Inspections for the day of: Tuesday, March 12, 2019.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-00498 General Inspection3/12/20193/12/20193/15/2019 11:34:16 AM PEND
Site walk through completed. Will write up report and share with RP and all builders. No major issues at site.
ESC17-00768 Aging Inspection3/12/20193/12/20193/14/2019 10:37:08 AM PART
Common drive is not finished, vehicles in mud. Owner of neighboring flag parcel is supposed to pave if they use it for lot access.
ESC17-01340 Aging Inspection3/12/20193/12/20193/13/2019 9:27:31 AM PASS
Work has started on second foundation. No dirt leaving site, no dumped washout.
ESC18-00503 General Inspection3/12/20193/12/20193/12/2019 3:37:03 PM PASS
Still needs landscaping and vegetation.
ESC13-00193 General Inspection3/12/20193/12/20193/12/2019 2:51:40 PM PASS
Sand dune only area remaining.
ESC17-00190 General Inspection3/12/20193/12/20193/12/2019 12:37:58 PM PART
Some wind blown trash needs to be picked up. Sidewalks need to be swept, some dirt on road near homes under construction.
ESC17-01661 Aging Inspection3/12/20193/12/20193/12/2019 12:25:18 PM PASS
Site contained, no ESC issues.
ESC18-01754 Site Preparation3/12/20193/12/20193/12/2019 12:18:53 PMPPART
Work started without site prep. SWPPP on site, DIs have protection. No dirt leaving site.
ESC17-01473 General Inspection3/12/20193/12/20193/12/2019 12:06:03 PM PASS
All worksites contained. No dirt leaving site, road has been built higher in low areas, tracking is being swept.
ESC19-00114 Site Preparation3/12/20193/12/20193/12/2019 11:37:57 AMPDONE
Met with excavator on site. Has trucks coming and will start hauling material. Will have road and sidewalk clean at end of day. Will finish installing BMPs when first loads are removed and there is room.
ESC17-01595 General Inspection3/12/20193/12/20193/12/2019 11:31:02 AMPPASS
WIP on foundation. Road is clean. Will sweep sidewalk and fence off lot at end of day.
ESC18-01235 General Inspection3/12/20193/12/20193/12/2019 10:55:13 AMPPART
Some trackout onto Troutner, road right outside entrance and sidewalk need to be swept. Rock entrance should be installed completely across driveway. Large piles of backfill still on site, need to be removed or stabalized. Lift running around site, shouldn't leave site to avoid tracking.
ESC18-01333 General Inspection3/12/20193/12/20193/12/2019 10:10:30 AMPPART
Lots of dirt on road underneath where the workers are parking. Perimeter controls and washout on site. Workers doing framing, will need to watch for wind blown trash.
ESC16-01457 General Inspection3/12/20193/12/20193/12/2019 10:09:21 AM PASS
No new activity, will need to watch for runoff from driveway.
ESC16-01472 General Inspection3/12/20193/12/20193/12/2019 9:48:06 AMPPASS
No dirt leaving site.
ESC18-01002 Site Preparation3/12/20193/12/20193/12/2019 9:47:41 AMAPASS
Met with builders and RP and site prep. Work will start on retaining wall starting at curb. Wattle will be installed as they work and there is room. Site and road are supposed to be cleaned at end of work days.
ESC17-01114 Aging Inspection3/12/20193/12/20193/12/2019 9:27:38 AM PASS
No trackout, not accessing the back through neighboring lot. Some trash on site, will need to watch poly covering material and make sure it doesn't blow away.
ESC16-00935 General Inspection3/12/20193/12/20193/12/2019 8:29:39 AM PASS
Inspected 3-11. No ESC issues, no activity at time of inspection.
ESC17-01378 Aging Inspection3/12/20193/12/20193/12/2019 8:27:42 AM PASS
OK to final when building permit finaled.