Inspections for the day of: Thursday, November 16, 2017.
Number of inspections: 20
Percentage of inspections complete: 90 %
Percentage of inspections not complete: 10 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-01446 General Inspection11/9/201711/9/2017 A 
ESC16-01354 General Inspection11/9/201711/9/2017 P 
ESC15-00541 General Inspection11/16/201711/16/201711/20/2017 12:28:32 PM PASS
Most lost are complete, still a few homesites available. Neighborhood BMPs still in place.
ESC13-01279 BMP Violation11/15/201711/16/201711/20/2017 11:20:15 AMPPASS
check for construction entrance and sweep up.
Entrance installed on both sides. Majority of trackout has been swept up. Some dirt running down gutters during rain event.
ESC17-00242 General Inspection11/16/201711/16/201711/17/2017 1:57:56 PM CANC
ESC16-00556 General Inspection11/16/201711/16/201711/17/2017 11:59:14 AM PASS
No new active construction. Roads and sidewalks are in, site lots all sitting vacant. DIs are clean. Perimeter controls will need to be replaced before any new building occurs.
ESC17-00954 Random Inspection11/16/201711/16/201711/16/2017 4:25:36 PMPPASS
Added berm and retention pond like discussed. Both are working.
ESC17-00842 General Inspection11/16/201711/16/201711/16/2017 4:24:59 PMACANC
ESC17-00431 Site Final11/16/201711/16/201711/16/2017 4:02:25 PMAPASS
ESC17-01376 Random Inspection11/16/201711/16/201711/16/2017 4:00:18 PMPPASS
Site contained. Foundation poured, in process of removing forms.
ESC17-00227 General Inspection11/16/201711/16/201711/16/2017 3:40:51 PM PASS
Rill forming on southern hill. Concrete contractor will build a berm above to try to prevent any more runoff. Will monitor.
ESC17-00693 Site Preparation11/15/201711/16/201711/16/2017 3:12:23 PMAPASS
John Phone #: ###-####
2 rows of wattle for perimeter protection. Excavation for foundation has already begun.
ESC16-01719 Site Final11/15/201711/16/201711/16/2017 3:04:53 PMPPASS
ESC17-00625 Random Inspection11/16/201711/16/201711/16/2017 12:59:38 PMPPASS
Site being prepped for paving, curb, gutter, and sidewalks.
ESC17-00111 Random Inspection11/16/201711/16/201711/16/2017 12:37:24 PMPFAIL
Small dewatering operation in progress. Tested 85.9 NTU below settling pond, 12.0 NTU above operation. Called SWPPP designer to see if they knew of dewatering. No dewatering plan on site.
ESC17-00086 Aging Inspection11/16/201711/16/201711/16/2017 11:59:45 AM PASS
Site not landscaped. No current activities.
ESC17-00240 General Inspection11/16/201711/16/201711/16/2017 9:12:20 AM CANC
ESC17-00240 DOC - Permit Finaled11/16/201711/16/201711/16/2017 9:12:04 AMPPASS
ESC17-00996 Random Inspection11/16/201711/16/201711/16/2017 9:02:06 AMPPASS
House demoed. No dirt leaving lot. No current activity.
ESC16-01513 DOC - Permit Finaled11/16/201711/16/201711/16/2017 8:55:22 AMPPASS