Inspections for the day of: Thursday, March 19, 2020.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-00760 Site Final3/19/20203/19/20203/24/2020 8:27:49 AMPPASS
ESC19-00644 Aging Inspection3/19/20203/19/20203/19/2020 1:07:09 PM PASS
BLD never issues
ESC19-00555 Aging Inspection3/19/20203/19/20203/19/2020 12:09:53 PM CANC
ESC19-00555 DOC - Permit Finaled3/19/20203/19/20203/19/2020 12:09:47 PMPPASS
ESC17-01287 General Inspection3/19/20203/19/20203/19/2020 11:54:15 AM PASS
Will monitor revegetation.
ESC18-01447 General Inspection3/19/20203/19/20203/19/2020 11:53:51 AM PASS
Site is clean and contained.
ESC15-00857 General Inspection3/19/20203/19/20203/19/2020 11:46:31 AM PASS
Vacant lots are all stable. Building lots have BMPs and are the responsibility of individual builders.
ESC18-00844 General Inspection3/19/20203/19/20203/19/2020 11:20:31 AM PASS
WIP on landscaping
ESC19-00221 Aging Inspection3/19/20203/19/20203/19/2020 11:02:05 AM PASS
Hauling in material and doing lifts, strata was on site.
ESC19-00220 Aging Inspection3/19/20203/19/20203/19/2020 11:01:42 AM PASS
Hauling in material and doing lifts, strata was on site.
ESC19-00584 General Inspection3/19/20203/19/20203/19/2020 10:27:44 AMPFAIL
Discharge was greater than 1000 NTU, would not read on meter, exceeded capacity.
Talked to both RP Jason and Foreman Rex.
Crews were supposed to turn off pumps before work, only shut one down. Rex immediately turned off second pump and flow slowed, no new water.
All dewatering is supposed to be pumped to west pond, still has pump running, there is no outlet.
Lots of discharge to Wahling Creek, no turbid water reached Barber bridge, hoping that all the vegetation has filtered it out.
Told Jason to log an illicit discharge in SWPPP and self report.
Rex will get all sediment out of settling area and not restrt the well point pumps.
Bypass line dewatering is beng pumped under road and into lined pond on north side of road.
ESC16-01560 General Inspection3/19/20203/19/20203/19/2020 9:50:59 AM PASS
No workers on site.
Pad has been poured, washouts used and in good shape. No esc issues.
ESC19-00613 Aging Inspection3/19/20203/19/20203/19/2020 9:28:06 AM PASS
Outside work looks completed. Some paint buckets and materials stored in front yard.