ESC17-01132
| General Inspection | 10/7/2019 | 10/7/2019 | 10/7/2019 2:11:12 PM | | PASS |
|
|
Site is stabalized, all exterior completed. OK to final permit when BLD closed.
|
ESC17-00985
| General Inspection | 10/7/2019 | 10/7/2019 | 10/7/2019 2:02:17 PM | | PASS |
|
|
|
ESC17-01227
| Aging Inspection | 10/7/2019 | 10/7/2019 | 10/7/2019 2:02:05 PM | | PASS |
|
|
Home construction has begun. Site is clean, perimeter fence will prevent blown trash from leaving site.
|
ESC19-01094
| General Inspection | 10/7/2019 | 10/7/2019 | 10/7/2019 2:01:42 PM | P | PASS |
|
|
Home construction has begun. Site is clean, perimeter fence will prevent blown trash from leaving site.
|
ESC18-01632
| General Inspection | 10/7/2019 | 10/7/2019 | 10/7/2019 12:36:51 PM | P | PASS |
|
|
WIP on framing. Backfill has been filled back in. Two row homes being built at same time. Trash box on site, some small trash and water bottles laying around site.
|
ESC18-00349
| General Inspection | 10/7/2019 | 10/7/2019 | 10/7/2019 12:28:19 PM | P | FAIL |
|
|
Washout has been dumped on vacant lots. All homes arte completed.
|
ESC18-01613
| General Inspection | 10/7/2019 | 10/7/2019 | 10/7/2019 12:23:25 PM | P | PASS |
|
|
Home completed, still needs to be landscsaped.
|
ESC18-01606
| Site Final | 10/7/2019 | 10/7/2019 | 10/7/2019 12:18:36 PM | P | NR |
|
|
Still needs landscaping.
|
ESC18-01655
| Site Final | 10/7/2019 | 10/7/2019 | 10/7/2019 12:17:16 PM | P | PASS |
|
|
|
ESC18-01592
| Site Final | 10/7/2019 | 10/7/2019 | 10/7/2019 12:17:01 PM | P | PASS |
|
|
|
ESC19-00672
| General Inspection | 10/7/2019 | 10/7/2019 | 10/7/2019 12:01:52 PM | P | PASS |
|
|
Pad has been poured, large washout on site. Entance leading to job trailer, parking along Eugene is bare dirt. Eugene has been recently swept. Wattles installed along State st and the western edge. No workers on site at time of inspection.
|
ESC18-01604
| Site Final | 10/7/2019 | 10/7/2019 | 10/7/2019 11:54:28 AM | P | PASS |
|
|
|
ESC18-01608
| General Inspection | 10/7/2019 | 10/7/2019 | 10/7/2019 11:48:33 AM | P | FAIL |
|
|
Washout dumped on ground. RP notified, reinspection scheduled. $55 reinspection fee on site.
|
ESC17-01710
| General Inspection | 10/7/2019 | 10/7/2019 | 10/7/2019 11:43:49 AM | | PASS |
|
|
Site is clean, all homes completed, landscapers finishing up last two homes. Dumped washout on one lot, 5991 lucky, seperate inspection for specific lot recorded.
|
ESC17-01484
| Aging Inspection | 10/7/2019 | 10/7/2019 | 10/7/2019 11:25:42 AM | | PASS |
|
|
No new activity, vacant homes still sitting on site.
|
ESC18-00031
| General Inspection | 10/7/2019 | 10/7/2019 | 10/7/2019 11:07:59 AM | | PASS |
|
|
All work completed. DI protection needs to be removed from Cory.
|
ESC18-00426
| General Inspection | 10/7/2019 | 10/7/2019 | 10/7/2019 10:51:52 AM | | PASS |
|
|
2 homes under construction on Woodcreek. One is currently being framed the other has foundation poured with no more work done. Streets and sidewalks are being swept, trash boxes in use. South end of site is vegetated and stable.
|
ESC19-00403
| DOC - Permit Finaled | 10/7/2019 | 10/7/2019 | 10/7/2019 10:45:09 AM | P | PASS |
|
|
|
ESC18-00755
| General Inspection | 10/7/2019 | 10/7/2019 | 10/7/2019 10:35:24 AM | | PART |
|
|
Pile of trash and super sacks on site, also some pallets. Looks like it is packaging from mulch for playground, also trash dumped on vacant lot next door. Lots of dirt on perimeter road leading to rear of business. Still not open and no one on site.
|
ESC17-01070
| Aging Inspection | 10/7/2019 | 10/7/2019 | 10/7/2019 10:15:45 AM | | PASS |
|
|
Exterior completed and lot landscaped.
|
ESC19-00480
| General Inspection | 10/7/2019 | 10/7/2019 | 10/7/2019 9:53:32 AM | P | PASS |
|
|
Pad is poured and framing for subfloor has begun. All of the footprint is currently covered with poly. ackfill has been replaced, common drive is clean.
|
ESC18-01170
| General Inspection | 10/7/2019 | 10/7/2019 | 10/7/2019 9:53:14 AM | P | PASS |
|
|
Pad is poured and framing for subfloor has begun. All of the footprint is currently covered with poly. ackfill has been replaced, common drive is clean.
|
ESC18-00894
| General Inspection | 10/7/2019 | 10/7/2019 | 10/7/2019 9:52:08 AM | P | CANC |
|
|
|
ESC18-00894
| DOC - Permit Finaled | 10/7/2019 | 10/7/2019 | 10/7/2019 9:52:01 AM | P | PASS |
|
|
|
ESC19-00201
| General Inspection | 10/7/2019 | 10/7/2019 | 10/7/2019 9:50:43 AM | P | PASS |
|
|
WIP on framing. Dumpster on site, did not see any dumped washout. No dust or trackout.
|
ESC18-01405
| Site Final | 10/4/2019 | 10/7/2019 | 10/7/2019 9:31:04 AM | P | PASS |
|
|
|
ESC19-00122
| General Inspection | 10/7/2019 | 10/7/2019 | 10/7/2019 9:25:27 AM | P | PASS |
|
|
Home is completed and landscaping installed. OK to close when BLD completed.
|
ESC19-00123
| General Inspection | 10/7/2019 | 10/7/2019 | 10/7/2019 9:25:11 AM | P | PASS |
|
|
Home is completed and landscaping installed. OK to close when BLD completed.
|
ESC19-00121
| General Inspection | 10/7/2019 | 10/7/2019 | 10/7/2019 9:24:52 AM | P | PASS |
|
|
Home is completed and landscaping installed. OK to close when BLD completed.
|