MIS18-00091
| ESC-Conference | 3/14/2018 | 3/14/2018 | | P | |
|
|
complaint that the neighbor is doing a LOT of ground work w/o any type of permit-please verify they don't need a permit
|
ESC17-00227
| General Inspection | 3/20/2018 | 3/20/2018 | 3/21/2018 11:07:37 AM | | PASS |
|
|
Hillside BMPs in place. No issues on site.
|
ESC17-00513
| General Inspection | 3/20/2018 | 3/20/2018 | 3/20/2018 2:15:19 PM | | PASS |
|
|
Talked with foreman on site. Phase 1 is complete. Phase two is scheduled to begin in a few weeks, as soon as plans are finalized. BMPs still in place, let them know we will be back when they start to check BMPs.
|
ESC17-00321
| Aging Inspection | 3/20/2018 | 3/20/2018 | 3/20/2018 1:35:21 PM | | PASS |
|
|
WIP on garage. SIte is stable, no issues.
|
ESC17-01122
| Random Inspection | 3/20/2018 | 3/20/2018 | 3/20/2018 1:31:48 PM | P | PASS |
|
|
WIP. Home and garage both framed and walled. Entire yard is bare and contained to site.
|
ESC17-01032
| Random Inspection | 3/20/2018 | 3/20/2018 | 3/20/2018 1:28:03 PM | P | CANC |
|
|
|
ESC17-01032
| DOC - Permit Finaled | 3/20/2018 | 3/20/2018 | 3/20/2018 1:27:57 PM | P | PASS |
|
|
|
ESC17-00662
| General Inspection | 3/20/2018 | 3/20/2018 | 3/20/2018 12:31:07 PM | | PASS |
|
|
Vacant and for sale. No dirt leaving site.
|
ESC17-00199
| Aging Inspection | 3/20/2018 | 3/20/2018 | 3/20/2018 11:30:33 AM | | PASS |
|
|
WIP. Area is disturbed but contained, all under grade of sidewalk. No dirt leaving site.
|
ESC17-00340
| Aging Inspection | 3/20/2018 | 3/20/2018 | 3/20/2018 11:29:28 AM | | CANC |
|
|
|
ESC17-00340
| DOC - Permit Finaled | 3/20/2018 | 3/20/2018 | 3/20/2018 11:29:13 AM | P | PASS |
|
|
|
ESC17-00672
| General Inspection | 3/20/2018 | 3/20/2018 | 3/20/2018 10:55:31 AM | | PASS |
|
|
Building complete, area surrounding paved. Building permit still open.
|
ESC17-00432
| General Inspection | 3/20/2018 | 3/20/2018 | 3/20/2018 10:17:30 AM | | CANC |
|
|
|
ESC17-00432
| DOC - Permit Finaled | 3/20/2018 | 3/20/2018 | 3/20/2018 10:17:23 AM | P | PASS |
|
|
|
ESC17-00138
| General Inspection | 3/20/2018 | 3/20/2018 | 3/20/2018 9:58:23 AM | P | PEND |
|
|
Two exits and neither are stabalized. Some trackout, called RP Jeremy and asked for repairs and cleaning. Rest of site is contained and clean, trash was being removed while I was on site.
|
ESC17-00936
| General Inspection | 3/20/2018 | 3/20/2018 | 3/20/2018 9:58:08 AM | P | PEND |
|
|
Two exits and neither are stabalized. Some trackout, called RP Jeremy and asked for repairs and cleaning. Rest of site is contained and clean, trash was being removed while I was on site.
|
ESC17-00011
| General Inspection | 3/20/2018 | 3/20/2018 | 3/20/2018 9:42:00 AM | P | PART |
|
|
Southern lot is no longer being used for storage, all storage is now on west end of project. Lots of trackout onto Elder. Site has lots of small pieces of trash and lumber scraps laying around. South side of building is scaffolded and covered with plastic, will need to monitor in wind for being torn off and blowing off site. Perimeter has been landscaped.
|
ESC17-00404
| General Inspection | 3/20/2018 | 3/20/2018 | 3/20/2018 9:37:12 AM | P | PART |
|
|
Southern lot is no longer being used for storage, all storage is now on west end of project. Lots of trackout onto Elder. Site has lots of small pieces of trash and lumber scraps laying around. South side of building is scaffolded and covered with plastic, will need to monitor in wind for being torn off and blowing off site. Perimeter has been landscaped.
|
ESC17-00422
| General Inspection | 3/20/2018 | 3/20/2018 | 3/20/2018 9:19:24 AM | P | PASS |
|
|
Site contained. Good rock exit on Canal, no trackout. Perimeter control intact.
|
ESC17-00189
| Aging Inspection | 3/20/2018 | 3/20/2018 | 3/20/2018 9:07:32 AM | | PASS |
|
|
WIP, carpenter on site. Outside work looks complete.
|