ESC18-00641
| General Inspection | 12/27/2018 | 12/27/2018 | 12/28/2018 9:26:53 AM | P | CANC |
|
|
entry error
|
ESC18-00171
| General Inspection | 12/24/2018 | 12/27/2018 | 12/27/2018 2:53:24 PM | A | PASS |
|
|
Silt fence still in place and working. Nothing leaving site.
|
ESC15-01210
| General Inspection | 12/27/2018 | 12/27/2018 | 12/27/2018 2:53:10 PM | | PART |
|
|
Site is clean except for 1702 Mockbee.,, see seperate inspection. Crew cleaning up sidewalks and street. Upper area is clean, streets and sidewalks free of dirt and trackout.
|
ESC18-00818
| General Inspection | 12/27/2018 | 12/27/2018 | 12/27/2018 2:33:58 PM | P | PEND |
|
|
Trackout leading down to Sherman. Everything above lot is clean. Needs to be cleaned after work.
|
ESC17-01009
| General Inspection | 12/27/2018 | 12/27/2018 | 12/27/2018 2:03:51 PM | | PASS |
|
|
Forms in place for foundation. No dirt leaving site.
|
ESC18-00129
| Aging Inspection | 12/27/2018 | 12/27/2018 | 12/27/2018 2:03:23 PM | | PEND |
|
|
Landscapers on site making mess, area needs to be cleaned at end of day.
|
ESC18-00165
| Aging Inspection | 12/27/2018 | 12/27/2018 | 12/27/2018 12:45:44 PM | | CANC |
|
|
|
ESC18-00165
| DOC - Permit Finaled | 12/27/2018 | 12/27/2018 | 12/27/2018 12:45:38 PM | P | PASS |
|
|
|
ESC17-01196
| General Inspection | 12/24/2018 | 12/27/2018 | 12/27/2018 12:26:04 PM | P | PASS |
|
|
House is warapped for stucco work. Old silt fence on bottom has been removed, needs to be disposed of.
|
ESC18-00363
| General Inspection | 12/27/2018 | 12/27/2018 | 12/27/2018 12:16:56 PM | | PASS |
|
|
Home framed and prepped for stucco. Driveway has been poured, lot not stabalized.
|
ESC18-00385
| General Inspection | 12/24/2018 | 12/27/2018 | 12/27/2018 12:11:02 PM | P | PASS |
|
|
Landscaping and sprinkler installation in progress before snow. No activity at time of inspection.
|
ESC17-01678
| Aging Inspection | 12/27/2018 | 12/27/2018 | 12/27/2018 11:34:04 AM | | CANC |
|
|
|
ESC17-01672
| Aging Inspection | 12/27/2018 | 12/27/2018 | 12/27/2018 11:33:51 AM | | CANC |
|
|
|
ESC17-01678
| DOC - Permit Finaled | 12/27/2018 | 12/27/2018 | 12/27/2018 11:33:43 AM | P | PASS |
|
|
|
ESC17-01672
| DOC - Permit Finaled | 12/27/2018 | 12/27/2018 | 12/27/2018 11:33:35 AM | P | PASS |
|
|
|
ESC17-00786
| Site Final | 12/24/2018 | 12/27/2018 | 12/27/2018 11:25:41 AM | A | PASS |
|
|
|
ESC17-01051
| Site Final | 12/24/2018 | 12/27/2018 | 12/27/2018 11:14:45 AM | P | PASS |
|
|
|
ESC18-00498
| General Inspection | 12/27/2018 | 12/27/2018 | 12/27/2018 11:14:18 AM | | PASS |
|
|
Inspected 12/26. Hillside is covered with ECB and wattles. No issues with slope failure. RP on site daily.
|
ESC18-00503
| General Inspection | 12/27/2018 | 12/27/2018 | 12/27/2018 11:13:12 AM | | PASS |
|
|
Need to monitor until landscaping is complete. Risk of erosion into neighbors yard .
|
ESC18-00028
| Aging Inspection | 12/27/2018 | 12/27/2018 | 12/27/2018 11:11:11 AM | | PASS |
|
|
Inspected 12/26. WIP. All workers parking on roads, lots have their own trash containers. No major ESC issues at location.
|
ESC18-00027
| General Inspection | 12/27/2018 | 12/27/2018 | 12/27/2018 11:09:22 AM | | PASS |
|
|
Inspected 12/26. Work completed and being stabalized.
|
ESC18-00497
| General Inspection | 12/27/2018 | 12/27/2018 | 12/27/2018 11:04:32 AM | | CANC |
|
|
|
ESC17-01157
| General Inspection | 12/27/2018 | 12/27/2018 | 12/27/2018 11:04:21 AM | | CANC |
|
|
|
ESC18-00072
| General Inspection | 12/27/2018 | 12/27/2018 | 12/27/2018 11:03:59 AM | | PASS |
|
|
Inspected 12/26. All current work is interiors. Site prep has begun for next units, on hold currently.
|
ESC18-00430
| Conference | 12/21/2018 | 12/27/2018 | 12/27/2018 9:31:13 AM | A | DONE |
|
|
Met with foreman and project manager. Will rebuild front entrance when contractor on site is finished running water line for hydrants. Has crane coming in to install rooftop units, needs to enter through field, will install fence and clean and repair entrance after that is done, will force everyone to come in front entrance. Trash was cleaned up, will keep on crews to clean their messes. New washout will be used when time to pour sidewalks. Office is going to reestablish NOI coverage, need to keep narrative on site, only maps available.
|