Inspections for the day of: Thursday, February 20, 2020.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC19-00116 General Inspection2/11/20202/20/20202/20/2020 2:19:35 PMPPART
Track out down Kingston. Talked to superintendant. They close the gate at 3 and sweep everything back to site.
Lurre is hauling in fill. Most work is interior. School district wants to be moved in for when classes resume after spring break. Old school will be demoed when move over completed, Ideal is contractor.
ESC19-00083 General Inspection2/20/20202/20/20202/20/2020 1:37:20 PM PASS
Perimeter has gatorguard. Parking lot completed, still needs grass.
ESC17-00078 General Inspection2/20/20202/20/20202/20/2020 12:19:48 PM PART
A few track steers and mini excavators on site causing some tracking. Building lots are relatively clean, no blowing trash.
ESC19-00408 Aging Inspection2/20/20202/20/20202/20/2020 12:04:46 PM PASS
Exterior work looks completed, lot still needs landscaping.
ESC19-01191 General Inspection2/20/20202/20/20202/20/2020 11:51:07 AMPPASS
Perimeter irrigation ditch has been piped and buried.
Traffic control plan still in use, no tracking. Some fill is being hauled in. ater is staying on site, there is an existing seepage bed that will continue to be used.
No loose or blowing trash.
ESC19-01706 General Inspection2/20/20202/20/20202/20/2020 11:20:56 AMPPASS
Water line installation completed. Long row of stockpiles along western perimeter, seepage bed excavated at eastern rear of site. Site needs a new entrance before any more work begins. Site below grade, lots of bare ground.
ESC19-01462 General Inspection2/20/20202/20/20202/20/2020 11:08:36 AMPPASS
Home is framed. Workers on site doing interior. No loose trash or tracking.
ESC19-01539 General Inspection2/20/20202/20/20202/20/2020 11:07:50 AMPPART
Hauling in fill for foundation. Some tracking, talked to excavator, they will clean it when done.
ESC19-01108 General Inspection2/20/20202/20/20202/20/2020 11:07:09 AMPCANC
ESC19-01108 DOC - Permit Finaled2/20/20202/20/20202/20/2020 11:07:02 AMPPASS
ESC19-00554 Aging Inspection2/20/20202/20/20202/20/2020 10:38:40 AM CANC
ESC19-00554 DOC - Permit Finaled2/20/20202/20/20202/20/2020 10:38:34 AMPPASS
ESC19-00141 General Inspection2/20/20202/20/20202/20/2020 10:35:44 AMPPASS
Site is contained, trash hasn't blown into field.
ESC18-01289 General Inspection2/20/20202/20/20202/20/2020 10:27:55 AMPPASS
WIP on west side of project. Only entrance on Fed Way. No tras blown into fields, work area is all contained.
ESC18-00983 General Inspection2/20/20202/20/20202/20/2020 10:02:59 AM PASS
WIP on 2 foundations, no vertical construcrtion has begun. Crews hauling backfill from top, hear it is going to Harris Ranch.
Rilling on hillside looks like it has been repaired at top and fresh tackifier placed.
Site is frozen, no tracking at time of inspection.
ESC18-00164 General Inspection2/20/20202/20/20202/20/2020 9:46:31 AMPPASS
Utility work at site. Site is clean and dry, berm has bee repaired. No issues.
ESC06-01306 General Inspection2/20/20202/20/20202/20/2020 9:23:25 AM PASS
Exterior work nearly completed. Perimeter landscaping is finished. Site is clean.