ESC18-01527
| General Inspection | 2/27/2020 | 2/27/2020 | 2/28/2020 11:50:50 AM | | PASS |
|
|
Still slowly framing, no issues.
|
ESC19-01440
| BMP Violation | 2/24/2020 | 2/27/2020 | 2/27/2020 2:36:09 PM | A | FAIL |
|
|
Check road and sidewalk for trackout.
|
ESC19-01651
| BMP Violation | 2/25/2020 | 2/27/2020 | 2/27/2020 2:32:02 PM | A | PASS |
|
|
Washout removed.
|
ESC19-00206
| General Inspection | 2/27/2020 | 2/27/2020 | 2/27/2020 1:37:41 PM | | CANC |
|
|
|
ESC19-00206
| DOC - Permit Finaled | 2/27/2020 | 2/27/2020 | 2/27/2020 1:37:34 PM | P | PASS |
|
|
|
ESC19-00558
| Aging Inspection | 2/27/2020 | 2/27/2020 | 2/27/2020 12:13:22 PM | | PASS |
|
|
Exterior looks completed. Driveway is rock to street. Still needs front yard landscaped. Rockwall barrier before street.
|
ESC18-01411
| General Inspection | 2/27/2020 | 2/27/2020 | 2/27/2020 11:58:45 AM | | PASS |
|
|
Site is clean and contained.
|
ESC19-00252
| General Inspection | 2/21/2020 | 2/27/2020 | 2/27/2020 11:38:05 AM | P | PASS |
|
|
Majority of work area is in fenced yard behing building. WIP on one parking lot in front. No issues at site.
|
ESC18-01128
| Tracking Control | 2/24/2020 | 2/27/2020 | 2/27/2020 11:22:04 AM | A | FAIL |
|
|
Still has trackout on south bound fry.
|
ESC19-00289
| BMP Violation | 2/24/2020 | 2/27/2020 | 2/27/2020 10:57:46 AM | A | PASS |
|
|
Washout cleaned, large washout on site. SOme dirt on roads from excavator crew on site at time of inspection. Lined washout should have some rock installed in front of it, small gap between washout and sidewalk.
|
ESC18-01227
| General Inspection | 2/27/2020 | 2/27/2020 | 2/27/2020 10:05:08 AM | | FAIL |
|
|
Message sent to Ed Kron, listed on job trailer. Site has a bunch of trash, needs a walk through and clean up. Reinspection scheduled.
|