ESC17-01473
| General Inspection | 11/23/2018 | 11/26/2018 | 11/30/2018 3:02:32 PM | P | PASS |
|
|
Site is low spot and holding water, getting very muddy. Sand and fill is being brough to elevate road. Very light trackout, foreman said he would sweep it up.
|
ESC18-01527
| Site Preparation | 11/23/2018 | 11/26/2018 | 11/27/2018 3:08:36 PM | A | PASS |
|
|
Wattles have been installed around homesite and entrance. Workers are parking on vacant lot below. Rocks are being stockpiled on right side by entrance. A construction entrance will be needed for when trucks enter site.
|
ESC16-01027
| Aging Inspection | 11/26/2018 | 11/26/2018 | 11/27/2018 11:41:01 AM | | PASS |
|
|
Working on last duplex, all others are completed and landscaped. Area around where job trailer was will need to be cleaned and all trash removed.
|
ESC18-01286
| Site Preparation | 11/26/2018 | 11/26/2018 | 11/27/2018 10:23:52 AM | P | PASS |
|
|
Work hasn't begun. Parcel still being used as storage for aspen valley.
|
ESC17-00076
| Aging Inspection | 11/26/2018 | 11/26/2018 | 11/26/2018 1:26:46 PM | | PASS |
|
|
All work looks complete.
|
ESC16-00968
| Aging Inspection | 11/26/2018 | 11/26/2018 | 11/26/2018 1:18:13 PM | | PASS |
|
|
Exterior completed and landscaping done.
|
ESC17-00954
| General Inspection | 11/26/2018 | 11/26/2018 | 11/26/2018 12:12:53 PM | | PART |
|
|
Most gravel snake bags have been ran over and need to be replaced. One home has foundation work, outpak located across street. Fence company on site with skid steer boring out post holes.
|
ESC18-01359
| General Inspection | 11/23/2018 | 11/26/2018 | 11/26/2018 12:01:08 PM | P | PASS |
|
|
Met with builder on site. Foundation is excavated, waiting for concrete company to come and set forms. Will bring an outpak for washout. Permit on display. No dirt leaving site.
|
ESC18-01448
| Site Final | 11/23/2018 | 11/26/2018 | 11/26/2018 11:54:19 AM | P | PASS |
|
|
|
ESC17-01057
| General Inspection | 11/26/2018 | 11/26/2018 | 11/26/2018 11:20:42 AM | | PASS |
|
|
BMPs removed. Hillside has been hydroseeded, no growth yet.
|
ESC17-01287
| General Inspection | 11/26/2018 | 11/26/2018 | 11/26/2018 11:09:43 AM | | PART |
|
|
Wattle on hillside is starting to get material buildup that should be cleaned. Silt fence at bottom of hill needs repair.
|
ESC17-00638
| General Inspection | 11/26/2018 | 11/26/2018 | 11/26/2018 10:31:49 AM | | PASS |
|
|
Building is all framed and trades are inside. Front will need new sidewalk installed, setbacks on sides are small, ver little disturbed area. No ESC issues.
|
ESC18-00024
| Site Final | 11/23/2018 | 11/26/2018 | 11/26/2018 10:07:37 AM | P | PASS |
|
|
|
ESC17-01184
| Site Final | 11/23/2018 | 11/26/2018 | 11/26/2018 9:57:56 AM | P | PASS |
|
|
|
ESC17-01104
| General Inspection | 11/26/2018 | 11/26/2018 | 11/26/2018 8:30:02 AM | | CANC |
|
|
|