PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Wednesday, February 27, 2019
.
Number of inspections:
25
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Michael Zawacki
Title
EROSION INSPECTOR
Phone #
208-473-8333
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC17-01791
General Inspection
2/27/2019
2/27/2019
3/1/2019 1:04:10 PM
PASS
Andersen Construction has staging on Main
ESC18-01675
BMP Violation
2/25/2019
2/27/2019
2/28/2019 9:55:13 AM
A
PASS
Gator guard has been installed along sidewalk, dirt ramps removed.
Genie lift on site, will need to watch out for trackout.
Some trusses stored on sidewalk.
ESC18-00195
Aging Inspection
2/27/2019
2/27/2019
2/28/2019 9:43:50 AM
PASS
No esc issues.
ESC17-00954
General Inspection
2/27/2019
2/27/2019
2/27/2019 12:52:51 PM
P
FAIL
Post rain inspection.
Discharge in gutters exceeds max range of 1000ntus on each side.
Improvements for retention have been made on upper lot.
ESC18-01244
General Inspection
2/27/2019
2/27/2019
2/27/2019 12:47:38 PM
P
PART
Gator guard worked during rain event. Sediment needs to be removed from behind. Access to lower lot has been blocked, needs garbage pickup.
ESC18-01433
General Inspection
2/27/2019
2/27/2019
2/27/2019 12:45:45 PM
P
PEND
Some failure and discharge during rain event.
Crew already on site making repairs and installing new BMPs when I arrived.
ESC18-00349
General Inspection
2/27/2019
2/27/2019
2/27/2019 11:19:23 AM
P
PASS
Streets and sidewalks show signs of being swept. Workers parked in road not mud. No tracking.
ESC17-01690
General Inspection
2/14/2019
2/27/2019
2/27/2019 10:28:26 AM
P
PASS
WIP on framing. No esc issues.
ESC17-01196
General Inspection
2/27/2019
2/27/2019
2/27/2019 9:40:49 AM
PART
Silt fence needs repair, site still frozen, no runoff. Rockwall is not allowing any dirt out.
ESC18-00027
General Inspection
2/27/2019
2/27/2019
2/27/2019 8:35:58 AM
PASS
Inspected 2-26. Work complete and area planted. Will need to watch for erosion along top and edge of culvert on south side.
ESC18-00232
Site Final
2/15/2019
2/27/2019
2/27/2019 8:19:04 AM
P
PASS
ESC18-00347
Aging Inspection
2/27/2019
2/27/2019
2/27/2019 8:18:24 AM
CANC
ESC18-00346
Aging Inspection
2/27/2019
2/27/2019
2/27/2019 8:18:17 AM
CANC
ESC18-00345
Aging Inspection
2/27/2019
2/27/2019
2/27/2019 8:18:10 AM
CANC
ESC18-00344
Aging Inspection
2/27/2019
2/27/2019
2/27/2019 8:18:01 AM
CANC
ESC18-00347
DOC - Permit Finaled
2/27/2019
2/27/2019
2/27/2019 8:17:54 AM
P
PASS
ESC18-00346
DOC - Permit Finaled
2/27/2019
2/27/2019
2/27/2019 8:17:48 AM
P
PASS
ESC18-00345
DOC - Permit Finaled
2/27/2019
2/27/2019
2/27/2019 8:17:43 AM
P
PASS
ESC18-00344
DOC - Permit Finaled
2/27/2019
2/27/2019
2/27/2019 8:17:37 AM
P
PASS
ESC18-00071
General Inspection
2/27/2019
2/27/2019
2/27/2019 8:16:48 AM
PASS
Inspected 2-25. No new phases have begun, no new disturbances.
ESC18-00072
General Inspection
2/27/2019
2/27/2019
2/27/2019 8:16:37 AM
PASS
Inspected 2-25. No new phases have begun, no new disturbances.
ESC18-00073
General Inspection
2/27/2019
2/27/2019
2/27/2019 8:16:26 AM
PART
Inspected 2-25. No new phases have begun, no new disturbances.
ESC17-01762
General Inspection
2/27/2019
2/27/2019
2/27/2019 8:15:52 AM
PASS
Inspected 2-26. Site was contained and free of trackout at time of inspection.
ESC17-01761
General Inspection
2/27/2019
2/27/2019
2/27/2019 8:15:39 AM
PASS
Inspected 2-26. Site was contained and free of trackout at time of inspection.
ESC17-01763
General Inspection
2/27/2019
2/27/2019
2/27/2019 8:15:25 AM
PASS
Inspected 2-26. Site was contained and free of trackout at time of inspection.