Inspections for the day of: Monday, March 11, 2019.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC19-00086 General Inspection3/11/20193/11/20193/14/2019 10:35:12 AMPPART
Jute is not trenched at top, shingled properly.
ESC18-00641 General Inspection3/11/20193/11/20193/12/2019 2:52:45 PMPPASS
Bridges will be installed when gates for features completed and canal diversion shut off. Turbidity curtain still in pond, none of the concrete work has started.
ESC18-01121 General Inspection3/11/20193/11/20193/12/2019 2:51:14 PMPPASS
Diversion dam removed, river is back up in cfs. Features have been completed. Crew is in river installing gates, area is blocked and pumps keeping dry. Some concrete work still needed by gate for canal. RPC will be back to do steps around gates when ready.
Crew still working on new island area upstream of features. Both up and downstream are damed of and currently no flow in between. Crews are planting willows and working on stabalization. New path not started, covered under seperate permit.
ESC19-00148 General Inspection3/11/20193/11/20193/12/2019 2:30:24 PMPPASS
Work complete and stabalization in progress. People are using area to access river and walking on exposed soils.
ESC16-00938 General Inspection3/11/20193/11/20193/12/2019 10:25:49 AM PASS
BMPs in place, no runoff or rilling on hill.
ESC06-01306 General Inspection3/11/20193/11/20193/11/2019 3:03:05 PM PASS
Site is contained, gatorguard perimeter. No ESC issues.
ESC18-01167 General Inspection3/11/20193/11/20193/11/2019 2:54:32 PMPFAIL
Trtackout onto first and fort. Sweeper on site, entrance needs improvement.
ESC17-00416 General Inspection3/11/20193/11/20193/11/2019 2:12:31 PM PART
Needs landscaping.
ESC17-00956 Aging Inspection3/11/20193/11/20193/11/2019 12:44:26 PM PASS
Home is Tyvek wrapped, nothing leaving site.
ESC18-00540 General Inspection3/11/20193/11/20193/11/2019 12:31:55 PMPFAIL
Giant gully running down hill, silt fence has blown out and dirt on golf cart path.
Message sent to RP.
ESC17-00455 General Inspection3/11/20193/11/20193/11/2019 12:18:21 PM PASS
Gate locked, inspected from road belolw.
Silt fence installed, no dirt running down hill.
ESC16-01395 General Inspection3/11/20193/11/20193/11/2019 12:08:29 PM PASS
Front is landscaped. Access to rear and rear are both exposed, no activity and no dirt leaving site.
ESC18-00467 Site Final2/15/20193/11/20193/11/2019 11:54:58 AMPNR
Stockpile still ocated between the driveways.
ESC17-00146 Aging Inspection3/11/20193/11/20193/11/2019 10:15:10 AM PASS
WIP, home is framed. Yard has some backfill and is not stabaluized. No dirt leaving site.
ESC19-00131 Site Preparation3/8/20193/11/20193/11/2019 10:01:22 AMPPASS
Substation, all gravel and fenced. Permit posted. Left message with RP to watch for trackout and getting dirt into neighbors lot, use perimeter controls if needed, large buffer exist between substation fence and neighbors lot.
ESC16-01027 Aging Inspection3/11/20193/11/20193/11/2019 9:42:13 AM PART
Work complete. Lot that was being used for storage is not completely cleaned, some trash still on site.
ESC18-00469 Site Final3/8/20193/11/20193/11/2019 9:27:12 AMPPASS