ESC16-00936
| General Inspection | 3/23/2018 | 3/23/2018 | 3/23/2018 2:56:58 PM | | PASS |
|
|
Hillside BMPs intact after rain event. Drain on hill worked, no sign of overflowing. Outlet still isn't lowest point.
|
ESC16-00556
| General Inspection | 3/23/2018 | 3/23/2018 | 3/23/2018 2:56:13 PM | | FAIL |
|
|
Few homes under construction. Areas where building have trackout and piles of trash. Looks like no one cares about keeping area clean.
|
MIS18-00101
| ESC-Conference | 3/22/2018 | 3/23/2018 | 3/23/2018 12:01:42 PM | A | FAIL |
|
|
Work being done without permits. Removal and modification of old retaing walls and driveway. SWO Issued and double fee. Met contractor and hillside engineer on site. Site will need hillside engineering approved, building permit, grading permit, and ESC permit.
|
ESC17-01749
| Random Inspection | 3/23/2018 | 3/23/2018 | 3/23/2018 10:47:08 AM | P | PEND |
|
|
WIP, excavator and two front end loaders on site. Lots of trackout onto road, excavator has been good about cleaning trackout, will follow up.
|
ESC17-00954
| Complaint Inspection | 3/23/2018 | 3/23/2018 | 3/23/2018 10:46:07 AM | P | PEND |
|
|
Complaint received describing muddy offsite discharge to home and to gutter.
Met with homeowner. Developer has already sent crews to clean up mess. New retaining wall is causing draining into his driveway and yard. They have pictures and videos that will be sent to me. Spoke with PW Hillside Engineer Melissa and she is going to look at wall plans. There is some dirt in gutters down to Bogus Basin Rd. that will need to be cleaned/swept. Follow up onsite conference to be conducted 3/27
|
ESC15-01138
| General Inspection | 3/23/2018 | 3/23/2018 | 3/23/2018 8:38:06 AM | | PASS |
|
|
Inspected 3-22. Working on interior. Lot is not stabalized and is contained to site.
|