Inspections for the day of: Monday, March 23, 2020.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC19-00116 General Inspection3/23/20203/23/20203/24/2020 11:46:34 AM PASS
Franz Whitte on site installing irragation system. Curb and gutters completed, paving has begun.
ESC19-00083 General Inspection3/23/20203/23/20203/23/2020 12:50:22 PM PASS
Lawnco on site installing irragation.
ESC18-01102 General Inspection3/23/20203/23/20203/23/2020 12:09:57 PM PASS
House is finished. Rear is a sand hill, lots of blanket installed, not stable.
ESC17-00768 Aging Inspection3/23/20203/23/20203/23/2020 11:54:06 AM CANC
ESC17-00768 DOC - Permit Finaled3/23/20203/23/20203/23/2020 11:53:59 AMPPASS
ESC19-00086 General Inspection3/23/20203/23/20203/23/2020 11:52:36 AM CANC
ESC06-01306 General Inspection3/23/20203/23/20203/23/2020 11:38:21 AM PASS
Exterior and landscaping about completed. Some sidewalk repair inside site. No issues.
ESC18-00172 Aging Inspection3/23/20203/23/20203/23/2020 11:32:54 AM PASS
Still not landscaped, exterior looks finished.
ESC18-00373 General Inspection3/23/20203/23/20203/23/2020 11:25:17 AM PASS
Building shell is completed, parking lot and curbing where already on site. Drains in parking lot protected. Wattle along perimeter, no issues.
ESC18-00176 Aging Inspection3/23/20203/23/20203/23/2020 11:06:56 AM PASS
Exterior and parking lot completed. Large pile of trash on site, all along fence.
Site still needs landscaping.
ESC19-00584 General Inspection3/23/20203/23/20203/23/2020 10:53:50 AMPPASS
No pond dewatering. East pond has been excavated to elevation, excavator still on site working sides for grade.
West pond will be getting dewatered into east pond.
Sewer line work going across warm springs. Easte end water is being pumped into cow pasture on north side of road.
West side is hitting contanimated water and soil. Soil is being seperated into own pile. Dirty water is being pumped into lined pond for holding.
ESC19-01076 General Inspection3/23/20203/23/20203/23/2020 10:15:36 AMPPASS
No workers at site. Common driveway/ lleyway is completed. Site utilities in place. No work on any of the units.
ESC19-01349 Site Final3/23/20203/23/20203/23/2020 10:14:52 AMPPASS
ESC19-00559 Site Final3/20/20203/23/20203/23/2020 9:58:57 AMPPASS
ESC19-00583 Site Final3/20/20203/23/20203/23/2020 9:58:42 AMPPASS
ESC19-00371 Complaint Inspection3/23/20203/23/20203/23/2020 9:34:49 AMPPASS
Plastic sheeting was pulled up from wind. Area affected was inside reservoir area behind dam, lining on road was all in place.
I pulled the liner back up and weighed down the seam with rocks, rolled boulder on lower section of plastic to keep the wind from blowing it off.
There was never a risk of discharge.
ESC17-00078 General Inspection3/23/20203/23/20203/23/2020 9:12:12 AM PART
WIP on multiple homes.
Landscapers have some rock staged on road.
Genie lift running around causing tracking around a few homes.
ESC17-01114 Aging Inspection3/23/20203/23/20203/23/2020 9:04:41 AM CANC
ESC17-01114 DOC - Permit Finaled3/23/20203/23/20203/23/2020 9:04:35 AMPPASS