Inspections for the day of: Friday, December 28, 2018.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-00640 General Inspection12/28/201812/28/201812/28/2018 12:35:28 PM PASS
Yard bare and prepped for landscape. Coconut ECB on hillside, wattles installed below.
ESC17-01113 General Inspection12/28/201812/28/201812/28/2018 11:38:58 AM PASS
All disturbances in back. No workers on site.
ESC17-00190 General Inspection12/28/201812/28/201812/28/2018 11:33:32 AM PART
Some tracking on road in site, nothing going to Bogus Basin Rd. Most hillsides still have snow and are frozen.
ESC18-00130 Aging Inspection12/28/201812/28/201812/28/2018 11:11:26 AM CANC
ESC18-00130 DOC - Permit Finaled12/28/201812/28/201812/28/2018 11:11:20 AMPPASS
ESC18-00131 Aging Inspection12/28/201812/28/201812/28/2018 11:09:48 AM CANC
ESC18-00131 DOC - Permit Finaled12/28/201812/28/201812/28/2018 11:09:43 AMPPASS
ESC17-01687 General Inspection12/28/201812/28/201812/28/2018 10:51:56 AM PART
All terrain lift running around site, some trackout onto Ash. RP knows to clean up.
ESC17-01346 General Inspection12/28/201812/28/201812/28/2018 10:43:30 AM PASS
WIP on vertical. Site is contained, no ESC issues.
ESC17-01491 General Inspection12/28/201812/28/201812/28/2018 10:22:42 AM PASS
Site frozen and stable.
ESC18-00149 Aging Inspection12/28/201812/28/201812/28/2018 10:17:04 AM CANC
ESC18-00149 DOC - Permit Finaled12/28/201812/28/201812/28/2018 10:16:58 AMPPASS
ESC17-00013 General Inspection12/28/201812/28/201812/28/2018 10:08:43 AM PASS
WIP on multiple foundations, two lined washouts on site. All backfill contained on site.
ESC18-01121 General Inspection12/28/201812/28/201812/28/2018 9:27:57 AMPPASS
Working on river channel features. Workers parking in lot of Simplot Park. RPC doing features in channel, have rocks staged in western storage area. New well points installed in channel, no turbid discharge. Concrete and pump trucks on site, washout located on west end of project. No trackout from site. Excavator placing fill in pond for new path, turbidity curtain still working.