ESC17-00985
| General Inspection | 3/24/2020 | 3/24/2020 | 3/24/2020 1:03:51 PM | | PASS |
|
|
Site contained
|
ESC18-01453
| Aging Inspection | 3/24/2020 | 3/24/2020 | 3/24/2020 11:47:27 AM | | CANC |
|
|
|
ESC18-01453
| DOC - Permit Finaled | 3/24/2020 | 3/24/2020 | 3/24/2020 11:47:21 AM | P | PASS |
|
|
expired
|
ESC19-00389
| General Inspection | 3/24/2020 | 3/24/2020 | 3/24/2020 11:07:58 AM | | PASS |
|
|
All external work and parking lot work looks completed. Some shingles, pieces of entrances, and equipment still staged in parking lot.
|
ESC19-00658
| General Inspection | 3/24/2020 | 3/24/2020 | 3/24/2020 10:35:43 AM | | PASS |
|
|
No new activity.
|
ESC20-00002
| General Inspection | 3/24/2020 | 3/24/2020 | 3/24/2020 10:14:36 AM | P | FAIL |
|
|
Lots of dirt from backfill on sidewalks. Knife river doing site prep on far south of site. Road is not paved to south cole. Heavy equipment is running throughout site. Multiple homes under construction on western perimeter. No homes have begun on north side. Culdesac curbing completed, not paved. Multiple phases of construction under multiple permits. Lots of overlap, site getting same inspection report for all permits.
|
ESC19-01518
| General Inspection | 3/24/2020 | 3/24/2020 | 3/24/2020 10:14:19 AM | P | FAIL |
|
|
Lots of dirt from backfill on sidewalks. Knife river doing site prep on far south of site. Road is not paved to south cole. Heavy equipment is running throughout site. Multiple homes under construction on western perimeter. No homes have begun on north side. Culdesac curbing completed, not paved. Multiple phases of construction under multiple permits. Lots of overlap, site getting same inspection report for all permits.
|
ESC19-00304
| General Inspection | 3/24/2020 | 3/24/2020 | 3/24/2020 10:13:36 AM | P | FAIL |
|
|
Lots of dirt from backfill on sidewalks. Knife river doing site prep on far south of site. Road is not paved to south cole. Heavy equipment is running throughout site. Multiple homes under construction on western perimeter. No homes have begun on north side. Culdesac curbing completed, not paved. Multiple phases of construction under multiple permits. Lots of overlap, site getting same inspection report for all permits.
|
ESC20-00325
| General Inspection | 3/24/2020 | 3/24/2020 | 3/24/2020 10:13:22 AM | P | FAIL |
|
|
Knife river truck washed out onto ground, lined washout on site, was used by IMC truck. Lots of dirt from backfill on sidewalks. Knife river doing site prep on far south of site. Road is not paved to south cole. Heavy equipment is running throughout site. Multiple homes under construction on western perimeter. No homes have begun on north side. Culdesac curbing completed, not paved. Multiple phases of construction under multiple permits. Lots of overlap, site getting same inspection report for all permits.
|
ESC19-00608
| General Inspection | 3/24/2020 | 3/24/2020 | 3/24/2020 9:37:53 AM | | PASS |
|
|
Site contained. Located on airport/hanger.
|
ESC18-00900
| General Inspection | 3/24/2020 | 3/24/2020 | 3/24/2020 9:37:26 AM | P | PASS |
|
|
No new site activity. One worker from track utilities on site.
|
ESC19-00630
| General Inspection | 3/24/2020 | 3/24/2020 | 3/24/2020 9:21:05 AM | | PASS |
|
|
All work in fenced in yard behind existing building.
|
ESC18-01431
| Aging Inspection | 3/24/2020 | 3/24/2020 | 3/24/2020 9:00:37 AM | | PASS |
|
|
Exterior looks completed. Area is all surrounded by pit run, no issues.
|