Inspections for the day of: Friday, February 16, 2018.
Number of inspections: 21
Percentage of inspections complete: 95 %
Percentage of inspections not complete: 5 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-00379 General Inspection2/12/20182/12/2018   
ESC15-00976 General Inspection2/16/20182/16/20182/20/2018 2:42:09 PM PASS
Phase 2 under construction. Washout on site, trash box provided. Site is clean and maintained. No dirt leaving site.
ESC17-00592 Aging Inspection2/16/20182/16/20182/20/2018 11:37:39 AM CANC
ESC17-00018 General Inspection2/16/20182/16/20182/20/2018 11:24:04 AM PART
Site is mostly clean. Some builders are doing a poor job on their sites. Some trackout from people cutting through lots.
ESC17-00502 General Inspection2/16/20182/16/20182/20/2018 10:54:03 AM PASS
Exterior work complete. Yard still needs landscaping and to be stabalized.
ESC18-00229 Site Preparation2/16/20182/16/20182/20/2018 8:15:46 AMPCANC
call Jill to let know what time will be Phone #: ###-####
ESC18-00229 Site Preparation2/16/20182/16/20182/16/2018 4:06:07 PMPPASS
Met with Jill on site. Material will be hauled away as excavated and clean fill brought in. No plans to stock pile on site.
ESC17-00602 DOC - Permit Finaled2/16/20182/16/20182/16/2018 2:39:23 PMPPASS
ESC17-00518 General Inspection2/16/20182/16/20182/16/2018 2:34:07 PM PASS
WIP. Permit on front window. No issues, work area is in a big grassy area.
ESC17-00609 Aging Inspection2/16/20182/16/20182/16/2018 2:22:14 PM PASS
Building permit still open.
ESC18-00027 Site Preparation2/16/20182/16/20182/16/2018 2:09:12 PMPPASS
Will continue to use old staging area and road closure for staging and storage. Will need to protect old Warm Springs Creek when working nearby, it still is primary waterway until they divert into new channel. Permit and SWPPP in box on west side.
ESC17-00157 General Inspection2/16/20182/16/20182/16/2018 12:17:17 PM CANC
ESC17-00157 DOC - Permit Finaled2/16/20182/16/20182/16/2018 12:17:06 PMPPASS
ESC17-00227 General Inspection2/9/20182/16/20182/16/2018 12:16:18 PMPPASS
WIP. Hill side BMPs in place. Water etention on site.
ESC17-00624 Aging Inspection2/16/20182/16/20182/16/2018 11:49:23 AM PASS
Building permit still open
ESC17-00102 General Inspection2/9/20182/16/20182/16/2018 10:58:57 AMAPEND
Spoke with owner on site. Curb should be going in within a few days. Site is cleaner than it has been. Workers all parked on Bird. Sweepers scheduled for end of day. Trash pickup also scheduled for today.
ESC17-00010 General Inspection2/16/20182/16/20182/16/2018 10:23:19 AM PASS
Building complete, no issues.
ESC17-00623 Aging Inspection2/16/20182/16/20182/16/2018 10:04:01 AM CANC
ESC17-01701 General Inspection2/7/20182/16/20182/16/2018 10:01:37 AMPPEND
Moving stockpile from Hilton to Peg for new road bed or parking area. Lots of trackout during work, Site perimeter has buffer.
ESC17-00612 Aging Inspection2/16/20182/16/20182/16/2018 9:46:48 AM PASS
Work complete, home for sale. Building permit still open.
ESC17-00249 General Inspection2/16/20182/16/20182/16/2018 8:07:21 AM PASS
Inspected 2-15