ESC17-00315
| General Inspection | 10/8/2019 | 10/8/2019 | 10/9/2019 12:05:12 PM | | PASS |
|
|
|
ESC18-01057
| Site Final | 10/3/2019 | 10/8/2019 | 10/9/2019 11:28:50 AM | P | PASS |
|
|
|
ESC17-01009
| General Inspection | 10/8/2019 | 10/8/2019 | 10/9/2019 11:20:31 AM | | PASS |
|
|
Site is fence and contained. All waste removed from lot up collister from home.
|
ESC19-00935
| General Inspection | 10/8/2019 | 10/8/2019 | 10/9/2019 9:28:43 AM | P | CANC |
|
|
|
ESC18-01162
| General Inspection | 10/8/2019 | 10/8/2019 | 10/8/2019 12:24:09 PM | | CANC |
|
|
|
ESC18-01162
| DOC - Permit Finaled | 10/8/2019 | 10/8/2019 | 10/8/2019 12:23:59 PM | P | PASS |
|
|
|
ESC18-01244
| General Inspection | 10/8/2019 | 10/8/2019 | 10/8/2019 12:16:33 PM | | PASS |
|
|
Still not landscaped.
|
ESC17-00842
| General Inspection | 10/8/2019 | 10/8/2019 | 10/8/2019 12:05:20 PM | | PART |
|
|
Silt fence at top and bottom of site can be removed, it is fallen and torn, not doing any good. Landscapers at Lasher site are getting topsoil on the road and will need to sweep when done. Slopes are vegetated.
|
ESC18-00658
| Aging Inspection | 10/8/2019 | 10/8/2019 | 10/8/2019 11:57:17 AM | | CANC |
|
|
|
ESC18-00658
| DOC - Permit Finaled | 10/8/2019 | 10/8/2019 | 10/8/2019 11:57:12 AM | P | PASS |
|
|
|
ESC18-01039
| Aging Inspection | 10/8/2019 | 10/8/2019 | 10/8/2019 11:39:07 AM | | PASS |
|
|
Exterior completed, no esc issues.
|
ESC17-01686
| General Inspection | 10/8/2019 | 10/8/2019 | 10/8/2019 11:04:29 AM | P | PASS |
|
|
Last open permit for gatewood duplexes. Inlet protection still installed at intersection with Hiawatha, landscape material on gatewood by common area at end of block.
|
ESC17-01690
| Aging Inspection | 10/8/2019 | 10/8/2019 | 10/8/2019 11:00:01 AM | | PASS |
|
|
|
ESC17-01690
| DOC - Permit Finaled | 10/8/2019 | 10/8/2019 | 10/8/2019 10:59:53 AM | P | PASS |
|
|
|
ESC19-01083
| General Inspection | 10/8/2019 | 10/8/2019 | 10/8/2019 10:50:50 AM | P | PASS |
|
|
Foundation poured and subfloor installed. Trusses and material stored on site, no workers on site.
|
ESC19-00131
| Site Final | 10/7/2019 | 10/8/2019 | 10/8/2019 10:43:14 AM | A | PASS |
|
|
This is for the transmission line along Cloverdale. Work at the substation is continuing under a different permit. Phone #: ###-#### Inspection requested via web by Eldon Oyadomari
|
ESC19-00534
| General Inspection | 10/8/2019 | 10/8/2019 | 10/8/2019 10:43:00 AM | P | PASS |
|
|
Home is being framed. Trash box on site, no messes.
|
ESC19-00011
| Site Final | 10/8/2019 | 10/8/2019 | 10/8/2019 10:32:54 AM | P | PASS |
|
|
|
ESC18-01770
| General Inspection | 10/8/2019 | 10/8/2019 | 10/8/2019 10:13:44 AM | P | PASS |
|
|
Met with WB foreman at site. Concrete slabs being put in, trucks using washout and also ordered washout low enough for pump trucks. Framing has begun on southernmost units. Seepage bed dug. Crew was on site cleaning trash. Plan to have area paved before winter.
|
ESC18-01771
| General Inspection | 10/8/2019 | 10/8/2019 | 10/8/2019 10:13:26 AM | P | PASS |
|
|
Met with WB foreman at site. Concrete slabs being put in, trucks using washout and also ordered washout low enough for pump trucks. Framing has begun on southernmost units. Seepage bed dug. Crew was on site cleaning trash. Plan to have area paved before winter.
|
ESC18-01769
| General Inspection | 10/8/2019 | 10/8/2019 | 10/8/2019 10:13:04 AM | P | PASS |
|
|
Met with WB foreman at site. Concrete slabs being put in, trucks using washout and also ordered washout low enough for pump trucks. Framing has begun on southernmost units. Seepage bed dug. Crew was on site cleaning trash. Plan to have area paved before winter.
|
ESC18-00301
| General Inspection | 10/8/2019 | 10/8/2019 | 10/8/2019 9:47:31 AM | | PASS |
|
|
No activity, site is weed stabalized.
|