Inspections for the day of: Thursday, October 3, 2019.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-01518 Aging Inspection10/3/201910/3/201910/4/2019 12:04:20 PM PASS
WIP on framing. Yard is fenced and contained.
ESC18-00956 General Inspection10/3/201910/3/201910/4/2019 11:26:03 AM PASS
Exterior work completed, lot lanscaped.
ESC16-00879 General Inspection10/3/201910/3/201910/4/2019 10:33:01 AM PASS
All homes completed, some still need landscaping.
DI protection still installed.
ESC16-00935 General Inspection10/3/201910/3/201910/3/2019 2:58:01 PM PASS
Driveway has been repaired. No issues on site.
ESC18-00920 General Inspection10/3/201910/3/201910/3/2019 2:57:34 PM PASS
No new activity at site. Perimeter BMPs and stabalized entrance at site. Still has large pile of wood and concrete debris on site that needs to be removed.
ESC18-00818 General Inspection10/3/201910/3/201910/3/2019 2:17:52 PM PART
No new activity, waiting on resolution of BLD.
New road to backyard from Sherman, no stabalization at site.
ESC18-01525 Aging Inspection10/3/201910/3/201910/3/2019 2:08:01 PM PASS
All work contained to upper lot. Hillside is revegetating.
ESC18-00946 General Inspection10/3/201910/3/201910/3/2019 2:07:16 PM PASS
Inspected 10-2, no new activity.
ESC19-00542 General Inspection10/2/201910/3/201910/3/2019 1:18:05 PMAPASS
First tap is completed and hole being backfilled.
Seepage bed took all water without issue, water line left plenty of room for more flow. Frack take hasn't been used.
ESC19-01353 Site Preparation10/3/201910/3/201910/3/2019 12:53:46 PMPPASS
Canopy is demolished. Tanks wont be removed until Monday or Tuesday. PSI is going to pave lot after removal.