Inspections for the day of: Thursday, March 14, 2019.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-00406 General Inspection3/14/20193/14/20193/15/2019 11:34:48 AMPPEND
Site walk through completed. Will write up report and share with RP and all builders. No major issues at site.
ESC18-00617 General Inspection3/14/20193/14/20193/15/2019 11:34:34 AM PEND
Site walk through completed. Will write up report and share with RP and all builders. No major issues at site.
ESC18-01237 Site Preparation3/13/20193/14/20193/14/2019 12:33:23 PMAPASS
Silt fence installed on downhill perimeter, gator guard along sidewalk. Load of pitrun delivered, some is on sidewalk.
Work not scheduled to begin until monday, will need washout before pour.
ESC18-00287 Aging Inspection3/14/20193/14/20193/14/2019 12:27:16 PM PASS
Garage completed, area not stabalized.
ESC18-01675 BMP Violation3/13/20193/14/20193/14/2019 12:01:03 PMAPEND
Spoke with RP in morning.
SOme trackout coming from dirt alley, some dirt on road from genie lift. Gatorguard needs to be reinstalled.
Strets need to be swept as dirt drys.
Issues with ACHD inspector on 3-13, gave RP their contact to resolve issues.
ESC18-00172 Aging Inspection3/14/20193/14/20193/14/2019 11:53:31 AM PASS
Site is bare and below grade. No dirt leaving site, no trash.
ESC18-01718 General Inspection3/14/20193/14/20193/14/2019 11:44:46 AMPPASS
Installing forms for traffic islands. No dirt leaving site.
ESC18-00025 Aging Inspection3/14/20193/14/20193/14/2019 11:34:54 AM PASS
Some stockpiles on site.
ESC19-00041 General Inspection3/14/20193/14/20193/14/2019 10:36:03 AMPPART
Area tackified, trenched at top. Vertically shingled correctly, wrong direction in relation to streamflow.
ESC18-00071 General Inspection3/14/20193/14/20193/14/2019 9:44:35 AM PASS
All work is interior, new phases haven't begun. Some tracking from delivery of rock, no trackout leaving site. Upper witches hat about half full.
ESC18-00072 General Inspection3/14/20193/14/20193/14/2019 9:44:19 AM PASS
All work is interior, new phases haven't begun. Some tracking from delivery of rock, no trackout leaving site. Upper witches hat about half full.
ESC18-00073 General Inspection3/14/20193/14/20193/14/2019 9:43:57 AM PASS
All work is interior, new phases haven't begun. Some tracking from delivery of rock, no trackout leaving site. Upper witches hat about half full.
ESC18-00608 General Inspection3/14/20193/14/20193/14/2019 9:12:43 AM CANC
ESC18-00608 DOC - Permit Finaled3/14/20193/14/20193/14/2019 9:12:35 AMPPASS