ESC19-00016
| Aging Inspection | 12/12/2019 | 12/12/2019 | 12/13/2019 1:03:51 PM | | CANC |
|
|
|
ESC19-00263
| General Inspection | 12/12/2019 | 12/12/2019 | 12/13/2019 11:33:36 AM | | DEFR |
|
|
No visible work from front. Did not go through closed gate.
|
ESC17-01196
| General Inspection | 12/12/2019 | 12/12/2019 | 12/13/2019 11:30:57 AM | | CANC |
|
|
|
ESC19-00260
| General Inspection | 12/12/2019 | 12/12/2019 | 12/13/2019 9:38:09 AM | | PASS |
|
|
No workers on site. Footings for retaining wall poured, forms for wall in place, lined washout at site. Walls are up at home. Drainage in rear is protected, rock entrance on lot, no tracking.
|
ESC18-00946
| General Inspection | 12/12/2019 | 12/12/2019 | 12/12/2019 2:38:36 PM | P | PASS |
|
|
No blow outs.
|
ESC18-00498
| General Inspection | 12/12/2019 | 12/12/2019 | 12/12/2019 2:34:41 PM | P | PASS |
|
|
Phase is inb good shape. Issues with drainage on lower drive looks to be fixed. WIP on one lot.
|
ESC16-00406
| General Inspection | 12/12/2019 | 12/12/2019 | 12/12/2019 2:30:12 PM | P | PART |
|
|
Rilling from upper lots never fixed. No blowouts to golf course. No ESC issues from rains.
|
ESC19-01341
| General Inspection | 12/12/2019 | 12/12/2019 | 12/12/2019 2:21:49 PM | P | PASS |
|
|
Area excavated and footings have been started. No sign of any dumped washout. Area surrounding site is rock. Two very large backfill piles on site.
|
ESC19-00254
| General Inspection | 12/12/2019 | 12/12/2019 | 12/12/2019 1:59:27 PM | | PASS |
|
|
Lot is clean and contained. Workers are parked on street. Trash is in box. Large mound of backfill at site.
|
ESC19-01548
| General Inspection | 12/12/2019 | 12/12/2019 | 12/12/2019 12:32:27 PM | P | PASS |
|
|
Excavators haven't returned to site. Gator guard installed along perimeters with stockpiles. Road is clean. Washout has been delivered.
|
ESC19-01336
| General Inspection | 12/12/2019 | 12/12/2019 | 12/12/2019 12:21:22 PM | P | PART |
|
|
WIP on wall. No dumped washout, clean from trash. Some tracking onto Cartwright, no stabalized entrance.
|
ESC19-00589
| General Inspection | 12/12/2019 | 12/12/2019 | 12/12/2019 12:01:25 PM | P | PASS |
|
|
Driveway poured and home exterior completed. Hillside above Cartwright still not repaired or stabalized. ZNot landscaped along driveway.
|
ESC15-00853
| General Inspection | 12/12/2019 | 12/12/2019 | 12/12/2019 11:52:21 AM | | PART |
|
|
Lots of dirt on street within project, no tracking to Hill.
|
ESC18-00467
| General Inspection | 12/12/2019 | 12/12/2019 | 12/12/2019 11:38:22 AM | | CANC |
|
|
|
ESC19-00209
| Aging Inspection | 12/12/2019 | 12/12/2019 | 12/12/2019 11:38:10 AM | | CANC |
|
|
|
ESC19-00209
| DOC - Permit Finaled | 12/12/2019 | 12/12/2019 | 12/12/2019 11:38:03 AM | P | PASS |
|
|
|
ESC19-00499
| DOC - Permit Finaled | 12/12/2019 | 12/12/2019 | 12/12/2019 11:26:33 AM | P | PASS |
|
|
|
ESC18-01613
| Aging Inspection | 12/12/2019 | 12/12/2019 | 12/12/2019 11:15:34 AM | | CANC |
|
|
|
ESC18-01606
| Aging Inspection | 12/12/2019 | 12/12/2019 | 12/12/2019 11:15:24 AM | | CANC |
|
|
|
ESC18-01613
| DOC - Permit Finaled | 12/12/2019 | 12/12/2019 | 12/12/2019 11:15:16 AM | P | PASS |
|
|
|
ESC18-01606
| DOC - Permit Finaled | 12/12/2019 | 12/12/2019 | 12/12/2019 11:15:03 AM | P | PASS |
|
|
|
ESC19-00376
| Complaint Inspection | 12/10/2019 | 12/12/2019 | 12/12/2019 10:51:05 AM | A | PASS |
|
|
Site is clean. One foundation in place, one home being framed, one lot excavated. Next pour will need to provide washout. Excavator removced central washout, wasn't being used everytime and guys using it would drive through mud instaead of drive. Builders now responsible for their own washout.
|
ESC19-00181
| General Inspection | 12/12/2019 | 12/12/2019 | 12/12/2019 10:12:02 AM | P | FAIL |
|
|
Met with Travis from ESI. Currently parking area is all mud. They are hauling out fill left from trenching and bringing in new rock. ETA is next week for trtenching to be finished and to get site stabalized. Currently no trackout onto Cloverdale. They are scraping lot and grates on exit.
|
ESC18-01770
| Tracking Control | 12/4/2019 | 12/12/2019 | 12/12/2019 9:46:34 AM | P | FAIL |
|
|
Met with Kris at site. They are getting more rocks and will schedule a sweeper. Interested in trying wood chip for parking area. Will build a road in the site for access. Curently trailers in mud and genie lift tracking running from site to storage.
|
ESC18-01550
| General Inspection | 12/12/2019 | 12/12/2019 | 12/12/2019 8:34:04 AM | | PASS |
|
|
|