MIS18-00091
| ESC-Conference | 3/14/2018 | 3/14/2018 | | P | |
|
|
complaint that the neighbor is doing a LOT of ground work w/o any type of permit-please verify they don't need a permit
|
ESC16-01682
| General Inspection | 3/15/2018 | 3/15/2018 | 3/15/2018 2:36:46 PM | | PEND |
|
|
Rilling on hill behind house and through side of lot. Talked to landscaper on site.
|
ESC17-00640
| General Inspection | 3/15/2018 | 3/15/2018 | 3/15/2018 12:42:24 PM | | PASS |
|
|
Site contained. Rain event had no effect on rear hillside.
|
ESC17-00246
| General Inspection | 3/15/2018 | 3/15/2018 | 3/15/2018 12:05:50 PM | | PASS |
|
|
Concrete contractor installing driveway, sidewalk, curb and gutter. Sunroc washed out into gutter, contractor cleaned up after them, I let Sunroc know.
|
ESC17-00078
| General Inspection | 3/15/2018 | 3/15/2018 | 3/15/2018 11:42:04 AM | | PART |
|
|
All storm water staying on site. Construction entrance/exit needs to be built.
|
ESC16-00329
| General Inspection | 3/15/2018 | 3/15/2018 | 3/15/2018 11:12:28 AM | | PASS |
|
|
Area surrounding addition is gravel, no issues.
|
ESC18-00107
| Site Preparation | 3/15/2018 | 3/15/2018 | 3/15/2018 11:08:27 AM | P | PASS |
|
|
Work has begun without site inspection. Currently there is a vegatation buffer. Excavator driven in and below road grade. Stabalized entrance will need to be installed when driveway is cut in.
|
ESC17-00637
| General Inspection | 3/15/2018 | 3/15/2018 | 3/15/2018 10:48:59 AM | | CANC |
|
|
|
ESC17-00637
| DOC - Permit Finaled | 3/15/2018 | 3/15/2018 | 3/15/2018 10:48:50 AM | P | PASS |
|
|
|
ESC17-00346
| DOC - Permit Finaled | 3/15/2018 | 3/15/2018 | 3/15/2018 10:32:33 AM | P | PASS |
|
|
|