ESC18-01022
| General Inspection | 3/16/2020 | 3/16/2020 | 3/19/2020 11:45:00 AM | P | PASS |
|
|
New trail cut into middle of hillside. Crew repairing sidewalks at bottom of goshawk.
|
ESC19-00781
| Site Final | 3/13/2020 | 3/16/2020 | 3/19/2020 11:42:18 AM | P | PASS |
|
|
|
ESC19-01494
| Tracking Control | 3/16/2020 | 3/16/2020 | 3/18/2020 9:11:55 AM | P | PASS |
|
|
Street, driveway, and sidewalk have been swept. No one parked on lot, no trailers on lot. Plywood walkway installed.
|
ESC18-01255
| General Inspection | 3/16/2020 | 3/16/2020 | 3/17/2020 9:19:03 AM | | PASS |
|
|
Current activity with risk is masonary. Mixer is in secondary containment, washout on site. Scaffolding is also fenced so minimal amounts of mud falling. Will need to watch tracking from deliveries. At time of inspection there was an unattended hose turned on and running onto front street, water was starting to back up and will pick any pollutants in gutter.
|
ESC19-00114
| General Inspection | 3/16/2020 | 3/16/2020 | 3/17/2020 8:51:14 AM | | PASS |
|
|
Still needs landscaping. No runoff issues, haven'y received any new complaints
|
ESC18-00371
| Aging Inspection | 3/16/2020 | 3/16/2020 | 3/16/2020 3:12:22 PM | | PASS |
|
|
Exterior work completed and lot landscaped.
|
ESC18-00914
| Aging Inspection | 3/16/2020 | 3/16/2020 | 3/16/2020 3:01:25 PM | | CANC |
|
|
|
ESC18-00914
| DOC - Permit Finaled | 3/16/2020 | 3/16/2020 | 3/16/2020 3:01:18 PM | P | PASS |
|
|
|
ESC18-00349
| General Inspection | 3/16/2020 | 3/16/2020 | 3/16/2020 2:48:49 PM | | PART |
|
|
4 remaining parcels, 2 have homes starting to frame, 1 is poured, excavation on last. Some dirt on sidewalk.
|
ESC19-01427
| BMP Violation | 3/12/2020 | 3/16/2020 | 3/16/2020 2:28:01 PM | A | PART |
|
|
Big obvious trash was cleaned
|
ESC20-00264
| Site Preparation | 3/16/2020 | 3/16/2020 | 3/16/2020 2:23:24 PM | P | PASS |
|
|
Met with owner/builder and did site walk. Will begin with stripping topsoil and will keep it stockpiled. Will provide entrance for when hauling fill. Will do lifts on rear hill. Currently only grading approved, will not build yet.
|
ESC17-00791
| General Inspection | 3/16/2020 | 3/16/2020 | 3/16/2020 12:28:23 PM | | CANC |
|
|
|
ESC19-00371
| General Inspection | 3/16/2020 | 3/16/2020 | 3/16/2020 12:28:05 PM | P | PASS |
|
|
No tracking, no failures, equipment all staged by trent point entrance. Vortex pond 67.1 NTU Outlet below dam 102 NTU Creek at end of project 94.5 NTU Could not find where water was picking turbidity on site.
|
ESC18-01636
| General Inspection | 3/16/2020 | 3/16/2020 | 3/16/2020 12:03:26 PM | | PASS |
|
|
No pond excavation. Ditch for dewatering water has been piped. No plans to do any work in area of contanimation for about a month. No work on NE section of project. Placing fill already hauled from ponds. Work on finishing storm pond overflow along greenbelt and under road.
|
ESC18-00179
| General Inspection | 3/16/2020 | 3/16/2020 | 3/16/2020 11:16:09 AM | | PASS |
|
|
WIP on townhomes. Site is clean. Using plywood when genie lift leaving pavement. No wind blown trash. Trash fence still protecting creek.
|
ESC19-00324
| General Inspection | 3/16/2020 | 3/16/2020 | 3/16/2020 11:08:33 AM | P | PART |
|
|
No failures from rain event. Crew on site trenching for new silt fence along Warm Springs. Lots of mud tracked on to site in upper area. Crews are installing Basalit retaining walls terraced on lots. Crew at bottom working on entrance area, looks like they are installing sidewalk. Utilities still not clean and completed. Areas of armored channel along road still full of dirt from utility contractor. Dirt on teresa in low spot by warm springs, look like there may still be an open trench, currently filled with water, can't tell what the depth is.
|
ESC17-00519
| General Inspection | 3/16/2020 | 3/16/2020 | 3/16/2020 10:37:57 AM | P | PASS |
|
|
Few lots still need landscaping. Streets will need to be swept and inlet protection removed before site final.
|
ESC18-01071
| General Inspection | 3/16/2020 | 3/16/2020 | 3/16/2020 10:32:11 AM | P | PASS |
|
|
Home construction has begun in NE corner. No current issues, washout at end of road. Workers parked on street, no blown trash.
|
ESC19-00797
| General Inspection | 3/16/2020 | 3/16/2020 | 3/16/2020 10:12:19 AM | P | PASS |
|
|
No disturbances.
|
ESC18-00983
| General Inspection | 3/16/2020 | 3/16/2020 | 3/16/2020 9:58:35 AM | P | PART |
|
|
No workers on site. All foundations on lower section have been poured, strrets and sidewalks clean. Up on tiger lilly there is lots of dirt on sidewalks and washout is about full. Sent message to listed RP clint.
|
ESC19-00145
| General Inspection | 3/16/2020 | 3/16/2020 | 3/16/2020 9:34:06 AM | | PASS |
|
|
Site is clean and contained. Genie lift running in back by railroad, if it comes out area gets cleaned. No blowing trash or trackout. Will get a washout for paint, drywall, and stucco on next phase.
|
ESC20-00108
| Site Preparation | 3/16/2020 | 3/16/2020 | 3/16/2020 9:12:16 AM | P | PASS |
|
|
Foundation poured, washout used. All backfill still on site.
|
ESC20-00113
| Site Preparation | 3/16/2020 | 3/16/2020 | 3/16/2020 9:11:57 AM | P | PASS |
|
|
Foundation poured, washout used. All backfill still on site.
|
ESC19-01653
| Site Final | 3/16/2020 | 3/16/2020 | 3/16/2020 9:07:17 AM | P | PASS |
|
|
|