Inspections for the day of: Tuesday, March 24, 2020.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-00985 General Inspection3/24/20203/24/20203/24/2020 1:03:51 PM PASS
Site contained
ESC18-01453 Aging Inspection3/24/20203/24/20203/24/2020 11:47:27 AM CANC
ESC18-01453 DOC - Permit Finaled3/24/20203/24/20203/24/2020 11:47:21 AMPPASS
expired
ESC19-00389 General Inspection3/24/20203/24/20203/24/2020 11:07:58 AM PASS
All external work and parking lot work looks completed. Some shingles, pieces of entrances, and equipment still staged in parking lot.
ESC19-00658 General Inspection3/24/20203/24/20203/24/2020 10:35:43 AM PASS
No new activity.
ESC20-00002 General Inspection3/24/20203/24/20203/24/2020 10:14:36 AMPFAIL
Lots of dirt from backfill on sidewalks.
Knife river doing site prep on far south of site. Road is not paved to south cole. Heavy equipment is running throughout site.
Multiple homes under construction on western perimeter.
No homes have begun on north side. Culdesac curbing completed, not paved.
Multiple phases of construction under multiple permits. Lots of overlap, site getting same inspection report for all permits.
ESC19-01518 General Inspection3/24/20203/24/20203/24/2020 10:14:19 AMPFAIL
Lots of dirt from backfill on sidewalks.
Knife river doing site prep on far south of site. Road is not paved to south cole. Heavy equipment is running throughout site.
Multiple homes under construction on western perimeter.
No homes have begun on north side. Culdesac curbing completed, not paved.
Multiple phases of construction under multiple permits. Lots of overlap, site getting same inspection report for all permits.
ESC19-00304 General Inspection3/24/20203/24/20203/24/2020 10:13:36 AMPFAIL
Lots of dirt from backfill on sidewalks.
Knife river doing site prep on far south of site. Road is not paved to south cole. Heavy equipment is running throughout site.
Multiple homes under construction on western perimeter.
No homes have begun on north side. Culdesac curbing completed, not paved.
Multiple phases of construction under multiple permits. Lots of overlap, site getting same inspection report for all permits.
ESC20-00325 General Inspection3/24/20203/24/20203/24/2020 10:13:22 AMPFAIL
Knife river truck washed out onto ground, lined washout on site, was used by IMC truck.
Lots of dirt from backfill on sidewalks.
Knife river doing site prep on far south of site. Road is not paved to south cole. Heavy equipment is running throughout site.
Multiple homes under construction on western perimeter.
No homes have begun on north side. Culdesac curbing completed, not paved.
Multiple phases of construction under multiple permits. Lots of overlap, site getting same inspection report for all permits.
ESC19-00608 General Inspection3/24/20203/24/20203/24/2020 9:37:53 AM PASS
Site contained. Located on airport/hanger.
ESC18-00900 General Inspection3/24/20203/24/20203/24/2020 9:37:26 AMPPASS
No new site activity. One worker from track utilities on site.
ESC19-00630 General Inspection3/24/20203/24/20203/24/2020 9:21:05 AM PASS
All work in fenced in yard behind existing building.
ESC18-01431 Aging Inspection3/24/20203/24/20203/24/2020 9:00:37 AM PASS
Exterior looks completed. Area is all surrounded by pit run, no issues.