 10/28/2019 | 10/28/2019 | 10/28/2019 12:46:11 PM | P | PASS |
|
|
Site is clean andcontained, washouts in use. All trash and storage on rear of site. Some new rock added to entrance, mix of crush and round rock, kind of small.
|
ESC19-01106
| General Inspection | 10/28/2019 | 10/28/2019 | 10/28/2019 12:36:05 PM | P | PASS |
|
|
No new activity, no trackout to Pierce.
|
ESC17-01479
| General Inspection | 10/28/2019 | 10/28/2019 | 10/28/2019 12:33:51 PM | | PASS |
|
|
One vacant lot left in development. Debris and landscape material have been dumped on lot, also looks like some dumped stucco.
|
ESC18-00982
| Aging Inspection | 10/28/2019 | 10/28/2019 | 10/28/2019 12:26:13 PM | | CANC |
|
|
|
ESC18-00982
| DOC - Permit Finaled | 10/28/2019 | 10/28/2019 | 10/28/2019 12:26:03 PM | P | PASS |
|
|
|
ESC19-00034
| General Inspection | 10/28/2019 | 10/28/2019 | 10/28/2019 12:05:16 PM | P | PART |
|
|
One grader operating on site. Pit run for road bed is being worked with water, some trackout. Sweeper on site. Area needs to be paves, section of road has been sawcut between road and sidewalk. Will need to monitor tracking, once paved should no longer be issue.
|
ESC19-00401
| General Inspection | 10/28/2019 | 10/28/2019 | 10/28/2019 11:44:15 AM | P | PASS |
|
|
Site is paved and has curb and sidewalk. Ditch on south side hasn't been tiled. A few piles of cut asphalt and concrete throughout site.
|
ESC19-00678
| General Inspection | 10/28/2019 | 10/28/2019 | 10/28/2019 11:09:44 AM | P | PASS |
|
|
Entire site slopes away from roads. Large pile of backfill on site. Future road bed graded and area staked, no workers on site.
|
ESC19-00744
| General Inspection | 10/28/2019 | 10/28/2019 | 10/28/2019 10:53:37 AM | P | FAIL |
|
|
Washout on site never cleaned, fee issue and sent to RP. Using this permit since main site permit has never been updated. Same person is now responsible for every lot.
|
ESC19-00181
| General Inspection | 10/28/2019 | 10/28/2019 | 10/28/2019 10:52:33 AM | P | PASS |
|
|
Did site walk with superintendant. Area is clean, framers clean up at end of day, no loose trash around site. Inlet protection in good shape on cloverdale, will clean the dirt from gutters. Working on new parking area that will force everyone over rumble strips.
|
ESC17-01470
| General Inspection | 10/28/2019 | 10/28/2019 | 10/28/2019 10:31:38 AM | P | FAIL |
|
|
Fee added to home on pineview in development. Permit must be updated by 10/30 or holds on all homes in neighborhood.
|
ESC18-01674
| General Inspection | 10/28/2019 | 10/28/2019 | 10/28/2019 10:08:44 AM | P | PASS |
|
|
All paved, only exposed area is on west near fivemile where thewy have started on gas station building. Foundation poured, no perimeter control, water should flow into site but will monitor. Dumpster and metal bin on site, no issues.
|
ESC19-01353
| Site Final | 10/23/2019 | 10/28/2019 | 10/28/2019 9:05:14 AM | A | PASS |
|
|
|