ESC18-00558
| General Inspection | 2/1/2019 | 2/1/2019 | 2/6/2019 9:23:28 AM | | PASS |
|
|
Home completed, backyard still needs to be landscaped.
|
ESC18-00581
| General Inspection | 2/1/2019 | 2/1/2019 | 2/1/2019 2:05:25 PM | | PART |
|
|
Homeowner said they are working on backfill. Some light trackout.
|
ESC18-01022
| General Inspection | 2/1/2019 | 2/1/2019 | 2/1/2019 1:15:24 PM | P | PASS |
|
|
No major issues, nothing leaving site. Pile of old silt fence laying on sidewalk at bottom entrance.
|
ESC15-00857
| General Inspection | 2/1/2019 | 2/1/2019 | 2/1/2019 1:04:04 PM | | PART |
|
|
Every active lot contributing to mess. Trackout onto roads, dirty sidewalk, trash etc. No major violations.
|
ESC18-00737
| General Inspection | 2/1/2019 | 2/1/2019 | 2/1/2019 1:00:00 PM | P | PART |
|
|
Mostly contained, some trackout.
|
ESC18-00738
| General Inspection | 2/1/2019 | 2/1/2019 | 2/1/2019 12:59:04 PM | P | PART |
|
|
Workers on site. Plastic trash on sidewalk, some rocks and dirt on road and sidewalk. Needs to be cleaned before workers leave.
|
ESC17-01736
| Aging Inspection | 2/1/2019 | 2/1/2019 | 2/1/2019 12:56:58 PM | | CANC |
|
|
|
ESC19-00072
| General Inspection | 2/1/2019 | 2/1/2019 | 2/1/2019 12:56:47 PM | P | PASS |
|
|
No activity, permit displayed
|
ESC18-00928
| General Inspection | 2/1/2019 | 2/1/2019 | 2/1/2019 12:54:20 PM | P | PART |
|
|
Perimeter silt fence needs repair. Some track out.
|
ESC14-01063
| General Inspection | 2/1/2019 | 2/1/2019 | 2/1/2019 12:48:49 PM | | CANC |
|
|
|
ESC14-01063
| DOC - Permit Finaled | 2/1/2019 | 2/1/2019 | 2/1/2019 12:48:39 PM | P | PASS |
|
|
Will monitor storm drains under permit esc15-00857
|
ESC17-01009
| General Inspection | 2/1/2019 | 2/1/2019 | 2/1/2019 11:47:08 AM | | PASS |
|
|
Foundation poured and site contained.
|
ESC18-01284
| General Inspection | 2/1/2019 | 2/1/2019 | 2/1/2019 11:40:48 AM | P | PART |
|
|
Most styrofoam cleaned, still one area where fence is under load. Fresh concrete pour, no dumped washout.
|
ESC18-01527
| General Inspection | 2/1/2019 | 2/1/2019 | 2/1/2019 11:33:50 AM | P | PART |
|
|
No new construction activity. Some dirt running down road shared with ranching access.
|
ESC18-00534
| Site Final | 2/1/2019 | 2/1/2019 | 2/1/2019 9:55:10 AM | P | NR |
|
|
Home is complete, lot not yet landscaped or stabalized.
|
ESC17-01479
| General Inspection | 2/1/2019 | 2/1/2019 | 2/1/2019 9:50:05 AM | P | PART |
|
|
Some dumped stucco needs to be cleaned. Tile guy has truck and trailer parked on frozen mud, asked him to move before thaw. Met with building foreman while on site, says hes been on the guys to keep it clean.
|
ESC17-01710
| General Inspection | 2/1/2019 | 2/1/2019 | 2/1/2019 9:36:41 AM | P | PASS |
|
|
Stabalized entrance installed. Work on two homes, both have permits on fence. No ESC issues.
|
ESC18-00385
| Site Final | 1/30/2019 | 2/1/2019 | 1/31/2019 12:32:26 PM | P | NR |
|
|
Front is torn up to install sprinklers, site not stable.
|