ESC17-01376
| General Inspection | 3/27/2018 | 3/27/2018 | 4/2/2018 8:17:53 AM | P | PASS |
|
|
Inspected 3/30. Sidewalks have been swept, dirt contained to site. Some dirt was on ped ramps, couldn't prove it was from site since surrounding sidewalks were clean.
|
ESC17-00330
| Aging Inspection | 3/27/2018 | 3/27/2018 | 3/29/2018 10:24:28 AM | | PASS |
|
|
Front lot still exposed. No dirt leaving site. No major ground disturbances.
|
ESC17-01209
| Complaint Inspection | 3/27/2018 | 3/27/2018 | 3/29/2018 10:14:16 AM | P | PASS |
|
|
storm drain protection left behind causing issue I removed DIs. Talked to Eagle Energy and they will come pick them up to be disposed. Left on end of silver sage.
|
ESC18-00224
| General Inspection | 3/23/2018 | 3/27/2018 | 3/29/2018 9:49:50 AM | A | PASS |
|
|
Area has been rough graded and there are some survey stakes. No major activities taking place. Neighborhood development on north edge of property is under construction.
|
ESC16-00617
| General Inspection | 3/27/2018 | 3/27/2018 | 3/28/2018 1:59:29 PM | | PASS |
|
|
Foundation work in process. No dirt leaving site.
|
ESC17-00013
| General Inspection | 3/27/2018 | 3/27/2018 | 3/28/2018 11:24:49 AM | | PASS |
|
|
Area has been cleaned up. New washout on site. Developer hasn't started any work on homes.
|
ESC17-00402
| Aging Inspection | 3/27/2018 | 3/27/2018 | 3/28/2018 11:10:25 AM | | CANC |
|
|
|
ESC15-00556
| General Inspection | 3/27/2018 | 3/27/2018 | 3/28/2018 10:50:47 AM | | PART |
|
|
Lots of dirt on road by new construction on Hakkasan and Taboo. Rest of neighborhood is completed and clean.
|
ESC17-00456
| Aging Inspection | 3/27/2018 | 3/27/2018 | 3/28/2018 10:06:58 AM | | PART |
|
|
Protection still in DIs. Neighboring lot still has stockpiling.
|
ESC17-00382
| General Inspection | 3/27/2018 | 3/27/2018 | 3/27/2018 4:05:13 PM | | PASS |
|
|
Only exposed area is in rear parking off alley. No issues.
|
ESC17-00190
| General Inspection | 3/27/2018 | 3/27/2018 | 3/27/2018 4:00:19 PM | | PASS |
|
|
No issues after rain event. Some standing water on a few pads.
|
ESC16-00353
| General Inspection | 3/27/2018 | 3/27/2018 | 3/27/2018 2:15:51 PM | | FAIL |
|
|
Lots of sand in the north side gutter. Sand is coming from lot on bottom of hill, rill forming from graded level down drive and onto sidewalk and road.
|
ESC17-01674
| Tracking Control | 3/21/2018 | 3/27/2018 | 3/27/2018 12:58:52 PM | A | PEND |
|
|
Currently on site fixing entrance.
|
ESC16-01725
| General Inspection | 3/27/2018 | 3/27/2018 | 3/27/2018 12:31:29 PM | P | PASS |
|
|
WIP. Lots of trackout on site.
|
ESC16-01724
| General Inspection | 3/27/2018 | 3/27/2018 | 3/27/2018 12:31:13 PM | P | PART |
|
|
WIP. Lots of trackout on site.
|
ESC17-00566
| Aging Inspection | 3/27/2018 | 3/27/2018 | 3/27/2018 12:17:35 PM | | PASS |
|
|
Looks complete and stable. Building permit still open.
|
ESC17-01200
| General Inspection | 3/27/2018 | 3/27/2018 | 3/27/2018 11:39:59 AM | P | PASS |
|
|
Large site, 2 buildings up and work on 3rd pad. Inspect all together. Washout is clean and maintained, no trackout or other issues. Site is mostly below grade and no dirt is leaving site. Worker parking area is pit run and not muddy, only one way in or out. Lots of water currently on site, dust is not an issue. Machines in mud are not leaving site.
|
ESC17-01043
| General Inspection | 3/27/2018 | 3/27/2018 | 3/27/2018 11:39:41 AM | P | PASS |
|
|
Large site, 2 buildings up and work on 3rd pad. Inspect all together. Washout is clean and maintained, no trackout or other issues. Site is mostly below grade and no dirt is leaving site. Worker parking area is pit run and not muddy, only one way in or out. Lots of water currently on site, dust is not an issue. Machines in mud are not leaving site.
|
ESC16-00242
| General Inspection | 3/27/2018 | 3/27/2018 | 3/27/2018 11:03:07 AM | P | PASS |
|
|
Met with Casey from Steck. Weekly walkthroughs are done on Wednesday. Lots of standing water on site, no mud leaving area. Stormwater all stays on Micron campus.
|
ESC18-00006
| General Inspection | 3/27/2018 | 3/27/2018 | 3/27/2018 10:27:39 AM | P | PASS |
|
|
WIP on steel vertical frame. Site has spill kits, generators are in secondary containment, chemicals all safely stored in own connex box. No trackout leaving site, no dirt runoff anywhere. Designated smoking areas, site free of ciggarette butts and loose trash. 3 dumpsters and a metal recycling box on site, 2 of the dumpsters have lids. Geotextile covering inlet has been torn off.
|
ESC16-00439
| General Inspection | 3/27/2018 | 3/27/2018 | 3/27/2018 9:50:01 AM | | PASS |
|
|
Site prepped for road, curb, and gutters. No workers on site.Site has no issues, no trackout leaving site.
|