ESC18-01455
| General Inspection | 2/18/2020 | 2/18/2020 | 2/19/2020 2:01:13 PM | | PART |
|
|
Some trackout from driveway. RP is aware.
|
ESC19-00611
| General Inspection | 2/14/2020 | 2/18/2020 | 2/19/2020 2:00:50 PM | P | PASS |
|
|
Site is clean, no issues.
|
ESC18-01142
| General Inspection | 2/18/2020 | 2/18/2020 | 2/19/2020 1:51:39 PM | | CANC |
|
|
|
ESC18-00844
| General Inspection | 2/18/2020 | 2/18/2020 | 2/19/2020 1:51:31 PM | | PASS |
|
|
Work completed. Still needs landscaping.
|
ESC18-01460
| General Inspection | 2/18/2020 | 2/18/2020 | 2/19/2020 10:47:47 AM | | PASS |
|
|
Building is completed, parking lot done. Gate was locked.
|
ESC18-01576
| General Inspection | 2/18/2020 | 2/18/2020 | 2/18/2020 1:57:18 PM | P | PASS |
|
|
Work is interior, site still needs landscaping.
|
ESC18-01576
| General Inspection | 2/18/2020 | 2/18/2020 | 2/18/2020 12:35:54 PM | | CANC |
|
|
Entry error.
|
ESC19-00371
| General Inspection | 2/18/2020 | 2/18/2020 | 2/18/2020 12:22:44 PM | P | PASS |
|
|
post rainfall inspection Turbidity monitor calibrated before inspection. Vortex ponbd 50.7 NTU Pool behind dam 72.9 NTU Outlet below tree 70.5 NTU Creek before leaving site 74.1 NTU. Boise River at Barber Park is 1.85ntu.
No dewatering, no pump on site. New check dams installed coming down road at 25' spacing. Bottom of hill is all gravel, road from vortex pond to dam has been lined in poly. No backup on road, no left behind sediment. No new rilling or failures noticed.
|
ESC19-00584
| General Inspection | 2/18/2020 | 2/18/2020 | 2/18/2020 12:20:22 PM | P | PASS |
|
|
Met with Rex at site, plan is to begin well point tommorow. East pond is down to starting grade. Plan is to bring it down another 15'. Well point is to be 18' below current grade. To begin east pond is split with earthen dam, will dewater into other side until depth reached and water is clear. Bypass pump is being hardlined in and will go through some chip for energy dissiapation and cleaning and then to ditch leading to wahling creek. Current Boise River turbidity is at 1.85 NTU at launch steps at Barber Park upstream of site. Follow up scheduled to see progress. Currently doing some stripping on west pond to get it to starting grade. Plan is to dewater west pond into east pond once work begins on west pond and east pond is finished.
|
ESC19-00025
| Aging Inspection | 2/18/2020 | 2/18/2020 | 2/18/2020 11:30:18 AM | | PASS |
|
|
WIP on block. Using plywood when genie lift on grass. Site clean , no issues..
|
ESC18-01456
| Aging Inspection | 2/18/2020 | 2/18/2020 | 2/18/2020 11:30:02 AM | | PASS |
|
|
WIP on block. Using plywood when genie lift on grass. Site clean , no issues..
|
ESC18-01457
| Aging Inspection | 2/18/2020 | 2/18/2020 | 2/18/2020 11:29:47 AM | | PASS |
|
|
WIP on block. Using plywood when genie lift on grass. Site clean , no issues..
|
ESC18-01458
| Aging Inspection | 2/18/2020 | 2/18/2020 | 2/18/2020 11:29:32 AM | | PASS |
|
|
WIP on block. Using plywood when genie lift on grass. Site clean , no issues..
|
ESC19-00324
| General Inspection | 2/18/2020 | 2/18/2020 | 2/18/2020 11:13:37 AM | P | PART |
|
|
Some rilling coming from hillside towards warm springs. All dirt is being contained on site, new berms installed. New gravel checks along road. New berms installed along road up hill in site, still a long open stretch at corner. Utility crew not finished. Sidewalk crew on site doing prep work. Ecopan on site at end of dirt spur with no rock or type of stabalization. Entrance at Teresa not completed. Lots of dirt on road throughout site.
|
ESC19-01492
| BMP Violation | 2/18/2020 | 2/18/2020 | 2/18/2020 10:51:57 AM | P | FAIL |
|
|
Dirt all over street and sidewalk. Worker started to clean.
|
ESC18-00020
| General Inspection | 2/18/2020 | 2/18/2020 | 2/18/2020 10:47:00 AM | P | FAIL |
|
|
Mud on streets and sidewalk. RP notified, follow up scheduled.
|
ESC19-01591
| BMP Violation | 2/18/2020 | 2/18/2020 | 2/18/2020 10:45:57 AM | P | FAIL |
|
|
Backfill on sidewalk and trackout all over road. Notified RP. Follow up scheduled.
|
ESC19-00260
| BMP Violation | 2/11/2020 | 2/18/2020 | 2/18/2020 10:33:36 AM | A | PASS |
|
|
On site cleaning up drywall. Has excavator scheduled this week for retaining wall and lot prep for landscaping.
|
ESC19-00790
| BMP Violation | 2/11/2020 | 2/18/2020 | 2/18/2020 10:32:44 AM | A | FAIL |
|
|
Trash has been cleaned from lot. Rilling on hillside into lot below. Some rilling above conveyance channel and sediment on sidewalk below.
|