ESC17-00956
| Aging Inspection | 11/18/2019 | 11/18/2019 | 11/19/2019 3:11:13 PM | | PASS |
|
|
|
ESC18-00141
| General Inspection | 11/18/2019 | 11/18/2019 | 11/18/2019 2:08:36 PM | | PASS |
|
|
Exterior and landscaping completed. Trash box and pot o pottie still out front.
|
ESC17-00640
| General Inspection | 11/18/2019 | 11/18/2019 | 11/18/2019 2:07:51 PM | | DONE |
|
|
|
ESC18-00498
| General Inspection | 11/18/2019 | 11/18/2019 | 11/18/2019 12:40:05 PM | | PASS |
|
|
1 foundation on Chardie poured, using next door lot for staging. Phase is clean and has good growth and coverage. Landscaperd has done work at intersections. No issues at phase.
|
ESC18-00946
| General Inspection | 11/18/2019 | 11/18/2019 | 11/18/2019 12:24:44 PM | | PASS |
|
|
No activity. Silt fence is down, wattle and gator guard at bottom of drive.
|
ESC19-00998
| General Inspection | 11/18/2019 | 11/18/2019 | 11/18/2019 12:18:18 PM | P | PASS |
|
|
No activity.
|
ESC19-00696
| General Inspection | 11/18/2019 | 11/18/2019 | 11/18/2019 12:17:45 PM | P | PASS |
|
|
Home is framed and roofed. Site clean.
|
ESC18-00844
| General Inspection | 11/18/2019 | 11/18/2019 | 11/18/2019 12:16:42 PM | | PASS |
|
|
Home exterior completed. Finishing on driveway and brick pavers. Most backfill has been used, still a small pile on site.
|
ESC18-01558
| Site Final | 11/15/2019 | 11/18/2019 | 11/18/2019 11:59:23 AM | P | PASS |
|
|
|
ESC17-01287
| General Inspection | 11/18/2019 | 11/18/2019 | 11/18/2019 11:48:51 AM | | PASS |
|
|
Will watch for growth and final stabalization.
|
ESC19-00884
| Site Preparation | 11/18/2019 | 11/18/2019 | 11/18/2019 11:03:58 AM | P | PASS |
|
|
Work began without site prep inspection. Permit displayed on job trailer, trailer was locked, did not talk to foreman. Crew working on excavation for footings, water truck on site, guy spraying hose. No one parked in work area. Paving parking lots across street, not related to project but in very close proximity.
|
ESC17-01340
| Aging Inspection | 11/18/2019 | 11/18/2019 | 11/18/2019 9:44:30 AM | | PASS |
|
|
OK to final when BLD closed
|
ESC06-01306
| General Inspection | 11/18/2019 | 11/18/2019 | 11/18/2019 9:29:59 AM | | PASS |
|
|
Site is clean and contained. Kipling has been swept. Entrance of Kipling, washout right inside fence.
|