Inspections for the day of: Wednesday, November 20, 2019.
Number of inspections: 22
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC19-00687 General Inspection11/20/201911/20/201911/22/2019 11:03:02 AMPPASS
WIP. Almost done, no issues.
ESC19-00680 Site Final11/20/201911/20/201911/22/2019 11:02:40 AMPPASS
ESC18-01453 Aging Inspection11/20/201911/20/201911/21/2019 1:57:33 PM PASS
Exterior completed, no esc issues.
ESC19-00324 General Inspection11/20/201911/20/201911/21/2019 10:05:58 AMPPASS
Curbing completed at site, did not see any dumped washout. Middle upper section is now surrounded by curbing. Grader on site spreading 3/4 on road bed, hopes to have all done today. Crew will also be on site saturday. Still hoping to pave this year, all is weather dependant.
BVackfill being used to berm lots and above hills. Lots of improvements but not yet completed. Crew on site excavating and repairing some pipes, not sewer. Street was swept, still a bit dirty.
ESC18-00598 Site Final11/18/201911/20/201911/20/2019 2:47:11 PMPNR
Inlet preotection still in Linder. I was unable to get grates to break free. Sent message to ACHD to see if they have crew and equipment that can get them out.
ESC18-01431 Aging Inspection11/20/201911/20/201911/20/2019 2:30:18 PM PASS
Home is framed and tyvek wrapped. Site is clean and contained.
ESC18-01102 General Inspection11/20/201911/20/201911/20/2019 2:13:24 PM PASS
Work has resumed, lot clean.
ESC19-00091 General Inspection11/20/201911/20/201911/20/2019 12:59:51 PM PASS
Roofers on site, no gutters installed.
Road is a mess, was trenched and hasn't been patched yet.
ESC18-01124 General Inspection11/20/201911/20/201911/20/2019 12:58:35 PM PASS
Exterior work about completed. Lot is pretty clean, most material in trash box, stucco is in a pile next to box.
ESC19-00401 General Inspection11/20/201911/20/201911/20/2019 12:33:37 PMPPASS
No new activity. Some people at veggie stand are parking in dirt and people cutting through area.
ESC19-00678 General Inspection11/20/201911/20/201911/20/2019 12:32:02 PMPFAIL
Trackout onto wildwood, message sent to RP.
ESC18-01043 Site Final11/20/201911/20/201911/20/2019 12:13:08 PMPPASS
I removed DI bag and left on grass at park.
ESC19-00548 Site Final11/20/201911/20/201911/20/2019 12:01:53 PMPPASS
ESC19-00658 General Inspection11/20/201911/20/201911/20/2019 12:01:18 PMPPASS
No new activity, prep and joint trench looks completed, some stockpiling of material in rear of site.
ESC19-00534 General Inspection11/20/201911/20/201911/20/2019 11:47:24 AMPPASS
Home about completed. Driveway still needs to be poured and lot landscaped.
ESC19-01083 General Inspection11/20/201911/20/201911/20/2019 11:46:45 AMPPASS
Home is framed. Trash box out front and used. Site is clean.
ESC17-00146 Site Final11/18/201911/20/201911/20/2019 11:28:27 AMPNR
Addition not completed, area stil;l bare.
ESC18-01077 Aging Inspection11/20/201911/20/201911/20/2019 11:26:43 AM CANC
ESC18-01077 DOC - Permit Finaled11/20/201911/20/201911/20/2019 11:26:35 AMPPASS
Expired.
No disturbance or permit activity for over 12 months.
ESC18-00900 Tracking Control11/20/201911/20/201911/20/2019 11:13:12 AMPFAIL
Lots of dirt along curbing and some light trackout.
Message sent to John Laude.
ESC19-00304 General Inspection11/20/201911/20/201911/20/2019 11:04:56 AMPPASS
South Side.
Only activity is Knife River maintenance truck on site.
ESC19-00303 General Inspection11/20/201911/20/201911/20/2019 11:04:18 AMPFAIL
North side.
IMC truck washing out onto ground, said thats were Knife River told them too. Talked with concrete contractor, had Knife River clean washout with front end loader and requested washout.
Washout was cleaned while I was at site.
Water truck spraying site. Entance needs some maintenance.