Inspections for the day of: Friday, March 22, 2019.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-01531 Complaint Inspection3/22/20193/22/20193/27/2019 1:10:05 PMPPASS
Sidewalk has been removed at two locations. Concrete washout on site, extra mud was dumped on lot. Some mud on sidewalk but not bad. Street looks like it has been swept.
ESC19-00249 Site Preparation3/22/20193/22/20193/25/2019 10:15:37 AMPPART
Needs stabalized entrance and parking area, workers parked on sidewalk.
Will need concrete washout or have washout hauled back to plant.
Permits on fence.
Message left with owner.
ESC18-00440 General Inspection3/22/20193/22/20193/22/2019 2:30:03 PM PASS
Still needs stabalization.
ESC18-00462 General Inspection3/22/20193/22/20193/22/2019 12:39:08 PM PASS
Driveway completed. Part of old wall has failed, no dirt or runoff from breach.
ESC17-00954 General Inspection3/14/20193/22/20193/22/2019 12:38:14 PMPPASS
Site has been cleaned up. Stockpiles on upper lot (3535%have been reduced, new berm built to divert water into upper pond instaed of flowing all the way down. Berm built on bottom of lot (3535) as well, wattle also between berm and rock channel.
Berm rebuilt on bottom of lot 3477.
Gator guard at lot 3455 has been cleaned.
ESC18-01433 General Inspection3/14/20193/22/20193/22/2019 12:27:33 PMAPASS
Finishing up on installing last gator guard and filling rill. Retentions around driveway have been cleaned.
ESC18-00429 General Inspection3/22/20193/22/20193/22/2019 12:05:56 PM PEND
Lots of trackout on roads.
Sprinkler installers and landscapers on site making mess. Both crews have brooms and are supposed to clean. Arear around tennis courts hasn't grown needs to be reseeded. Old dry washout should be hauled away.
ESC17-01009 General Inspection3/22/20193/22/20193/22/2019 11:50:09 AM PASS
Foundation poured, hasn't been backfilled. No dirt leaving site.
ESC17-01710 BMP Violation3/19/20193/22/20193/22/2019 11:42:51 AMAPART
Road and sidewalk swept, new washout installed. Old dried dumped washout hasn't been cleaned up.
ESC17-01088 BMP Violation3/20/20193/22/20193/22/2019 11:05:14 AMAPEND
Cleanup not done at time of inspection. Talked to foreman on site, will clean later in day. Follow up scheduled for next week.
ESC18-01782 BMP Violation3/20/20193/22/20193/22/2019 11:03:41 AMPPEND
Talked with foreman, will get everything cleaned up today. Landscaper is also trash pick up guy, has been running late with removals.
ESC16-00225 General Inspection3/22/20193/22/20193/22/2019 10:02:17 AM PASS
Entrance trackout has been cleaned.
ESC17-01749 General Inspection3/22/20193/22/20193/22/2019 10:00:36 AM PASS
Lots of activity at site, no dirt or trackout.
ESC19-00178 General Inspection3/22/20193/22/20193/22/2019 9:52:17 AMPFAIL
Excavation began without site prep. No installed perimeter controls, rill runs down to birdsong. Message sent to RP.
ESC18-01002 BMP Violation3/20/20193/22/20193/22/2019 9:06:28 AMAPASS
Met with contractors on site. Will put in temporary rock entrance and make sure to sweep at end of day. Starting retaining walls, will dig washout and line. Will eventually move entrance to top when sewer and gas work completed.