Inspections for the day of: Tuesday, February 11, 2020.
Number of inspections: 22
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC19-01500 General Inspection2/7/20202/11/20202/11/2020 2:29:39 PMPPASS
No earth disturbing activity. Pitrun, rock, and ecology blocks have been stockpiled. One track steer and tracked dumper on site. No workers.
ESC18-01244 General Inspection2/11/20202/11/20202/11/2020 2:05:30 PM PASS
Gatorguard correctly installed. Sidewalk clean.
ESC17-00954 General Inspection2/11/20202/11/20202/11/2020 2:05:03 PM PASS
All common area and lots stable. No esc issues. Builder taking reponsibility for their own lots.
ESC18-00946 General Inspection2/11/20202/11/20202/11/2020 2:00:58 PM DONE
ESC13-00806 General Inspection2/11/20202/11/20202/11/2020 1:36:50 PM PASS
ESC18-00752 General Inspection2/11/20202/11/20202/11/2020 12:08:36 PM PASS
Fenced and contained, still no activity.
ESC19-00178 Site Final2/10/20202/11/20202/11/2020 12:07:46 PMPDEFR
Project has revegetation bond, will continue to monitor.
ESC19-00584 General Inspection2/11/20202/11/20202/11/2020 11:34:02 AMPPASS
Stormwater pond being shaped and excavated from west to east. No pumping of ground water. Any water that falls in pond area is now contained. Some rock check dams in ditch leading to creek, no water flowing. Crossing of Warm Springs is bad, sweeper parked but not being used. SIte is on verge of thaw and will get very muddy.
ESC19-00855 Site Final2/11/20202/11/20202/11/2020 10:50:55 AMPPASS
ESC19-00818 Site Final2/11/20202/11/20202/11/2020 10:50:34 AMPPASS
ESC19-00817 Site Final2/11/20202/11/20202/11/2020 10:50:21 AMPPASS
ESC19-00820 Site Final2/11/20202/11/20202/11/2020 10:50:05 AMPPASS
ESC19-00816 Site Final2/11/20202/11/20202/11/2020 10:49:50 AMPPASS
ESC18-00488 General Inspection2/11/20202/11/20202/11/2020 10:49:21 AMPPASS
Met with gus on site. Will start more pad work in a few weeks. No major issues, some clusters of homes now finished.
ESC19-00856 Site Final2/11/20202/11/20202/11/2020 10:48:37 AMPPASS
ESC19-00790 General Inspection2/11/20202/11/20202/11/2020 10:31:32 AMPFAIL
Talked to RP and follow up scheduled.
Rilling coming down hill and into lot below. Windblown trash blowing down into drainage.
ESC19-00260 General Inspection2/7/20202/11/20202/11/2020 10:29:17 AMPFAIL
Message sent to RP and follow up scheduled. Silt fence needs repair and trash cleanup. Rilling coming onto site from lot above, talked to that RP. Needs to clean paint/drywall washout.
ESC17-00018 General Inspection2/11/20202/11/20202/11/2020 10:07:14 AM PASS
Phase on east is all completed, no more lots. One home has begun on west.
ESC19-01256 General Inspection2/11/20202/11/20202/11/2020 9:21:10 AMPPASS
Site frozen at time of inspection. Looks like high potential for mud and boot tracking.
ESC18-00435 Aging Inspection2/11/20202/11/20202/11/2020 9:12:54 AM PASS
Trash guy on site loading trailer and cleaning up. Backside by drive is pitrunned. Front along road has been straw covered. Area of excavation in front looks like it will be walkway. No issues at site.
ESC18-01050 Aging Inspection2/11/20202/11/20202/11/2020 8:41:19 AM CANC
ESC18-01050 DOC - Permit Finaled2/11/20202/11/20202/11/2020 8:41:16 AMPPASS