Inspections for the day of: Thursday, November 14, 2019.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-01636 General Inspection11/14/201911/14/201911/19/2019 9:40:05 AMPPASS
Met with Rex at site.
Area is paved and has curbing and sidewalks, washout on site.
Original dewatering water oked to drain. Pond about half full from water from finishing connection, still waiting for test results.
Most contanimated dirt gone, area still need some cleanup.
Still no for sure timeline on ponds.
ESC18-01227 General Inspection11/14/201911/14/201911/18/2019 10:36:17 AM PASS
Multiple foundations poured and concrete crew working on forms for next foundations. Two washout pans on site, some spillage.
Multiple piles of backfill on site around foundations.
All m,aterials stored in parking lot. No blowing trash or tracking.
ESC16-00353 General Inspection11/14/201911/14/201911/15/2019 1:44:40 PM PASS
No new activity.
ESC18-01665 Aging Inspection11/14/201911/14/201911/14/2019 1:26:16 PM PASS
Exterior done on block, still needs landscaping. Units to the east also under construction on same block.
ESC18-01664 Aging Inspection11/14/201911/14/201911/14/2019 1:26:00 PM PASS
Exterior done on block, still needs landscaping. Units to the east also under construction on same block.
ESC18-01663 Aging Inspection11/14/201911/14/201911/14/2019 1:25:46 PM PASS
Exterior done on block, still needs landscaping. Units to the east also under construction on same block.
ESC18-01659 Aging Inspection11/14/201911/14/201911/14/2019 1:25:30 PM PASS
Exterior done on block, still needs landscaping. Units to the east also under construction on same block.
ESC18-01657 Aging Inspection11/14/201911/14/201911/14/2019 12:10:00 PM CANC
ESC18-01657 DOC - Permit Finaled11/14/201911/14/201911/14/2019 12:09:53 PMPPASS
ESC19-00542 General Inspection11/13/201911/14/201911/14/2019 11:57:18 AMAPASS
Talked to Jim Williams about contanimated areas. Area along Park Center came back positive for hydrocarbons, waiting on formal report and directions to proceed. Area is fenced of and contanimated soil is on reinforced poly.
Rear void came back clean for water, waiting for final soil results to excavated for foundation. G&S on site waiting for ok to go.
2 washouts on site, pouring footings in middle of area where everything is ok.
No additional ESC issues.
MIS19-00378 ESC-Conference11/14/201911/14/201911/14/2019 11:17:41 AMPPEND
Bunch of old stockpiles, trash, and a truck full of tires on lot. No construction or dirt disturbed.
Contacted Chip with code compliance to come take a look and see if a code enforcement issue.
MIS19-00378 ESC-Conference11/14/201911/14/201911/14/2019 10:53:24 AMPCANC
ESC19-00376 General Inspection11/13/201911/14/201911/14/2019 10:21:08 AMAPASS
Neighborhood site prep completed. Work has begun on homes. No issues.
Washout may need stabalized road, will monitor.
ESC19-01329 General Inspection11/13/201911/14/201911/14/2019 10:14:48 AMAPASS
Work has begun on foundation. All excavated material on site. Concrete washout used.
ESC19-00670 General Inspection11/14/201911/14/201911/14/2019 9:55:01 AMPPASS
WIP on framing, no issues with home.
ESC18-00426 General Inspection11/14/201911/14/201911/14/2019 9:54:30 AMPFAIL
Merssage sent to RP William.
Old washout dump has been exposed now that vegetation has died, also lots of wind blown trash.
Follow up scheduled.
ESC19-00452 Site Final11/14/201911/14/201911/14/2019 9:45:09 AMPPASS
ESC19-00008 Site Final11/14/201911/14/201911/14/2019 9:44:50 AMPPASS
ESC19-01053 General Inspection11/13/201911/14/201911/14/2019 9:33:43 AMAPART
No one on site, message sent to RP with corrections.
No crushed rock ever brought in for entrance, also should be widened at Cole.
Low washout for pumptrucks is full.