Inspections for the day of: Thursday, November 7, 2019.
Number of inspections: 30
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC19-01191 Site Preparation11/4/201911/7/201911/13/2019 11:27:46 AMPPASS
Met with PM/RP Brandon. Construction entrance leading to fenced off parking area, access road has been graveled all the way through. Delta Dental parking lot relocated, is 3/4 mix, will be responsibl;e for upkeep and trackout. Wattle has been placed around swales. Irragation ditch runs along perimeter, in plans to pipe it before irragation turned back on.
Existing paved parking lot will be on site through winter. No inlets at site or on Park Center.
ESC18-01199 Aging Inspection11/7/201911/7/201911/13/2019 9:29:01 AM PASS
Landscapers on site. Home is finished.
ESC18-01533 Aging Inspection11/7/201911/7/201911/13/2019 9:28:32 AM CANC
ESC17-01009 General Inspection11/7/201911/7/201911/8/2019 10:39:56 AM PASS
Lot contained, no esc issues.
ESC17-00842 General Inspection11/7/201911/7/201911/8/2019 10:28:00 AM PART
L3 water truck parked on lower section. Talked to RP for home said someone was on site digging and doing drainage test. They had some tracking they haven't cleaned. I let hillside engineering know they were up here testing.
ESC19-00116 General Inspection11/7/201911/7/201911/7/2019 2:49:37 PM PASS
Access from Kingston, no trackout, entrance built. Material being stored in old parking lot at entrance. Large washout on sites. Entire area surronded by pit run. Walls and roof on, lots of interior work. Workers installing seepage bed behind school.
ESC18-01722 Aging Inspection11/7/201911/7/201911/7/2019 1:22:32 PM PASS
Lot needs to be landcaped, all work on interior.
ESC18-01594 Aging Inspection11/7/201911/7/201911/7/2019 1:10:43 PM CANC
ESC18-01594 DOC - Permit Finaled11/7/201911/7/201911/7/2019 1:10:37 PMPPASS
ESC18-01609 General Inspection11/7/201911/7/201911/7/2019 1:10:18 PMPCANC
ESC18-01609 DOC - Permit Finaled11/7/201911/7/201911/7/2019 1:10:11 PMPPASS
ESC18-01610 Site Final11/7/201911/7/201911/7/2019 1:09:50 PMPPASS
ESC18-01582 Site Final11/7/201911/7/201911/7/2019 1:09:39 PMPPASS
ESC18-01581 Site Final11/7/201911/7/201911/7/2019 1:09:27 PMPPASS
ESC18-01608 General Inspection11/7/201911/7/201911/7/2019 1:09:14 PMPPASS
OK to final when fine paid.
ESC17-00315 General Inspection11/7/201911/7/201911/7/2019 12:42:06 PM DONE
ESC19-00115 General Inspection11/7/201911/7/201911/7/2019 12:08:17 PM CANC
ESC19-00115 DOC - Permit Finaled11/7/201911/7/201911/7/2019 12:08:09 PMPPASS
ESC17-01360 General Inspection11/7/201911/7/201911/7/2019 11:43:37 AM PASS
All exterior work on phase completed. DI protections still installed.
WIll final permit when RP has inlet protection removed, makes sure all trash cleaned, and does perimeter check outside area for wind blown trash.
ESC18-01202 Site Final11/7/201911/7/201911/7/2019 11:41:57 AMPPASS
ESC17-00519 General Inspection11/7/201911/7/201911/7/2019 11:38:22 AMPPASS
Homes in multiple phases of construction. Orange fence installed on rod iron fence acting as trash catch. Inlets all have protection. Large lined washout on site and in use. Some dirt tracked on roads and sidewalks.
ESC19-00575 General Inspection11/7/201911/7/201911/7/2019 11:35:59 AMPPASS
Home completed, backyard still needs to be landscaped.
ESC19-00627 General Inspection11/7/201911/7/201911/7/2019 11:35:18 AMPPASS
Foundation poured, lumber on site, no work on framing.
ESC18-01071 General Inspection11/7/201911/7/201911/7/2019 11:26:43 AMPPASS
No workers on site.
Talked with neighbor while on site, were working on retention pond yestrerday on south east end.
Roads, sidewalks, storm drains, and fences installed.
ESC19-00698 General Inspection11/7/201911/7/201911/7/2019 10:52:35 AMPPASS
Curbing completed and parking lot paved, sidewalk still needs to be done. No landscaping on site. Washout on site and used. About half off building wrapped and heated for masonary and painting. No loose or blowing trash.
ESC19-00141 General Inspection11/7/201911/7/201911/7/2019 10:41:16 AMPPASS
no site prep requested....
No ne on site. Has crushed basalt entrance, 1 lined washout, and 3 outpaks. Concrete work has begun. No loose trash or trackout.
ESC18-01289 General Inspection11/7/201911/7/201911/7/2019 10:26:41 AMPPASS
Some of area paved and units sold. Entrance to Fed Way has been closed, concrete crew opened it.
Planning on getting rest of area paved on the 15th so they don't have mud issues. Concrete washout on sites, some small trash like drinks and labels around site.
ESC18-00164 General Inspection11/7/201911/7/201911/7/2019 9:33:56 AMPFAIL
Mountain of backfill has been idle for greater than two weeks with no temporary stabalization. No slope interupting BMPs on site. Only installed BMP is silt fence along lower perimeter.
No workers at site, sewer line material staged at site.
ESC19-00117 General Inspection11/7/201911/7/201911/7/2019 8:43:35 AM CANC
ESC19-00672 General Inspection10/28/201911/7/201911/6/2019 9:14:51 AMAPASS
Met with Mike the foreman at site. Will watch for mud when rain starts and clean streets as needed. I suggested a man walkway and boot brush to avoid boot track, workers parking on street throughout neighborhood.
Washout is full and need to be replaced.