Inspections for the day of: Monday, October 29, 2018.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-01586 Site Final10/29/201810/29/201810/31/2018 11:45:04 AMPPASS
No activity on building permit since 3/24/17
ESC18-01222 General Inspection10/29/201810/29/201810/31/2018 11:30:31 AMPCANC
ESC18-00430 General Inspection10/26/201810/29/201810/31/2018 10:50:02 AMPFAIL
Lots of styrofoam and plastic laying around site. Mortar mixer has no secondary containment, mortar all over the ground. Washout has no liner, just a pit.
No one in job trailer.
ESC16-01096 Site Final10/29/201810/29/201810/31/2018 10:27:38 AMPPASS
Waiting for building permit final, will close when completed.
ESC17-00535 General Inspection10/29/201810/29/201810/29/2018 2:18:09 PM CANC
ESC17-00535 DOC - Permit Finaled10/29/201810/29/201810/29/2018 2:17:59 PMPPASS
Temp Occupancy issued.
ESC17-01126 General Inspection10/29/201810/29/201810/29/2018 2:17:00 PM PASS
No workers on site, area fenced off with locked gate. No ESC issues observed, wattle around perimeter, ends overlap and are ziptied. Gravel bags in gutter. No trash or dirt leaving site.
ESC17-00640 General Inspection10/29/201810/29/201810/29/2018 2:04:35 PM PASS
No ESC issues. Still needs landscaping. GC keeping everything clean.
ESC17-01113 General Inspection10/29/201810/29/201810/29/2018 12:56:23 PM PASS
Site contained, no ESC issues.
ESC18-00844 General Inspection10/29/201810/29/201810/29/2018 12:56:01 PMPFAIL
3 washouts that have failed and leaked plus more washout just dumped on ground.
ESC16-01582 Aging Inspection10/29/201810/29/201810/29/2018 12:21:34 PM PART
Still some homes being built. Some dirt on sidewalks and trash from building waste. No major ESC issues.
ESC17-01688 General Inspection10/29/201810/29/201810/29/2018 11:41:16 AM PASS
Inspected 10/26. Site is clean, Ash st has been patched. Road work on river street. New lined washout built, foreman will make sure everyone used it.
ESC17-01538 General Inspection10/29/201810/29/201810/29/2018 11:38:54 AM PASS
Greenbelt relocation complete. Old BMPs still stored behind fenced off area. Stockpiles are below surrounding grade and not leaving site.
ESC17-00013 General Inspection10/29/201810/29/201810/29/2018 11:06:34 AM PASS
Track steer on site, looks like work on retaining area. Some topsoil stored in parking spot. Two lined concrete washouts on site. No home construction has begun.
ESC16-01560 General Inspection10/29/201810/29/201810/29/2018 10:34:37 AM PASS
Section of parcel roped off and being used for parking, no trackout from workers. Roll pan washout on site. Lots of stock piles on site.
ESC14-00788 Aging Inspection10/29/201810/29/201810/29/2018 10:02:37 AM PART
Wattle places on vacant lots to cotrol flow. Inlet protection in drains. 2 homes under construction, no new activity has begun. Some gaps in wattle on south west perimeter.