Inspections for the day of: Monday, November 19, 2018.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-01132 General Inspection11/19/201811/19/201811/20/2018 12:33:20 PM FAIL
One of the concrete trucks didn't use washout and dumped onto ground, still wet at time of inspection. Foreman is going to have excavator scrape and clean area.
Curbing still needed on right of way at Jefferson, they are waiting for ACHD approval. Most of disturbed area is below grade, wattles installed where it is even with road.
ESC16-00242 General Inspection11/19/201811/19/201811/20/2018 9:57:05 AM PASS
Did quick site survey. All areas clean, BMPs in place. No noted ESC issues. WIll schedule inspection for campus in spring.
ESC17-00155 Aging Inspection11/19/201811/19/201811/20/2018 8:44:38 AM CANC
ESC16-00741 General Inspection11/19/201811/19/201811/19/2018 3:00:56 PM PASS
New blocksom was installed at 5th & Main intersection. Witches hat installed at 6th & Idaho. Some sand is stored on 5th, looks like it is being brought into building site for compaction.
ESC18-01478 Site Final11/19/201811/19/201811/19/2018 2:29:17 PMPPASS
ESC18-01477 Site Final11/19/201811/19/201811/19/2018 2:29:04 PMPPASS
ESC18-00176 General Inspection11/19/201811/19/201811/19/2018 2:22:19 PMPPART
Silt fence on south west perimeter needs to be trenched. No inlet protection at Broadway intersection. Construction entrance is round river rock not crushed.
ESC18-01275 Site Final11/19/201811/19/201811/19/2018 2:13:18 PMPPASS
Future location of oil change shop.
ESC18-01274 Site Final11/19/201811/19/201811/19/2018 2:13:03 PMPPASS
Future location of oil change shop.
ESC18-01366 General Inspection11/19/201811/19/201811/19/2018 12:29:38 PMPPASS
WIP on multiple homes and grading. oundation poured, did not see washout on site, no sign of dumped washout. No dirt leaving site, trackout on road inside site.
ESC17-00895 General Inspection11/19/201811/19/201811/19/2018 12:29:22 PMPPASS
WIP on multiple homes and grading. oundation poured, did not see washout on site, no sign of dumped washout. No dirt leaving site, trackout on road inside site.
ESC18-00987 General Inspection11/19/201811/19/201811/19/2018 12:10:56 PMPPASS
Home complete and landscaped. Sprinkler causing some runoff of wood mulch.
ESC17-01118 Aging Inspection11/19/201811/19/201811/19/2018 11:50:36 AM PASS
Two row homes complete and landscaped. WIP on 3rd home.
ESC17-01389 General Inspection11/19/201811/19/201811/19/2018 11:25:33 AM PASS
Inlet protection installed in new parking lot inlets, parking lot paved. Washout in good shape. No trackout or dust, site clean of garbage.
ESC17-01362 General Inspection11/19/201811/19/201811/19/2018 10:24:54 AM PASS
Clean site. Worker power washing front of building, no dirt in area and water is clean. Rear along greenbelt being landscaped. Wattles have been removed along sections, looks like they are being replaced as work progresses. Washout pan on site.