ESC16-01586
| Site Final | 10/29/2018 | 10/29/2018 | 10/31/2018 11:45:04 AM | P | PASS |
|
|
No activity on building permit since 3/24/17
|
ESC18-01222
| General Inspection | 10/29/2018 | 10/29/2018 | 10/31/2018 11:30:31 AM | P | CANC |
|
|
|
ESC18-00430
| General Inspection | 10/26/2018 | 10/29/2018 | 10/31/2018 10:50:02 AM | P | FAIL |
|
|
Lots of styrofoam and plastic laying around site. Mortar mixer has no secondary containment, mortar all over the ground. Washout has no liner, just a pit. No one in job trailer.
|
ESC16-01096
| Site Final | 10/29/2018 | 10/29/2018 | 10/31/2018 10:27:38 AM | P | PASS |
|
|
Waiting for building permit final, will close when completed.
|
ESC17-00535
| General Inspection | 10/29/2018 | 10/29/2018 | 10/29/2018 2:18:09 PM | | CANC |
|
|
|
ESC17-00535
| DOC - Permit Finaled | 10/29/2018 | 10/29/2018 | 10/29/2018 2:17:59 PM | P | PASS |
|
|
Temp Occupancy issued.
|
ESC17-01126
| General Inspection | 10/29/2018 | 10/29/2018 | 10/29/2018 2:17:00 PM | | PASS |
|
|
No workers on site, area fenced off with locked gate. No ESC issues observed, wattle around perimeter, ends overlap and are ziptied. Gravel bags in gutter. No trash or dirt leaving site.
|
ESC17-00640
| General Inspection | 10/29/2018 | 10/29/2018 | 10/29/2018 2:04:35 PM | | PASS |
|
|
No ESC issues. Still needs landscaping. GC keeping everything clean.
|
ESC17-01113
| General Inspection | 10/29/2018 | 10/29/2018 | 10/29/2018 12:56:23 PM | | PASS |
|
|
Site contained, no ESC issues.
|
ESC18-00844
| General Inspection | 10/29/2018 | 10/29/2018 | 10/29/2018 12:56:01 PM | P | FAIL |
|
|
3 washouts that have failed and leaked plus more washout just dumped on ground.
|
ESC16-01582
| Aging Inspection | 10/29/2018 | 10/29/2018 | 10/29/2018 12:21:34 PM | | PART |
|
|
Still some homes being built. Some dirt on sidewalks and trash from building waste. No major ESC issues.
|
ESC17-01688
| General Inspection | 10/29/2018 | 10/29/2018 | 10/29/2018 11:41:16 AM | | PASS |
|
|
Inspected 10/26. Site is clean, Ash st has been patched. Road work on river street. New lined washout built, foreman will make sure everyone used it.
|
ESC17-01538
| General Inspection | 10/29/2018 | 10/29/2018 | 10/29/2018 11:38:54 AM | | PASS |
|
|
Greenbelt relocation complete. Old BMPs still stored behind fenced off area. Stockpiles are below surrounding grade and not leaving site.
|
ESC17-00013
| General Inspection | 10/29/2018 | 10/29/2018 | 10/29/2018 11:06:34 AM | | PASS |
|
|
Track steer on site, looks like work on retaining area. Some topsoil stored in parking spot. Two lined concrete washouts on site. No home construction has begun.
|
ESC16-01560
| General Inspection | 10/29/2018 | 10/29/2018 | 10/29/2018 10:34:37 AM | | PASS |
|
|
Section of parcel roped off and being used for parking, no trackout from workers. Roll pan washout on site. Lots of stock piles on site.
|
ESC14-00788
| Aging Inspection | 10/29/2018 | 10/29/2018 | 10/29/2018 10:02:37 AM | | PART |
|
|
Wattle places on vacant lots to cotrol flow. Inlet protection in drains. 2 homes under construction, no new activity has begun. Some gaps in wattle on south west perimeter.
|