Inspections for the day of: Wednesday, November 15, 2017.
Number of inspections: 21
Percentage of inspections complete: 90 %
Percentage of inspections not complete: 10 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-01446 General Inspection11/9/201711/9/2017 A 
ESC16-01354 General Inspection11/9/201711/9/2017 P 
ESC17-00087 Site Final10/23/201711/15/201711/17/2017 2:18:38 PMAPASS
ESC17-00108 Tracking Control11/15/201711/15/201711/16/2017 2:27:48 PMPPASS
Landscapers running skid steer along road and sidewalk. They are planting trees. Talked to lead landscaper and he said they will get the are clean before they leave for the day.
ESC16-00849 Site Final11/9/201711/15/201711/16/2017 2:07:46 PMPPASS
check for landscaping, gutter clean up, and DI bag removal at end of street.
ESC17-01491 General Inspection11/15/201711/15/201711/15/2017 1:56:34 PMPPASS
Getting second pump set.
ESC13-01279 Tracking Control11/14/201711/15/201711/15/2017 1:35:03 PMAPEND
Walked through site with RP. Discussed issues and will check back to see if completed.
ESC17-00203 General Inspection11/15/201711/15/201711/15/2017 12:05:09 PMPPEND
Still doing dirt work. Electric contractor has cut a trench through the entrance. I asked foreman to repair exit when they are finished and to monitor trackout throughout the day.
ESC17-00895 General Inspection11/14/201711/15/201711/15/2017 11:40:36 AMAPASS
see if work has occurred; call JEC about project
Utilities complete. Road, curb & gutter, and sidewalk installed. No work on homesites has begun.
ESC03-01076 Site Final11/15/201711/15/201711/15/2017 11:11:48 AMPPASS
ESC16-01435 Aging Inspection11/15/201711/15/201711/15/2017 11:06:36 AM CANC
ESC16-01435 DOC - Permit Finaled11/15/201711/15/201711/15/2017 11:06:13 AMPPASS
ESC17-00018 General Inspection11/15/201711/15/201711/15/2017 10:50:55 AM PASS
Silt fence has been repaired.
Masons and landscapers are causing lots of tracking in the site. None is leaving currently.
ESC16-01628 Aging Inspection11/15/201711/15/201711/15/2017 10:48:02 AM CANC
ESC16-01628 DOC - Permit Finaled11/15/201711/15/201711/15/2017 10:47:52 AMPPASS
ESC17-00209 General Inspection11/15/201711/15/201711/15/2017 9:49:38 AM PASS
House complete. Yard still needs to be landscaped.
ESC16-00945 General Inspection11/15/201711/15/201711/15/2017 9:35:05 AM PASS
WIP. Asked to provide washout for when stucco begins. Site is contained and clean, some dirt on sidewalk I asked for them to clean.
ESC17-00215 General Inspection11/15/201711/15/201711/15/2017 9:34:49 AM PASS
WIP. Asked to provide washout for when stucco begins. Site is contained and clean, some dirt on sidewalk I asked for them to clean.
ESC16-01472 General Inspection11/15/201711/15/201711/15/2017 9:13:49 AM PEND
Workers installing forms for foundation. Site will need a washout. A construction entrance will need to be constructed, current drive is becoming wet and trackout likely.
ESC17-00780 Random Inspection11/15/201711/15/201711/15/2017 9:03:24 AMPPASS
WIP. No runoff or trackout. Gator guard protecting lower perimeter.
ESC16-01457 General Inspection11/15/201711/15/201711/15/2017 8:58:37 AM PASS
No new activity since last inspection