Inspections for the day of: Friday, October 4, 2019.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-01447 Conference10/4/201910/4/201910/4/2019 1:48:56 PMPPASS
Met with RP on site. Went over corrections and concerns.
Veasy scheduled to hydroseed, new entrance will be installed when backfill removed.
Gave ok to remove hold.
ESC19-01120 Site Preparation10/4/201910/4/201910/4/2019 1:06:32 PMAPASS
Met with Angel on site. Silt fence has been trenched in, road cleaned off. Rock brought in for entrance.
Truck for backfill removal just arrived, will make sure road is clean after loading.
Told Angel he should have RP if he is the one on site doing ESC.
ESC18-00264 General Inspection10/4/201910/4/201910/4/2019 12:58:23 PM CANC
ESC18-00264 DOC - Permit Finaled10/4/201910/4/201910/4/2019 12:58:15 PMPPASS
Owner is also building home above. Will continue to monitor and have repaired if needed. Site is stable.
ESC18-01102 General Inspection10/4/201910/4/201910/4/2019 12:57:24 PM PASS
Lot is contained but dirty. Lots of debris from stucco work.
ESC18-01124 General Inspection10/4/201910/4/201910/4/2019 12:23:10 PM PASS
Trash has been picked up, no issues at site.
ESC18-01484 Aging Inspection10/4/201910/4/201910/4/2019 12:10:09 PM CANC
ESC18-01484 DOC - Permit Finaled10/4/201910/4/201910/4/2019 12:10:01 PMPPASS
ESC19-00696 General Inspection10/4/201910/4/201910/4/2019 11:56:56 AMPFAIL
Washout dumped in front of garage pad. Message sent to RP and follow up scheduled.
ESC18-00844 General Inspection10/4/201910/4/201910/4/2019 11:53:21 AM PASS
Site is contained.
ESC19-01303 General Inspection10/4/201910/4/201910/4/2019 11:13:25 AMPPASS
Excavation along side of home, no dirt leaving site.
ESC17-01470 BMP Violation10/1/201910/4/201910/4/2019 10:08:03 AMAFAIL
Debris and washout not cleaned.
CBH needs to update permit, still has Knife River listed for zRP.
ESC19-00389 Site Preparation10/3/201910/4/201910/4/2019 9:53:53 AMAPASS
Parking lot has been removed and is below grade. New parking islands being installed, did not see a concrete washout or any washout dumped on site. Nothing leaving site at time of inspection. Some areas of lot have been sawcut and are still open to traffic.
ESC18-00427 Site Final9/20/201910/4/201910/4/2019 9:37:14 AMPPASS
ESC18-01288 Aging Inspection10/4/201910/4/201910/4/2019 9:01:05 AM CANC
ESC18-01288 DOC - Permit Finaled10/4/201910/4/201910/4/2019 9:01:01 AMPPASS