Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-00617 General Inspection3/12/20183/12/20183/12/2018 2:24:54 PM PASS
No new work, Stockpiles on neighboring lots are being removed.
ESC17-00140 General Inspection3/12/20183/12/20183/12/2018 2:24:14 PM PASS
Owner on site cleaning up front yard. No dirt on street. Lot still needs landscaping.
ESC17-00190 General Inspection3/12/20183/12/20183/12/2018 2:07:23 PM PASS
Some grass starting to grow on hillsides. Lots are stable. Some sand is running off a few and into the road. Inlets at bottom of Corralero have no protection, looks like they flow into onsite storm water retention.
ESC16-00353 General Inspection3/12/20183/12/20183/12/2018 1:28:16 PM PART
Each lot has its own perimeter controls. Inlets on Pleasant Hill need to be cleaned. Lots of sand at the intersection of Nature View and Pleasant Hill
ESC16-00363 Aging Inspection3/12/20183/12/20183/12/2018 12:15:31 PM PASS
Pumps and canopy gone. Building still standing.
ESC17-00308 General Inspection3/12/20183/12/20183/12/2018 12:04:44 PM PASS
Work looks complete. Trench across parking lot hasn't been paved.
ESC16-01560 General Inspection3/12/20183/12/20183/12/2018 11:44:03 AM PASS
Walked perimeter of site. All work sites are contained and keeping their messes contained. No issue with trash or trackout from sites used for stock piles, staging, and storage. Didn't notice any wind blow trash in Wahling creek. Phase of new townhomes has added wattle along perimeter and cleaned up bike path.
ESC17-01491 Random Inspection3/12/20183/12/20183/12/2018 11:14:35 AMPPASS
WIP on bridge deck. Well point in place and pumping water from below excavated level, water is crystal clear and free from foam and odors. Diesel for generator has been placed in tote as a secondary containment. No issues with dirt leaving on Barber Valley or Warm Springs. Washout on north side of project, installed correctly and maintained.
ESC15-00556 General Inspection3/12/20183/12/20183/12/2018 10:38:23 AM PART
Majority of neighborhood is clean. Landscapers are on Hakkasans on rear of project. Load of landscapong rocks is on road, some trackout in area.
ESC17-00013 General Inspection3/12/20183/12/20183/12/2018 10:00:00 AM FAIL
Talked to Casey the RP. No work on site and has been under stable conditions for a while. Someone has built a poor washout and also washed out all over the ground. Lots of trackout from driving through mud and landscaping.
ESC16-00990 Site Final3/9/20183/12/20183/12/2018 9:32:44 AMAPASS
BLD permit for this project voided. Check for any erosion issues or unvegetated slopes.