Inspections for the day of: Tuesday, February 18, 2020.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-01455 General Inspection2/18/20202/18/20202/19/2020 2:01:13 PM PART
Some trackout from driveway. RP is aware.
ESC19-00611 General Inspection2/14/20202/18/20202/19/2020 2:00:50 PMPPASS
Site is clean, no issues.
ESC18-01142 General Inspection2/18/20202/18/20202/19/2020 1:51:39 PM CANC
ESC18-00844 General Inspection2/18/20202/18/20202/19/2020 1:51:31 PM PASS
Work completed.
Still needs landscaping.
ESC18-01460 General Inspection2/18/20202/18/20202/19/2020 10:47:47 AM PASS
Building is completed, parking lot done.
Gate was locked.
ESC18-01576 General Inspection2/18/20202/18/20202/18/2020 1:57:18 PMPPASS
Work is interior, site still needs landscaping.
ESC18-01576 General Inspection2/18/20202/18/20202/18/2020 12:35:54 PM CANC
Entry error.
ESC19-00371 General Inspection2/18/20202/18/20202/18/2020 12:22:44 PMPPASS
post rainfall inspection
Turbidity monitor calibrated before inspection.
Vortex ponbd 50.7 NTU
Pool behind dam 72.9 NTU
Outlet below tree 70.5 NTU
Creek before leaving site 74.1 NTU.
Boise River at Barber Park is 1.85ntu.

No dewatering, no pump on site.
New check dams installed coming down road at 25' spacing. Bottom of hill is all gravel, road from vortex pond to dam has been lined in poly.
No backup on road, no left behind sediment. No new rilling or failures noticed.
ESC19-00584 General Inspection2/18/20202/18/20202/18/2020 12:20:22 PMPPASS
Met with Rex at site, plan is to begin well point tommorow.
East pond is down to starting grade. Plan is to bring it down another 15'. Well point is to be 18' below current grade. To begin east pond is split with earthen dam, will dewater into other side until depth reached and water is clear. Bypass pump is being hardlined in and will go through some chip for energy dissiapation and cleaning and then to ditch leading to wahling creek.
Current Boise River turbidity is at 1.85 NTU at launch steps at Barber Park upstream of site.
Follow up scheduled to see progress.
Currently doing some stripping on west pond to get it to starting grade. Plan is to dewater west pond into east pond once work begins on west pond and east pond is finished.
ESC19-00025 Aging Inspection2/18/20202/18/20202/18/2020 11:30:18 AM PASS
WIP on block. Using plywood when genie lift on grass. Site clean , no issues..
ESC18-01456 Aging Inspection2/18/20202/18/20202/18/2020 11:30:02 AM PASS
WIP on block. Using plywood when genie lift on grass. Site clean , no issues..
ESC18-01457 Aging Inspection2/18/20202/18/20202/18/2020 11:29:47 AM PASS
WIP on block. Using plywood when genie lift on grass. Site clean , no issues..
ESC18-01458 Aging Inspection2/18/20202/18/20202/18/2020 11:29:32 AM PASS
WIP on block. Using plywood when genie lift on grass. Site clean , no issues..
ESC19-00324 General Inspection2/18/20202/18/20202/18/2020 11:13:37 AMPPART
Some rilling coming from hillside towards warm springs. All dirt is being contained on site, new berms installed.
New gravel checks along road. New berms installed along road up hill in site, still a long open stretch at corner.
Utility crew not finished. Sidewalk crew on site doing prep work. Ecopan on site at end of dirt spur with no rock or type of stabalization.
Entrance at Teresa not completed.
Lots of dirt on road throughout site.
ESC19-01492 BMP Violation2/18/20202/18/20202/18/2020 10:51:57 AMPFAIL
Dirt all over street and sidewalk. Worker started to clean.
ESC18-00020 General Inspection2/18/20202/18/20202/18/2020 10:47:00 AMPFAIL
Mud on streets and sidewalk. RP notified, follow up scheduled.
ESC19-01591 BMP Violation2/18/20202/18/20202/18/2020 10:45:57 AMPFAIL
Backfill on sidewalk and trackout all over road. Notified RP.
Follow up scheduled.
ESC19-00260 BMP Violation2/11/20202/18/20202/18/2020 10:33:36 AMAPASS
On site cleaning up drywall. Has excavator scheduled this week for retaining wall and lot prep for landscaping.
ESC19-00790 BMP Violation2/11/20202/18/20202/18/2020 10:32:44 AMAFAIL
Trash has been cleaned from lot.
Rilling on hillside into lot below.
Some rilling above conveyance channel and sediment on sidewalk below.