Inspections for the day of: Monday, November 13, 2017.
Number of inspections: 20
Percentage of inspections complete: 90 %
Percentage of inspections not complete: 10 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-01446 General Inspection11/9/201711/9/2017 A 
ESC16-01354 General Inspection11/9/201711/9/2017 P 
ESC16-01464 Site Final11/9/201711/13/201711/17/2017 10:12:28 AMPPASS
ESC16-01513 Site Final11/13/201711/13/201711/16/2017 8:55:32 AMPCANC
ESC16-01053 General Inspection11/13/201711/13/201711/14/2017 2:39:57 PM PASS
Disturbance contained to site. Hoping to finish concrete work this week, depends on availability of material delivery. Area surrounding building is all paved.
ESC15-01184 General Inspection11/13/201711/13/201711/13/2017 3:31:21 PM PASS
First phase of condos complete. Second phase fenced off and being used as storage. No new work.
ESC15-00944 General Inspection11/13/201711/13/201711/13/2017 2:54:38 PM PASS
Rear sections demolished. Acting as storage yard for work on new art center in old church.
ESC16-01682 General Inspection11/13/201711/13/201711/13/2017 1:42:28 PM PASS
Neighborhood BMPs maintained. Yard still exposed, needs landscaping. One area where gator guard blew out but looks like it was repaired today, still some runoff on road.
ESC16-00497 Aging Inspection11/13/201711/13/201711/13/2017 1:29:12 PM CANC
ESC16-00497 DOC - Permit Finaled11/13/201711/13/201711/13/2017 1:29:03 PMPPASS
ESC16-01627 DOC - Permit Finaled11/13/201711/13/201711/13/2017 12:31:57 PMPPASS
ESC17-01491 General Inspection11/13/201711/13/201711/13/2017 12:18:03 PMAPASS
Dewatering in process. Coming out and pooling behind silt fence. Water is absorbing into ground into marsh. Didn't see any running surface water further down stream. Zane said they will sweep trackout up.
ESC16-01743 Random Inspection11/13/201711/13/201711/13/2017 11:14:43 AMPPEND
Talked to general contractor and said they will get it cleaned up. Concrete was washed out onto dirt, framers left waste laying around. Dumpster scheduled to be picked up Tuesday the 14th.
ESC16-01471 DOC - Permit Finaled11/13/201711/13/201711/13/2017 10:21:33 AMPPASS
ESC16-01650 General Inspection11/13/201711/13/201711/13/2017 10:01:02 AM PEND
WIP. Some foundations poured and grading done. Site has some loose trash and trackout onto road inside property. Concrete washout is full and spilling out onto dirt and road.
ESC16-01501 DOC - Permit Finaled11/13/201711/13/201711/13/2017 9:45:01 AMPPASS
ESC16-01500 DOC - Permit Finaled11/13/201711/13/201711/13/2017 9:44:43 AMPPASS
ESC17-00206 DOC - Permit Finaled11/13/201711/13/201711/13/2017 9:41:40 AMPPASS
ESC16-00329 General Inspection11/13/201711/13/201711/13/2017 9:23:50 AM PASS
WIP. Permit displayed on side of shed. Some bare area but no runoff.
ESC17-00793 Random Inspection11/13/201711/13/201711/13/2017 9:11:55 AMPFAIL
Dirt going over top of gator guard and onto street and sidewalk. Blocksom at bottom of hill needs to be replaced. Sediment has pooled and piled up at low point on bottom of hill.