ESC18-01455
| General Inspection | 10/31/2019 | 10/31/2019 | 11/1/2019 10:30:58 AM | | PASS |
|
|
Site is contained, hillsides have vegetation. No trackout or rocks on road.
|
ESC19-00083
| General Inspection | 10/31/2019 | 10/31/2019 | 10/31/2019 2:10:20 PM | | PASS |
|
|
Lot graded and curbing done for parking lot. Two kiddie pools on site for washouts, no issues.
|
ESC18-01576
| General Inspection | 10/31/2019 | 10/31/2019 | 10/31/2019 11:31:33 AM | | PASS |
|
|
Site clean and contained, no esc issues.
|
ESC15-01210
| General Inspection | 10/31/2019 | 10/31/2019 | 10/31/2019 11:22:24 AM | | PASS |
|
|
No issues at site. Strrets and sidewalks clean. Individual building lots taking care of their own issues. Contacting parcel RPs whenever there is an issue.
|
ESC19-00085
| General Inspection | 10/31/2019 | 10/31/2019 | 10/31/2019 11:09:21 AM | | CANC |
|
|
|
ESC19-00085
| DOC - Permit Finaled | 10/31/2019 | 10/31/2019 | 10/31/2019 11:09:10 AM | P | PASS |
|
|
|
ESC18-01558
| General Inspection | 10/31/2019 | 10/31/2019 | 10/31/2019 11:06:37 AM | | PASS |
|
|
No concrets are excavated. work has begun, areas are excavated.
|
ESC18-01527
| General Inspection | 10/31/2019 | 10/31/2019 | 10/31/2019 10:26:07 AM | | PASS |
|
|
oME FRAMING OF GARAGE HAS BEEN DONE. sITE CLEAN , NO ISSUES, VERY MINIMAL WORK DONE ON HOME.
|
ESC18-01563
| Aging Inspection | 10/31/2019 | 10/31/2019 | 10/31/2019 9:59:14 AM | | CANC |
|
|
|
ESC18-01563
| DOC - Permit Finaled | 10/31/2019 | 10/31/2019 | 10/31/2019 9:58:49 AM | P | PASS |
|
|
|
ESC18-01562
| Aging Inspection | 10/31/2019 | 10/31/2019 | 10/31/2019 9:53:16 AM | | CANC |
|
|
|
ESC18-01562
| DOC - Permit Finaled | 10/31/2019 | 10/31/2019 | 10/31/2019 9:53:09 AM | P | PASS |
|
|
|
ESC18-01474
| Aging Inspection | 10/31/2019 | 10/31/2019 | 10/31/2019 8:44:05 AM | | CANC |
|
|
|
ESC18-01474
| DOC - Permit Finaled | 10/31/2019 | 10/31/2019 | 10/31/2019 8:44:01 AM | P | PASS |
|
|
|
ESC19-00371
| General Inspection | 10/23/2019 | 10/31/2019 | 10/30/2019 12:25:32 PM | P | PASS |
|
|
Did site walk through. Upper channel has been lined with boulders, finishing by putting some large rock checks in. Area on hill has been tracked, scheduled to be seeded end to end. Water bars of rock placed at 100' intervals on roads, steep road leading down also has dirt water bar between each rock, bringing spacing to 50'. Lots have been bermed to hold water. All slopes scheduled for hydroseeding, no exact date of completion, pallets of tackifier on site. Ponds have not bee approved by ACHD. Pitrun on roads still not approved by ACHD.
|